Forwards Integrated Schedule Category A,B & C Project Listings & Changes to Integrated Schedule for Category A,B & C Projects Semiannual Update (Nov 1988) Re long-range Planning Program
ML20206B928
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/05/1988
From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
C-88-466, C000-88-0466, C311-88-2132, TAC-65824, NUDOCS 8811160055
Download: ML20206B928 (21)


Text

n-tc- * ,

OPU Nuclear Cor oration

- Nuclear esy=;=eusa 201 316 7000 TCLEX 136 a82 Wr:ter's D: rect 04al Number:

C000-88-0466 C311-88-2132 THI-l TAC 65824 November 5,1988 U.S. Nuclear Regulatory Comission Attention: Document Control Desk yashington. 0.C. 20555 Gentlemen:

Subject:

inree t'ile Island Nuclear Station, Unit ' (TMI-1)

Docket No. 50-289 Operating License DPR-50 Long Range Planning Program (LRPP)

"Integrated Schedule ABC" List Update

References:

1) GPU Nuclear (GPUN) letter No. C311-83-2030 dated March 16,1988 (Enclosure 3)
2) NRC letter dated May 27, 1988 - Issuance of Amendment No.

140 to License No. DPR-50 for TMI-1, and attachments.

Pursuant to License DPR.M Condition No. 2 C(9) GPUN has implemented the LRPP for Till-1 contained in E .losure 3 of Reference I and also included in Reference 2. Attachment 1. A*. a part of the LRPP, updating of the project listing in ear.h of the Categories A, is, and C is reauired semi-annually. To satisfy this reoutrement, the following attachments are submitted:

1. Attachment A - A new project listing of Category A, B, and C projects annotated by an asterisk (*) to identify new projects.

Completed projects have been removed fecem the schedule listing.

Reuining projects are ongoing or are scheuuled consistant with cycle / year comitments, any changes in schedule are reflected on Attachments A and B.

it. Attachment 3 - A summary listing of Category A and B projects which have been completed, deferred, change 1 in scope, or otae. wise have had schedule changes with explanations at appropriate. The listing also contains Category C project completions and will only address changes to the C1tegory C scope or schedule if such changes inpact on (steqories A or 8 schedules.

8311160055 DR ApoCK 881107 0 05000$s9 FDC f0 7428f/0171f I g GPU Nuc! ear Corpcer. cn is a subsc ay of Genera! Puts c Ut t t es Corport on

s . .  ;

i Two additions to the list of Category A projects heve been made by this submittal. Several changes to the list of Category 8 projects affecting [

AChedule or scope as well as project Ider"ification or descriptions have been j discussed in Attachment 8. Pursuant to e Long Range Planning Program for Tit!-l it will be assumed that you are in agreement with the above Category A/B  !

changes if you do not respond to this submittal within 30 days of receipt.

4 Sincerely, l

<')?

/

/' O'd /' (

R.L. Long

[

Vice President n Director of Plan.& Nuclear Safety CC: J. Stol. NRC W. Russe). . NRC R991on ! i, R. Hernan - NRC Project Manager "

R. Conte - NRC Resident Inspector i

i i

i l

t

f I

1 b

?

l I l

! I l

l  !

i 4

7428f/0171f I

e. * ',

ATTAOMNT A l TNI-1 htCLEAR GENERATING STATION INTEGRATED SOEDULE t CATEGORY ABC PROJECT LISTINGS  :

L 4

F k

l I

r L

a i

k r

i

(

t 4

i

.I d

b

T C3 1 -1 PQOJfCT t ! ST # 0C CAftcORY "A" PRO.,tCIS *

  • SOR T fly CAf f CORV/CYCE T

......................./BA MUMetR STATUS AS OF 2SOCT88 035 flA DISCRIPTION CYCLf/ CLASSIf ICAT IOM mumetR vtAR PRnJECT DISCRIPTIOes 1 412491P4

  • Rtc CttIDE t.97 MOOS 84 M8tn CR F t tdAt Ttt.34% WITH PL ANT COs*PUit R.

