ML20206C875
| ML20206C875 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 11/03/1988 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20206C877 | List: |
| References | |
| NUDOCS 8811160445 | |
| Download: ML20206C875 (2) | |
See also: IR 05000353/1988025
Text
\\
.. : . .
.
.
4
03 NOV 1988
Docket No. 50-353
Philadelphia Electric Company
ATTN: Mr. C. A. McNeill
Executive Vice President-Nuclear
Correspondence Control Desk
P.O. Box 7520
Philadelphia, PA
19101
Gentlemen:
Subject:
Inspection Report 50-353/88-25
This letter transmits our report of the routine resident safety inspection by
Messrs. R. A. Gramm and R. L. Fuhrmeister on September 12, 1988 to October 16,
1988 at the Limerick Generating Station, Unit 2, Limerick, Pennsylvania of
activities authorized by NRC License No. CPPR-107 and to the discussions held
by the inspectors with Mr. J. M. Corcoran and other members of your staff at
the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed NRC Region
! Inspection Report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel and observations by the inspectors.
Based on the results of this inspection, it appears that an activity was not
conducted in full compliance with NRC requirements, as set forth in the Notice
of Violation involving the failure to incorporate the Redundant Reactivity
Control System wiring design change into the Unit 2 design, and is enclosed
as Appendix A.
In your response to this violation please let us know what
actions you have taken to provide assurance that other Unit 1 modifications
have been appropriately included in the design and implemented at Unit 2.
his
vioiation has been categorized by severity level in accordance with the NRC
enforcement policy (10 CFR 2, Appendix C).
A response to this report is required by 10 CFR 2.201.
Please follow the
instructions in Appendix A in the preparation of your response.
The response
directed by Appendix A, Notice of Violation, is not subject to the clearance
procedures of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, PL 96-511.
8811160445 sej jo3
DR
A00CK 05000353
PNU
OFFICIAL RECORD COPY
IR LIM 2 88-25 - 0001.0.0
11/03/88
r
GOIN
.
_ _ _ _
-L
..
,.
.
.
Philadelphia Electric Company
2
08 NOV 1988
Your cooperation is appreciated.
Sincerely,
tuest. mNto w
p
Edward C. Wenzinger, Chief
'
Projects Branch No. 2
Y
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report 50-353/88-25
cc w/encis:
John S. Kemper, Sr., Senior Vice President-Nuclear
S. J. Kowalski, Vice President, Nuclear Engineering
W. T. Ullrich, Manager, Limerick Unit 2 Startup
J. M. Corcoran. Manager, Limerick Quality Division
Graham Leitch, Vice President, Limerick Generating Station
J. W. Gallagher, Vice President-Nuclear Services
Troy B. Conner, Jr. , Esquire
Eugene J. Bradley, Esquire, Assistant General Counsel
Dave Honan, PEco Licensing
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
M. Nguyen, Pennsylvania Public Utility Commission
bec w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
J. Linville, Section Chief, RPS 2A
J. Durr, Branch Chief, DRS
R. Clark, NRR
B. Clayton, EDO } N,Jo kww ,100
SRI, Limerick 1
7 . 7 6'r* m t h , D A P
W Wb
W. Co*E i
RI:0RP
RI
P
Jef g /rhl
Wenzinger
,
[ O/%88
10/I/88
0FFICIAL RECORD COPY
IR LIM 2 88-25 - 0002.0.0
11/01/88