Docket No. 50-293 Mr. William D. Harrington Senior Vice President, Nuclear Boston. Edison Company 800 Boylston Street Boston, Massachusetts 02199
Dear Mr. Harrington:
SUBJECT:
MASONRY WALLS DESIGN REVIEW /IE BULLETIN 80-11 (TAC 42885)
RE:
Pilgrim Nuclear Power Station We have completed our review of your submittals in response to IE Bulletin 80-11 and conclude that the re-evaluation and testing requirements in Items 2(b) and 3 of the bulletin have been met for the safety-related masonry l
walls at Pilgrim Station. Consequently, there is reasonable assurance that i
these walls will withstand the specific design load conditions without impairment of (a) wall integrity or (b) the performance of required safety functions.
l Enclosed is a copy of our Safety Evaluation and the Technical Evaluation Report relative to this review.
Sincerely,
/S/
John A. Zwolinski, Director
[
BWR Project Directorate #1 Division of BWR Licensing P
Enclosures:
1.
Safety Evaluation 2.
Technical Evaluation Report cc w/ enclosures:
See next page DistrJbutio_n
_ Docket File N J. Zwolinski P. Leech NRC T tItaT PDR 0 ELD N. Chokshi BWR#1 Reading E. Jordan C. Jamerson l
B. Grimes J. Partlow ACRS(10)
Gray File N. Thompson DPL DPL B DPL:1WR I
CJamersen Pleech:jch JZwolinski k 'N86 4/A/86
%/86 8606190655 860606 PDR ADOCK 05000293 G
c Mr. William D. Harrington Boston Edison Company Pilgrim Nuclear Power Station cc:
Mr. Charles J. Mathis, Station Mgr.
Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office U. S. Nuclear Regulatory Commission Post Office Box 867 Plymouth, Massachusetts 02360 Chairman, Board of Selectmen 11 Lincoln Street 1
Plymouth, Massachusetts 02360 i
Office of the Commissioner Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 02108 Office of the Attorney General 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street Boston, Massachusetts 02111 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. James D. Keyes Boston Edison Company 25 Braintree Hill Office Park Braintree, Massachusetts 02184 19