Rif MEMO $211-8F-3180.tAl 81-915) 2 4t?$31P2 PUMP RECIRC FLOWMt TERS F OR 85T 8R NRR A8 ansTALL ftOWMtTER 04 R f C t RC L I NE F OR wDt -ci 3A f s : 1%T Att PLCIRC LOOP AAD FLOWMETER FOR CAP-1A/8 L AI si-4r.M5 3 128100

  • STAT 104 BLACAOUT 89 sogn ANAL vsIS TO RTSPO'D TO NRC RtOUtRtMt415 04 SR3.RfF

'Ou R>O.63 t A s 8e-914s4 4 412467 ANTICIPAlf TRAM $$tMT W/O SCAAM(ATW5) Rut [ 9R NRR CR RT t M CR in Moo s e e Ca f s oms T O f ut t s t.t RtousREMtnis Or 10 Cf R *>O. 67. L A I 85-922F

  • = Added Project
  • EA Number Chang.ed

. - - . - - . - - _ _ - . ~- -- - - . . . . ~ - . . - - - - - - - - ---. - .. .-- -

~- .. , .

t i: -

!' s -l PQO

...................J.E ini.1 LISY C T. . . . . . . . . . . . .

8OG CAftCORY *s" PRoxCIS .

  • SORT ftV CAlt GORV t/.sA seUMetR

................./Cya STATUS AS or 200CT48 085 RA OtSCRIPT80e8 CYtif/ CLASSif SCAT 1088 -

feUMBER Yt Aft PRO

.............................. . ..K.CT DESCRIPf1088.... ....

............,.............. . ~ .. .. ......... .... -..................

S 123227 198 SERVICE RX SLOG f tleDOer SURVtlLLA80CE 7 Istit sesetti APP 90MeseAftLY 10 f tt00ess Rtt. esun[G 135.T T.S. 4.4.2.1 6 de12S$1M * .nsinusettei A;st UPCRADtS S 9 584 secniksi 64ACifv*oi" ensTRusstlet AIR SY$itMS. ($ PIP REC.)

Rtf, C311-88-2092 i

l 7 123230 SLRT SR IE=R 1 R$

ImitcmATED ttAK RATE itST Of Coeli AI8eME Ri . 1990.

8 123233 ** OTSC IUBE PLUCC49eG 8st seRR Re PLUG OT5C futts AS setCESSAfty, 9 1232S? ** set RE ACTOR REFutLiteG set semet as 76 setw f UEL ASSEseattE5.

10 12689G ** Of 5C f DOY CURatRT it5TIleG 8st senc Rn (CT of $$l TURES

  • INPAaIDED 31 ts5ricitose t R5Pici s ces 95 a(t IRED) 11 126e9H ** TM8 IseitRV e Ct stSPECI8Oss (OUT Act est3 est seRR
  • L Asset e . T x g a se5Pt CT 8045: AUCsetseitD IM TO CC'ePLY WI TH 10 CF R 50.35.
  • - Added Project
    • = F.A Nunher Changed

TM t . 1 PROJECT LIST IOC 1

CATECORY *8* PPOJLCT1 .

$0RT SY CATtCORY STATUS AS Ot 780CT88

................./. CYCL ... E/.8 A. soutet R 085 BA DCSCRIPTIPR CYO f/ CL ASS SI $ CAT IOst -

8euset R YLAR PROJECT DESCRIPTI088 12 8e12538 89[AT SIIIK PROTEOTIOst SYSTEM UFCRAD( Sft IIRR CR C8 i

t#STAtt DIFFERtelf CR s eID s CATOR F OR MSRO* OTHER 9e00 # DEB 578f8tO SV OPS, l MAlsti A3C Plasti ( SeG.L A 8 8 F-9283.

13 8e12$$1

  • 8WSTRUpstIIT A8R UFCRADCS aft tSM isePRoi~d*FiiiftAlibE dhD' s WSTRUest SIT .840Dif Y fA-5A M-OVtR.

(SP8P RLC)REF.C311-88-2092

{ ' te as12$36

  • TM -1 MAIas AcessutoCI#T33 RIFORMAf898G BR 80RR l CR RttM l MOvt 50 set TOW PRIOR e TY CR AL wtMS TO I Test COpePuf ta Rtf OeH44 7 RE M4 8 8EDER.

l (SPSP R[C; Alf. C311-88-?O92

( 15 128M6 VkeuDOR MAteUAL REVitW 8T/88 seRR (CTA5(i$N'5kh ihkithEhk VIIEDOR I DOCuest est COse f ROL PROGRAM:

l LA4 83-9238.

l

( 16 128098

  • SWOC sArePERF 88ePROV UFCet. (SPIP) 88-89 8 ERR Rt L st CR E vat UA T I 08:5 OF RICneWet12AT lOers F Ost PROCEDURI CMAdeGr.5-SedOC SPIP PROGRAM Rtt C311-88-2092 17 as12S12P 1
  • SAf tTV/PERFOR9eteC 18ePROVLPet95T PROG {8 WOC) 88-90 IIRP 84005 iO Ifort tperseT SPIP RECOeset800ATIOnes.

