Monthly Operating Rept for Oct 1988 for Cooper Nuclear Station
ML20206B262
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/31/1988
From: Horn G, Scheuerman J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CNSS88307, NUDOCS 8811150393
Download: ML20206B262 (5)


Text

r OPERATING DATA REPORT DOCKET NO.

050-0298 DATE November 7. 1988 COMPLETED BY J. T. Scheuerman TELEPHONE (402) 825-3811 JPERATING STATUS 1.

Unit Names COODer Nuclear Station Notes 2.

Reporting Periou:

October 1988

{

3.

Licensed Thermal Power (MWt):

2381 4

Namepiste Rating (Cross We):

836 5.

Design Electrical Rating (Net We):

778 6.

Maximus Dependable Capacity (Cross We):

787 7.

Maximum Dependable Capacity (Net We):

764 8.

If Changes Occur in Capacity retings (Items Number 3 2hrough 7) Since Last Report, Give Reasons 9.

Power Level To Which Restricted, If Any (Net We):

10. Reasons For Restriction, If Any:

This Month Yr.-to Date Cumulative 11.

Hours In Reporting Period 74 5. 0 7.320.0

,_,_jl5.689.0 12.

Number of Ho'ere Reactor Was Critical 745.0 4.503.9 94.511.3

13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14 Hours Generator on Line 745.0 4,426.2 92.970.6
15. Unit Reserve Shutdown Hours 0.0 0.0 M

16.

Cross Theramt Energy Generated (MWH)

1. 74 9. 4R0. 0 9.658.248.0 184.288.955.5
17. Cross Electrical Ene gy Cenerated (WH)

RR4.726.0 3.179.351.J 59.238.432.0

18. Net Electrical Energy Generated (WH) 56 7. A11.0 3.083.5R0.0 57.112.204.0 19.

Unit Service Factor 100.0 60.5 74.0

20. Unit Availabilltf Factor 100.0 60.5 74.Q.

21.

Un',t Iapacity Fictor (Using MDC Net.)

99.8 55.1

~ V,1, 22.

Unit Capacity Factor (Using DER Net) 98.0.

54.1

....: 1

23. Unit Forced Outage Rate 0.0 7.6_

d 24.

Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

1989 Refueling and Maintenance Outa9e starting April 7.1989, with an

_ approximate duration of eight weeks.

25, if Shut Down At End of Report Period, Estimated Date of Startu i r

26. Units in Test Status (Prior to Cmnercial Operation):

Forecast Achieved INITIAL CRITICALITT INITIAL ELECTRICITY COMMERCIAL OPERATION f

\\,@ \\

G911150393 601031 POR ADOCh 05000298 R

FDC

AVERi ~ Lv,Y UNIT POWER LEVEL DOCKET NO.

050-0298 UNIT CNS DATE 11-7-88 COMPLETED BY J. T. Scheuerman TELEPHONE (402) 825-3811 MONTH _Qqtober 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.

(MWe-Net)

(MWe-Net) 1 769 17 771 2

766 1.8 771 3

770 19 777 4

770 20 777 5

769 21 774 6

771 22 772 7

771 23 759 8

761 24 7riq 9

554 25 779 10 756 26 772 11 7 7 *,,,,. _

27 771 12 772 28 772 13 772....

29 77n 14 767 30 7sa 15 769 31 773 16 768 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

~

UNIT SHUTDOWNS AND POWER REDUCTION

  • DOCKET NO.

050-0298 UNIT NAME Cooper Nuclear Station DATE 11-7-88 r0MPLETED BY J. T. Scheuerman REPORT MONTH October '988 1ELEPHONE (402) 825-3811

)

Method of Licensee cause & Corrective 4

g Shutting Event System Coraponent Action to Duration 3

NO.

Data Type (linurs)

Reason' D e Reactor Report

  • Code Code Prevent Recurrence 88-07 881009 S

l 0

8 5

N/A N/A N/A Load reduction to accomodate surveil-I lance testing on the Main Turbine,

)

and Main Steam Isolation Valves, ara to allow replacement of worn Reactor Recirculation Motor Geae-rator Set "B" generator and exciter

'orushes.

r i

1 F: Forced 2 Reason:

3 Method:

4 Exhibit C - Instructions for S: S N duled A - Err 31pment Failure (Explain) 1 - hanual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Re fuell. g 3 - Automatic Scras Report (LER) File GTREG-0161)

D - Regulatory Restriction 4 - Continued E-

'ator Training & License Examination 5 - Reduced Load 5 Exhibit 1 - Same Source F-nistrative 6 - Other G - Operational Error (Explair.)

11 - Other (Explain) l l

OPERATIONS NARRATIVE Cooper Nuclear Station Octcber 1988 l

l One power reduction of greater than 20% was made during the month of October.

On October 9, a oower reduction of 27% tias made to accommodate scheduled meintenance on a Reactor Recirculation Motor Generator Set and surveillance testing on the Main Turbine and Pain Steam Isolation Valves.

No scheduled or unscheduled shutdowns, or other significant power reductions were experienced during the month of October.

A capacity factor of 99.8% was achieved for the month.

L-

is COOPER NUCLEAR STATION Nebraska Public Power Distr:ct

    • *
  • i'ia"O"N!'Es"l,"".T^ "_'"

_,n_ - -. _ _ -._ _ _ _ - _.

CNSS888307 November 7, 1988 Document Control Desk U.S. Nuclear Regulatory Comissian Washington, D.C.

20555

Subject:

Monthly Operation Status Report for October 1988 Docket No. 50-298 Gentlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for October IV98 The report includes Operating Status, Average Dai!y Unit Power Level, l';it Shutdown Data, and a Narrar.ive -

Sumary of Operating Experience.

Should you have any cementr or require additional information regarding this report, please contact me.

Sin Ye1,

0~-

G.$D Horn Division Manager of Nuclear Operations 1

GRH/JTS:nd Enclosure cc:

G. D. Watson w/ enc.

i R. D. Martin w/ enc.

i f

I i