Forwards Request for Addl Info Re Util 861110 Submittal of Description of Inservice Insp Program for Second 10-yr Interval of Commercial Operation Which Began on 860710. Response Requested within 60 Days of Ltr Receipt
ML20206B139
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/03/1987
From: Sylvester E
Office of Nuclear Reactor Regulation
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8704080348
Download: ML20206B139 (3)


Text

__ - -

Jh

.< , 3 April'3, 1987

^

Dockets-Nos. 50-325/324-

- Mr. E. E. Utley ,

' Senior Executive Vice President - .

Power Supply & Engineering & Construction Carolina Power & Light Company P.O.. Box 1551 ~

Raleigh, North Carolina 27602

Dear Mr. Utley:

SUBJECT:

INSERVICE INSPECTION PROGRAM - FIRST 10-YEAR INTERVAL RE: Brunswick Steam' 51ectric Plant, Units 1 and 2 By letter dated November.10 1986, you provided a description'of the inservice inspection program.for the Brunswick facility for the second 10-year interval of commercial operation which began July 10, 1986. Included in that submittal were requests for relief from certain ASME Code requirements for the first 10-year interval inspection program. In our review of these first interval relief requests we find that we need the information requested in the enclosure to complete our review. Please respond to this request within 60-days of receipt of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely,

)b, Ernest D. Sylvester, P'roject Manager BWR Project Directorate #2 Division of BWR Licensing

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION Epocketfilet OGC-Bethesda EJordan BGrimes NRC PDR JPartlow NThompson SNorris Local POR ESylvester DHuller ACRS (10)

RBernero PD#2 Plant File OFFICIAL RECORD COPY p DB :PD#2 DBL:PD#2 N DBL.'PD#2 Si r ESylvester:cb DMuller 4/ l /87 + / 7487 4/3 /87 8704080348 870403 PDR ADOCK 05000324 g PDR

=-, -

ry c . - - .

Mr. E. E. Utley Brunswick Steam Electric Plant Carolina Power & Light Company Units I and 2 cc:

Mr. P. W. Howe Mr. C. R.~ Dietz Vice President Plant General Manager Brunswick Nuclear Project Brunswick Nuclear Prcject Box 10429 Box 10429 Scuthpcrt, North Carolina 28461 Southport, North Carolina 28461 Thomas A. Baxter, Esquire Mr. H. A. Cole Shaw, Pittman, Potts & Trowbridge Special Deputy Attorney General 2300 N Street, N. W. State of North Carolina Washington, D. C. 20037 Post Office Box 629 Raleigh, North Carolina 27602 Mr. D. E. Fellar Associate General Counsel Mr. Robert P. Gruber Carolina Power & Light Company Executive Director Post Office Box 1551 Public Staff - NCUC Raleigh, North Carolina 27602 Post Office Box 29620 Raleigh, North Carolina 27626-Ob20 Mr. Christopher Chappell, Chairman Board of Comissioners Post Office Box 249 Bolivia, North Carolina 28422 Mrs. Chrys Baggett State Clearinghouse tiudget and Management 116 West Jones Street Raleigh, North Carolina 27603 Resident Inspector U. S. Nuclear Regulatory Comission Star Route 1 Post Office Box 208 Southport, North Carolina 28461 Hegional Administrator, Region II U. S. Nuclear Regulatory Comission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Mr. Dayne H. Brown, Chief Radiation Protection Branch Division of Facility Services -

N. C. Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008

p, -

a . , . . .

t REQUEST FOR ADDITIONAL INFORMATION RELATING TO FIRST INTERVAL INSPECTION RELIEF REQUESTS CAROLINA POWER AND LIGHT COMPANY BRUNSilICK STEAM ELECTF.IC PLANT UNITS 1 AND 2 00CKETS NOS. 50-325 AND 50-324

1. Scope / Status of Review As required by 10 CFR 50.55a(g)(5), if the licensee determines that certain code examination requirements are impractical and relief is requested, the licensee shall submit information to the Nuclear i Regulatory Commission (NRC) to support that determination.

The staff has reviewed the available information in Attachment 2'to the Licensee's November 10, 1986 submittal which contains requests for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI requirements which the Licensee has determined to be impractical for the first 10-year inspection interval which ended July 10, 1986. Seven relief requests were identified in Attachment 2 to the November 10, 1986 submittal: VR-2, PR-1, PR-3, PR-4, PR-7, PR-8, and PR-9. The first 10-year Interval ISI Program Plan was based upon the 1977 Edition of Section XI of the ASME Code with Addenda through Sumner 1978.

2. Additional Information Required Based on the review of the relief requests listed above, the staff has concluded that, for Relief Request No. PR-3, the Licensee should justify why it is impractical to replace the rupture disk with a non-failing plate in order to perform the pressure test at the required pressure.

The schedule for the timely completion of this review requires that the licensee provide by the requested date, the above information so that the review of the relief requests for the first 10-year inspection interval can be completed.