RLt. C311-88-?O92 18 1?809F St tSMtC QUAL NUCLEAR POWtR Pt Age 75 88-91 8 ERR St ISM 8C QUAL #F 4 CAT 1048 Uf f L 4 TV CROUP P AR I I CI PAT I Oes.

  • - Added Project
    • = RA NeaAcr Changed

.- - . , - _ - - . , . _ , . . .- -- ,,.- , -,- , ~ - _ - -_ - --__-.--_ - - - - - , _ _ - - . , - - , , - , - . . , - - , , - . - , _ , _ - - -_ _ _ . , .

a T F: 8- 1 PQOJ[CT L85YtQC CAT [CORY "8" PROJECTS SORT BY CAftCORV STATUS A5 Ot 280CT88

................./ CYCL ......

C/.BA teUMBf A 085 BA DESCRIPT8001 CYCLt/ CLA558fICATtuet NUMetR YtAct PROJECT DESCRIPilog 19 128108 50tSeeIC OUAL OF t90tP 8m ortR seUC PLANT 5 88 92 sera SCOPE esatIlDOWNS Aes tVALUATI0:.5 f OR 50pG M OCRate AS R10UsRto 8v seRC CL 87-02 4 LA8 ST*9084 l 20 412523 RtPLICATE 5I9eULATOR CERTIF8 CATI 088 UFCR0 48 92 seRR

~

UPCR56E*5Itm'dAI6E'C68'e5ISTE4i WIYM COesTROL ROOM EE00efICAT1045.

21 4180$F COMOLIDAT8088 PLAal 88/89 SeRR

~

I TASE5'Tb BE'dCC6e~ekt isteED TO l CONSOL IDA T E TMe-1 AeID 2 SECURITY:

( LA8 88-9019.

L l 22 418714

  • 3" LE AD PROCESS SM s t L D T OR 9 etch f S L f E RS 89 IIRR 1

PURCMA5E 3* t[*O PROCESS SMitLD AND FtLTER TRAWSFtm CASE L Al-8 F-924 3 l 73 12689A OUTAct CtsetRAL EperLovtE TRAlmsmC . TMs-1 89-91 terr l

Im%TRUCT Ise0tVIDUAL5 teORMIleG I96 teUCLE AR POWER PLAT 15.

24 123A09 984 REACTOR RETuttleeC 9R speR Re 80 setW FutL A55t99 Lits.

25 113C09 0fSC TU00 PLUCCiteC 9R sprR Re PLUG OTSC Tunts A5 SetCESSARY.

26 126A09 94 8 ERR OTSC R .IDOY CURRERT Ytafslec

ECT os 5 Tunts
31 8W5PtCT8Das iest tMPAmpt0 as5Pt CT eous af At00sato)
* - Added Project 1
    • = EA kaaher Changed

_ . _ _ . - - , . _ _ - - - _ . - _- . , - . . . , _ _ . . _ . _ _ . , _ _ _ . _ . . . - _ - - . _ _ _ _ . _ _ _ . _ _ . ~ . _ - - _ . , . . - -

A 7 C3 0 . 1 PQOJECi L I$T IOG CATEGORY "B" PROJECTS

......................./.8A SORT BY CAIIGORV/CYCLf WUMeta STATUS AS Of 280CT88 OBS BA DESCRIPTIO4 CYC1f/ CL ASS S F ICAT ION

=UMR[R YLAR PROJECT DESCRIPTIO81 27 126C09 TMt INSERVICE IMSPECT 904 (OUTACE 94) 9R terr AL L Asser stCT xl s mSPECT IOces: AUCM[mitD *'s TO CosePLY WITH 20 CTR 'ro.SS.

26 1?6890 mx VTS$tL 8NstRVICENSP 9R seRR Rn PtRFORM 10 YtM RN visstt inst RY e ct s =Ser v soe:S to COMPLY WITH 10CTRSO.S$ Ase0 T.S.4.1 i

l l

l t

*
  • Added Project i
    • = P.A Number Changed

e T 83 8 - 1 P CI O J E C 7 8 Y tQC CAf tGORY 'C" PROJECis .

