ML20206A694

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/88-63 & 50-499/88-63 on 880901-30.No Violations or Deviations Noted
ML20206A694
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/07/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20206A697 List:
References
NUDOCS 8811150216
Download: ML20206A694 (4)


See also: IR 05000498/1988063

Text

- _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

__-_

_ _ _ _ _ _ _

__-

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ ___ __________ _

-

..

s

. *

2

TW

,

In Reply Refer To:

i.

Dockets: 50-498/88-63

50-499/88-63

t

!

Houston Lighting & Power Company

ATTN:

J. H. Goldberg, Group Vice

.

f

President, Nuclear

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs

J. E. Bess, D. L. Garrison,

J. I. Tapia, and D. M. Hunnicutt of this office during the period

September 1-30, 1988, of activities authorized by NRC Operating License NPF-76

and Construction Pemit CPPR-129, for the South Texas Project, Units 1 and 2,

,

and to the discussion of our findings with Mr. W. M. Kinsey and other members

'

of your staff at the conclusion of the inspection.

Areas examined during the inspection included piant status, licensee action on

l

previous inspection findings, monthly surveillance observation, monthly

'

maintenance observation, operational safety verification, engineered safety

feature system walkdown, electrical / mechanical components, system and

structures - Unit 2, structural integrity test (SIT) and integrated leakage

i

rate test (ILRT) - Unit 2, preoperational test procedures - Unit. 2, fuel

,

receipt and storage - Unit 2, licensee action on previous reported items,

!

,

cnntainment combustible gas control system (hydrogen recombiners) Units 1

.

and 2, hurricane / storm protection and special comunications demonstration / test

'

,

dt STPEGS. Within these areas, the inspection consisted of selective

3

examination of procedures and representative records, interviews with personnel,

4

and observations by the NRC inspectors. The inspection findings are documented

in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

l

identified.

l

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

!

Cri;:t! SWI 0F

?

!

lm c. N.ACH

!

!

L. J. Callan, Director

(

Division of Reactor Projects

l

Enclosure:

(seenextpage)

RIV: SRI:P f

RI:PS dh

SR.:PS

PSDA

C:PSD

0:

d

'

JEBess

DLGarrTsyh

JITapia

D munnicutt

EHoller

LJ;allan

l

/0/41/88 v

/*/j,1/88

y /31/88

10/M/88

f,/p/88

W/'/ /88

t

40

<

.

.

--

,

.

'

a

<

Houston Lighting & Power Company

-2-

Enclosure:

Appendix - NRC Inspection Report

50-498/88-63

50-499/88-63

cc w/ enclosure:

Houston Lighting & Powcr Company

ATTN:

M. A. McBurnett, Manager

Operations Support Licensing

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATIN:

Gerald E. Vaughn, Vice President

Nuclear Operations

P.O. Box 1700

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN:

S. L. Rosen, General Manager

Operations Support

P.O. Box 289

Wadsworth, Texas 77433

J

Houston Lighting & Power Company

ATTN:

J. T. Westermeier, General Manager

South Texas Project

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN:

R. W. Chewning, Chairman

Nuclear Safety Review Board

P.O. Box 289

Wadsworth, Texas 77483

Central Power & Light Company

ATIN:

R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Christi, Texas 78403

City Fublic Service Board

ATIN:

R. J. Costello/M. T. Hardt

'

P.O. Box 177i

San Antonio, Texas 78296

l

City of Austin Electric Utility

ATTN.

R. J. Miner, Chief Operating

Officer

721 Barton Springs Road

l

Austin, Texas 78704

!

l

'

-- .-. _

>

-- _. -

- - - - - _ _ _ ,

-

.

'

.

Houston I,ighting & Power Company

-2-

Encle.sure:

Appendix - NRC Inspection Report

50-498/88-63

50-499/88-63

-cc w/ enclosure:

Houston Lighting & Power Company

ATTN:

M, A. McBurnett, Manager

Operations Support Licensing

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN:

Gerald E. Vaughn, Vice President

Nuclear Operations

P.O. Box 1700

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN:

S. L. Rosen, General Manager

Operations Support

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN:

J. T. Westermeier, General Manager

South Texas Project

P.O. Box 289

Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN:

R. W Chewning, Cha#rman

h.elear Safety Review Board

P.O. Box 289

Wadsworth, Texas 77483

Central Power & Light Company

ATIN:

R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Christi, Texas 78403

Cicy Public Service Board

AYTN:

'1. J. Costo11o/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

City of Austin Electric Utility

ATIN:

R. J. Miner, Chief Operating

Officer

721 Barton Springs Road

Austin, Texas 78704

'

.

'

.

houston Lighting & Power Company

3-

-

,

bec to DMB IE01

bec distrib. By RIV:

  • DRP
  • RRI-OPS (2)

R. D. Martin, RA

  • RPSB-DRSS
  • Section Chief (DRP/D)
  • RIV File
  • MIS System

RSTS Operator

  • D. Hunnicutt

Lisa Shea, RM/ALF

  • R. Hall

R. Bachmann, OGC

  • G. Dick, NRR Project Manager

D. Powers

  • RRI-CONST (2)
  • DRS
  • w/766

.

i

>

,

4

t

,---r

--

--

a

,

s_

w