50R3 BY CATECORY STATUS AS of 200Cf88

................./ CYCL E B A teUM....../...... M..............

R ... ................... .............. . ... .......... . ...............

Ons SA DESCRIPT804 CYG t/ CL ASSIF 8 CAT 8088 seUM9f R YLAR PS0JLCT OfSCRIPf8081 ......... ................

29 412014x UPGaAnt RevtR WAf tR Puser 3YS11M 7 sec e5PM D( MO F AG & t W5f ALL P 8PitIG & SUPPORTS; Itt III5.

30 412341

  • ADOeiecaAL seAI4T PLATFOnses 7 CWC is TO Itu5f AL1_ MAleff esAseCE Pt ATFORMS In 1M imIImeelDI AT t AeID f ume 8 8st SalLD 3 seC5 31 12t49J ** STEAse t205soss ee5PtCTaoss 3R meet At t AdCset mitD tsp 5PtCf tous TO DEYtCT (ROSION/DtGstADAf tou 0F TM8 SY51[MS.

32 178128 ofsc CHEMICAL CLEAmsec SYSTEM est MRC We CME N 8 CAL CL[AmIesG OF SOYM OT5C'S US8esG tPRI/5GOG PROCESS 33 128135

  • tw esoEILE SPRAY PLAT [ REPLAct est setC pe
  1. fPLACE 64 seAea FW suoIItt SPRAY PL AIES ( 32 PER OISC) 34 4t2AAQ PLAsef CntCm vatyt UPcRAot set 35M 8Diell'dr5ifA15/$iPt* fl MISAPPtflD CM Ca vatvt 5 SA%(0 One SAes omot Rt LVI WI (SCOPE 201 Off80stD) 35 412ARL
  • OT5C COLD ttG Dases & NYDmot Att Set not es PtfRCHASE AeID 141 tat t DAse5 WDelCH Wet t At 8 OW 077#, DOf *One M AD LMIRY '

COesCURRE N T WI IM p t f UL L l89G.

i

  • Added Prolect
    • = RA Ember Changed

T CI 4 . 1 PQOJ[CT L 45T 5QC

  • CAT [CORV *C* PROJECTS SORT SY CATtCORV 5iATUS AS OF 290CI s

................../ CYCL.....................................

t/94 soumet a . . .......................................................... .........

085 RA Of SCR IPT 8 Det CYCLT/ CLA55 IF 8 CAT e Det 900MR(R Yt Aft PROJECT DESCRIPfl04 36 412ACC

  • AuM/Setaf fM DRIDGE UFCRADC est REL r

as l AUM Set IDCE-t WST At t SIBCMitBG SYSitM i I NST Aa L Pm0GR Afempt t GE AmtD L s Me T ,

l SW01CM l

, 37 412ACU

  • GEIIt# A108t RELAY Pet 0TECT 50el Set omst l Te l

P90V 8 DC UNOf ef mf eut esCY PR0f ECT 804 F OR f eet su s el GF Jet AAIOst.

36 412ACV

  • UPCatADF CAeLE EOUIP P90ftCTIO4 est ISM pfVIEW UeIOfR587tO CIRCulTS A40 8DinisFV CORAtCisVE ACf80el.

39 412998

  • OTMtm OUTAGE mtLAT[0 ACTIVITer.5 em' ALL ALL OUTAct RftAffD ACTIVITIf5 SUCN A5 8 se5Pt CT IOops #f PAIRS, SURVE Itt AssCES Mim0R moOssICA: 0=5, sooo SuPron s , t f C.

40 412522 #(PLACE SAILtV TaA8:$ Ass TTtet5 set seRC RtPLdC$* 7 SdiLN*SY*YdkWS ItesTAt L estW PWII SUPPLY sm06UL E5, W s R Isuc CMAsects Ws lesla IC5/ esse e 41 412$40

  • RX 9t DC sushi PLATFOmm5 Ost CWC Ste Pt ATF Omm5 AT RCP.1C LOWER 980T0ft 9( Aft tesC5,RCP.18 COUPL t ouG Aftt AS, CA-V-11Hs er WDG-V2 Aftt*4 42 412546
  • Of 5C UPPER seassWAV ACCESS PLATFORM (MPip581 Oft CWC
  1. 4 f WPAesO INIST 8 esG PL ATF0 mms TO PROVf DC UPP'A 0I5G ACCESS, 8 as T At. L ACCT 55 Ps41iOpM 10 AM-W.8C.

43 418 FOS

  • 4seComC OC1[Cfop atPLActsetET - 88 est NRet as REPLACE 36 40 SCORE OtitC10RS.
  • - Moed Project
  • MA Number Changed

~

T C2 8 . 1 PQ0 JECT Li5i FOG CAffCORY "C" PROJCCTS

  • SORY 8Y CATECORV 8eUMr.f R STATUS AS OF 280CT88

................./.CYCt.[/.SA 085 RA DCSCR I P T 1081 CYCLF/ RAS 3 I F . CAT 8086 .

SeUMBtR YLAft PROJECT D(%CRIPfl00s i

l t

l l

I 44 41870T

  • RCPL#CC LETDOWII COOLERS Oft Set REL 1 Re j RtPt ACT 2 Lf TDOWII COOLERS W8 f ee i

UR855 14 West (se0U$t.

45 419453 EQUIP *e[uf f ast RCRA e WA5TE MielMilAf toes 88 E R8t fQU1P*EtAY EOR 99AAIDL ifeC OF MAZARDOUS 8%IERIALS 00 WA5tLS.

l i

i 46 418058 SECustITY ACCESS C0eITRn Nut"R EstetA8eCC 88-89 NRR At. t.

Rf Pt ACE CAftO Rl' AD(RS

  • UPCRADC 98414 l COMPU IL R ; set W PR I SIT L A .

l 4T 128114 8.PRI STEAos CtsetRATOst RtLimeI1.8iV PROJ 88-90 putC

! Co-r646ieri4R U4 'N TAS= 404.

48 419648 COes5TRUCT ADMiss se0RTH SUILDIIeG 88-90 FAC Coassist'dT A'dOU41Mi$6 STORY l Of f ICL SUILD s esG.

l l

l

! 49 1280T2 PLAa:T L trt A55uRAesct/[xitass088 88-91 8tIL l

SUPP64t'Oi'iiusiis nViPt s = SwoG f Om f f A58IIIL 8 T Y Of ( ATtseOlssG OrtR AT18eG LIFE.

$0 128099 iMI.1 Ias0tVIDUAL Pt AesT EVALUATIDes 88-91 ID4R IseDUSTRY D(GstADID Coat ACTIVIT8ts er Pi AM T Set CI F S C NRC SteeII T T AL ,

  • = Added Project
    • = RA Ember Changed I,___.--__._ _ _ . - . _ _ _ , _ _ _ __..-._, _. _ _ ._._ ~ ... -

PQ0 Y se 8

... ..............J..t

. 1 I 5 I 6QC C i.......L............. ,

CATECORY "C" Pft0JECTS SORT SY CAftCORY teUMRtm STATUS AS OF 200CT88

................./CYCtt/.BA ...... ....................... .................... .......... ..... ..... ...............................

085 SA DE5?st e P! 3000 CYC1E/ CLA558F eCATION eeusest R Vttr PROJZCT DESCRIFIIOct 31 412521 VOLUME R[ DUCT 4088 EOUSPMtif f F ACillTV 88-91 RAO UFCRADE ExistleeG SOLID W45f t FACILITY S2 412536 SeWOC ADVA8ect0 004 TROL SYSTEM TASet (OftCt 88-92 ISM Ofvtt0e A SYSitM Coser 4CumAT10es 10 ptPtACC TMt e C5ftses 0 SYSILM We ist THE ADVA8ectD Cose1MOL 5V5IEM S3 128122 Sew OwestR*5 Capur PRocmAM se/39 sena Crue'fiiiricisatiO4 iis'fMt swoc.

34 128132 A5 TGUse0 DOCUsetisi ar DRAwIesG UPDATt 94/99 terr MA 8 4 I A 9 4 AS-F OUse0 DOCuest se i A T 1088 l iPER 10CfRSO AFP 8),

1 1

$$ 4194TT EMtRG CosseumiCAT 808e5 SYSTEM UPCRADE C9/99 IIRR 9tPL Act 31 Of DICaitD ittEPMneet CIRCulTS i

WBTM MICR0wAvt inassa 155some SYSTEM.

56 419633

  • UFCmADt DOMtsisc WATER SYSTEM 86/89 FAC i Suety (Y~t mI5ii.dC'06edslic WATER SYSitM; j R(Pt ACE /UPCRAOL AS estCE55Afty.

i l

SF 419ss3 RtrtsCA 51oeULA10st Rtesoft SMuTDowse PAestLS se/89 85M

! Rf Pt ecs.tf Aeo e ast At 1. 1ses.1 ArseOtt l 58euIDowe PAestL5 AT 5sseULATOst; 9e00 ei 1

i SOETwAmt.

i

  • - Added Project
    • = F.A Esaber Changed

- - _ _ . . .,.- _ -__.- _ .-- _ - _ . _ -- - - _ .., _ _ _ __ . _ ..- ~ ,_. . . - - . . . . ~ . -- _ - - _ . - , . . _ - _ .

1(38 1 FQOJ[cT L857 8QC --

. ~<

CAT [CORY *C" PROJCCTS SORT BY CAT [CORV STATUS AS OF 290CTSS

....... ........../. CYCL E /SA 80Us44...

................... R ....... ................ .... .... ..... -..... ................................

085 8A DESCRIPTIDes CYQ t / CLASSIF iCAIIOst 19UseDE R YtAR PROJECT DESCRsP18Det 38 128101 OfCAV totAT RtMovAL AttiAsIt.4IY 39 IuRst AceAL N ii I6*EtiPEED I6*tuRC Atgoasetset315 kmtes DEVEtOriD.

$9 419665 CostSTRUCT TRAleissG Lat5 89 EAC PROVIDC F0ft TRAtatesC t ABS IW (Ma$182G STRUCTURt.$.

60 128*02

  • 11Cae setC 5sMPLtF4 CATI 04 99-91 8 $st Pt AmI*EPtCiiiC'itIMtbisiETmT1000 OF DwoG fICM SetC SIsert 8i eCAIt04 9 ROGRMI 61 412S43
  • PRA SAf t TV tese[tsi 88005 89 91 ISM

~

  • IMPtie'aisi tie 663 EiiU(iihG FR0st YM t .1 PR A 62 123262
  • AttimesLITY Citf[ RED sentasT[seneCE int 0G 99 92 fueC RCM fv4LUAft0st OF PLAmi SYSitMS TO Offtest MAfRT.ACifve!8t$ TatAT e sePROVE RELIAmiLsiv.(APPROK. 30 SYSitMS TOTAL).

63 e28A80

  • OtStGee SAsts PRocatase 87-92 8598 Ot5 spas SASIS REcoseSTITUf80es, PERF0ftM 5588 5 64 128ARV
  • Det AWIasG PROGR Ase 39/90 tsee It t(CamLE DRAwatec atomaW CAO CR PAastt OR AwlesG UPCit ADE CIRCUI T 5088t OtA t 0AI A BASL CISt., CAR 8R$/tDS IAC # 885!!RIACE
  • = Added Project
  • * = P.A Nember Changed

l i i .

.: i r I  :

{!

a:  :

tig: 8 l

l 1 3:

6  :

I

! 5<  !!

$ $ I $ I l Y  !

.d .

l ,

i

l '

~

! lR R R R E e E E

t g*:3:

l *:  : G '

~

1

i  !

si g  : 1

o  :

i i 1

."  !  ! g - J e

" S .: j 84 5 g f ,,

1

  • g  !

ai,g- -s ats l

"I i igl g3 s a w tog 2 SC .<8 3 v <s o' -a

s:e gi

.~

0 i t:5 -e << 81

!"l 5  !

t

:5 *- g- 5:st s S~ e .Ig

~

p. .g I W:
s aiasg :j e a t: .4  :

es a .

I v.W  : . ns -

a i t gll 1 . "g 8:w . .d.. .3 g:,- e aI E ~;

d W::

J

g8 W $tr E 8- i s *

{ **3 gg

... .I S g t i G g x::5

  • V .e 5 g3s **5 y i i

ggg Ep'r - gp- 8 "a $l "1.3 g 2: - 2  :

ee- .g - r* e. .s .8:e g e:: s

.- Ly" 3 3_4 var s os rji tc 7,

-: .. f i se le5 s!g*ig i=5g 8, ye ei ili<1 Ss .r <=[s r _. 1  :

[:: :r r a llg g- .rrt I 3l - e e tr: e .r:3 s 4.1 81 ,c a  !

4. . [

R:  !

22 i

  • : . . I
.. f k

s:  :

[

  • t
  • 2

$:i 5*  ; E R 8 8 i

f* I3 E
  • R S 2

X 5: :R :3 3 7 5 3 3 i gi g j  : :s s e e  ; e  !

  • : l i

I I

, r

e , f 3:  : '

!  ! l B:.  :

g: 5  :

5: 5  :

3 g

'E i 5

- W 5

- I $

i d  : 1

: l t

' e l  !  !

E j  : i

. E E E

. s . s s g S a:  : c5 : i I

i
    • i
G  :  :

": w  :  ;

t

' T L l.

u wt - l. Cls I

,  :  : 0

"!:5 5 -

5  :  : g 5

2

$n IE e  :-

  • 5 __y t

g

!SI

g: 5 sg 5 Ej 28 {

l

%g t- t y* 2 sr 8  ! !er  :

"l g

gS . 3 wg E S Wo  !

g

{ El g g"8

  • 1.!!e g as

. s-s

=

5-e l

' a:t  :

.g - -

to sz s: . v , >

5s:! j 3j=a  !'  ; IS -

D sy:o! ,!y - sl 8

t.

g2.. 3. E8' 3 5s 88 t

      • d* iU* -i g"

h i i

~

l

f!
  • BU g C r ; -

2 -

8L e w 3j.r

! .. W 3 - -

g I a! *1 y2 Vg tt1 i

!  :  : 55 "I 5 *e 35- ~I 2 58 *  !

l i j e tre - r  !!r.s n er r-  != I" t es 5*  !

1:  :

- - - - aa. i

6.  !
    • 7 c: >

2:  :

g: .: -

g g - =

~

n -

2 W s .

<  ! ,2 2, 2 2 ,2 i 5 . , , - -

1: '

  • l j  !

C 2 2 R j 3:  : ,

k

9 e C. .. .

8.:. .

B!.  !

! 5 .

9 5:

e.

5 N E

1

. d  :  :

~
s  ?

~

  • t !

u.

oi lW!:

oj *

-. l l

. u . .

2
: l
: u ui 'o E

i w  :

'!a: g Pd car a.. - . . --  :

. E 3 to

. . .s

5l. *t-

-  :  :: 8gt ,

.:  ! E t!

E $! $gw I

a!:  : x e

'5:

s at EL s

6

=

. M. - - 5

E! 8 *:Tj UO E:

't

. T, w Ey>=u-

. 51 e 1, .

,f. .

<! l 22 l b! .

2:  : .

5! 2 c"

I ing::

Si

-. . . e 5:

o 8  :

l ATIAONFRT B OtB'GFS TO TMI-1 NUC1. EAR GBTRATING STATION INTEGRATED SO{EDUI.E SDt! ANNUAL UPDATE (NOVINBIR 30,1938)

CN MGORY A PROJECTS Additions: As denoted by a nexttotheprojecttitleinAttachmentA.

Completions: B/A TIT 1.E 128061P2 RG 1.97 Seismic this in Control Roce 412244P5 Remote Shutdown System Enhancement 412384P4 Appendix R Open Items 412484 Flow Fleasuring Instrumentation 412491P3 Reg. Calde 1.97 bhis 412531P1 Pump Recirc Flow Fleters for IST Deletions: None  !

Schedule Changes: None Other Changes: None L

[

l 1

[

L r

i i

l

{

3064U i

=, -

'nfI-1 Integrated Schedule A'ITAOBENT B (continued)

CATEGORY B PROJECTS Additions: As denoted by

  • next to the project title in Attachment A.

Completions: B/A TITLE 123224 OTSG Tube Plugging 123226 7R Reactor Refueling 123235 RC Pump Snubber Valve Block Replacement 125007 Dil Inservice Inspection 125008 Eddy Current Inspection 126881 Outage Gen ral Employee Training Deletions: None Schedule / Scope: BA 12689E Rx Vessel Inservice Inspection Supp. 6 Prep. 8R Changes his project has been moved fron year 1989 to Cycle 9R.

The reactor vessel internal inspection has been scheduled for refueling outage 9R consistent with 10 CFR 50.55 and Tech Spec 4.2 requirements to complete the inspection by 1992.

Preparation for the RV inspection was originally scheduled for 1989 as contingency for Cycle 8R in the event that unanticipated extension in the lengths of Cycle 6 or 7 would extend the ste:t of the 9R outage past the required inspection window, thus requiring the inspection in 8R immediately following Cycle 7. After the completion of Cycle 6 within the expected duration, it was determined that Cycle 9R will be within the inspection window.

Derefore, the scope and schedule of this project has been changed to include preparation, planning, and implemen-tation to support the 9R outage.

BA 472523 Replicate Simulator Certification Upgrade -

W is project is an ongoing project and the listing has been revised to reflect budget allocation through the year 1992, 128097 Seismic Qualification Nuclear Power Plants 238108 Seismic Qualification of Eoulpment in Operating Nuclear Plants - These two projects represent participation in the utility group and walkdowns related to SQUG. The years for this project has been extended consistent with development of the SQUG program and dialog between NRC and the utilities.

3964U i

, abn

'*; gj

~

'b o l

TMI-1 Integrate] Schedule A1TAONENT B (continued)

CATEGORY B PROJECTS 9:

12689A TMI-1 General Employee Training - The years for this project has been extended consistent with budget allocation ,

through the year 1992. This task covers outages 8R and 9R.

Other Changes: 1. Budget Activity (BA) Number Changes The following BA numbers have been changed. There is no change in scope or schedule associated with these ,

changes. bas which have had their numbers changed are indicated by a ** on Attachment A.

OBS # Previous BA Number New BA Number 9r 123A08 8R Reactor Refueling 123257 8 123C08 OTSG Tube Plugging .

123253 10 126A08 OTSG Eddy Current Testing 12689G 11 126C08 TMI Inservice Inspection 12689H ,

14 128125 Main Annunciator Reformat 412556 3964U

F o ,

1 3

D11-1 Integrated Schedule ATTAOBENT B (continued)

CATEGORY C PROJECTS Additions: As denoted by a next to the project title in Attachment A.

Completions: B/A TITLE 123222 Turbine / Generator Inspection 6 Overhaul 123223 RCP Seal Inspect / Replacement 123231P1 OTSG and RCS Insulation Replacement 125006 Steam Erosion (Augmented) 128081P2 OTSG Mechanical Cleaning - Sludge Sample 128124P1 Rcdesign/ Replace Containment Isolation Valves 412081P3 OTSG Blowdown 412232 Fuel Handling System Upgrade 412?55 Strip Chart Recorder Upgrade 412444 Main Generator Protection Improvements 412495 Rx Ex-Vessel Fluence Measurement 412534P2 ICS/NNI - Enhance Reliability 418678 Natural Draft Cooling Tower Pipe Refurbishment 128019 DtI-1 Decomminissioning Cost Estimate Upgrade 419448 Purchase In Place Whole Body Counters 419454 Automatic Precipitation Samplers 419456 Automatic Water Compositors 128113 Low Activity Waste Stream Petition Cancelled: 412AAG Below Regulatory Concern Powdex Disposal 419XX9 Construct Visitors Center 41989H Remote Siren Monitoring Sv; tem Budget Activity Number Changes: OBS # Previous BA Number New BA #

80 412ABE SQUG Mods 412552 31 126B08 Steam Erosion 12689J Inspection 3964U

1.

l, W ' ' .

"NI-1 Integrated Schedule ATTAONENT B (continued)

CATEGORY C PROJECTS Additions: As denoted by a next to the project title in Attachment A.

Completions: B/A TITLE 123222 Turbine / Generator Inspection 6 Overhaul 123223 RCP Seal Inspect / Replacement 123231P1 OTSG an<i RCS Insulation Re 125006 Steam Erosion (Augmented) placement 128081P2 OTSG Mechanical Cleaning - Sludge Sample 128124P1 Redesign / Replace Containment Isolation Valves 412081P3 OTSG Blowdown 412232 Fuel Handling System Upgrade 412255 Strip Chart Recorder Upgrade 412144 Main Generator Protection Improvements 412495 Rx Ex-Vessel Fluence Measurement 412534P2 ICS/NNI - Enhance Reliability 418678 Natural Draft Cooling Tower Pipe Refurbishment 128019 TMI-1 Decomminissioning Cost Estimate Upgrade 419448 Purchase In Place Whole Body Counters 419454 Automatic Precipitation Samplers 419456 Automatic Water Compositors 128113 Low Activity Waste Stream Petition Cancelled: 412AAG Below Regulatory Concern Powdex Disposal 419XX9 Construct Visitors Center

' 41989H Remote Siren Monitoring System Budget Activity Ntaber Changes: OBS # Prev?.aus BA Number New BA #

80 412ABE SQUG Mods 412552 31 126B08 Steam Erosion 12689J Inspection i

l l

l 3964U L