ML20206A694
| ML20206A694 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 11/07/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20206A697 | List: |
| References | |
| NUDOCS 8811150216 | |
| Download: ML20206A694 (4) | |
See also: IR 05000498/1988063
Text
- _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _
__-_
_ _ _ _ _ _ _
__-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ ___ __________ _
-
..
s
. *
2
TW
,
In Reply Refer To:
i.
Dockets: 50-498/88-63
50-499/88-63
t
!
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
.
f
President, Nuclear
P.O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs
J. E. Bess, D. L. Garrison,
J. I. Tapia, and D. M. Hunnicutt of this office during the period
September 1-30, 1988, of activities authorized by NRC Operating License NPF-76
and Construction Pemit CPPR-129, for the South Texas Project, Units 1 and 2,
,
and to the discussion of our findings with Mr. W. M. Kinsey and other members
'
of your staff at the conclusion of the inspection.
Areas examined during the inspection included piant status, licensee action on
l
previous inspection findings, monthly surveillance observation, monthly
'
maintenance observation, operational safety verification, engineered safety
feature system walkdown, electrical / mechanical components, system and
structures - Unit 2, structural integrity test (SIT) and integrated leakage
i
rate test (ILRT) - Unit 2, preoperational test procedures - Unit. 2, fuel
,
receipt and storage - Unit 2, licensee action on previous reported items,
!
,
cnntainment combustible gas control system (hydrogen recombiners) Units 1
.
and 2, hurricane / storm protection and special comunications demonstration / test
'
,
dt STPEGS. Within these areas, the inspection consisted of selective
3
examination of procedures and representative records, interviews with personnel,
4
and observations by the NRC inspectors. The inspection findings are documented
in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
l
identified.
l
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
!
Cri;:t! SWI 0F
?
!
lm c. N.ACH
!
!
L. J. Callan, Director
(
Division of Reactor Projects
l
Enclosure:
(seenextpage)
RIV: SRI:P f
RI:PS dh
SR.:PS
PSDA
C:PSD
0:
d
'
JEBess
DLGarrTsyh
JITapia
D munnicutt
EHoller
LJ;allan
l
/0/41/88 v
/*/j,1/88
y /31/88
10/M/88
f,/p/88
W/'/ /88
t
40
<
.
.
--
,
.
'
a
<
Houston Lighting & Power Company
-2-
Enclosure:
Appendix - NRC Inspection Report
50-498/88-63
50-499/88-63
cc w/ enclosure:
Houston Lighting & Powcr Company
ATTN:
M. A. McBurnett, Manager
Operations Support Licensing
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATIN:
Gerald E. Vaughn, Vice President
Nuclear Operations
P.O. Box 1700
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
S. L. Rosen, General Manager
Operations Support
P.O. Box 289
Wadsworth, Texas 77433
J
Houston Lighting & Power Company
ATTN:
J. T. Westermeier, General Manager
South Texas Project
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
R. W. Chewning, Chairman
Nuclear Safety Review Board
P.O. Box 289
Wadsworth, Texas 77483
Central Power & Light Company
ATIN:
R. L. Range /R. P. Verret
P.O. Box 2121
Corpus Christi, Texas 78403
City Fublic Service Board
ATIN:
R. J. Costello/M. T. Hardt
'
P.O. Box 177i
San Antonio, Texas 78296
l
City of Austin Electric Utility
ATTN.
R. J. Miner, Chief Operating
Officer
721 Barton Springs Road
l
!
l
'
-- .-. _
>
-- _. -
- - - - - _ _ _ ,
-
.
'
.
Houston I,ighting & Power Company
-2-
Encle.sure:
Appendix - NRC Inspection Report
50-498/88-63
50-499/88-63
-cc w/ enclosure:
Houston Lighting & Power Company
ATTN:
M, A. McBurnett, Manager
Operations Support Licensing
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
Gerald E. Vaughn, Vice President
Nuclear Operations
P.O. Box 1700
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
S. L. Rosen, General Manager
Operations Support
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
J. T. Westermeier, General Manager
South Texas Project
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
R. W Chewning, Cha#rman
h.elear Safety Review Board
P.O. Box 289
Wadsworth, Texas 77483
Central Power & Light Company
ATIN:
R. L. Range /R. P. Verret
P.O. Box 2121
Corpus Christi, Texas 78403
Cicy Public Service Board
AYTN:
'1. J. Costo11o/M. T. Hardt
P.O. Box 1771
San Antonio, Texas 78296
City of Austin Electric Utility
ATIN:
R. J. Miner, Chief Operating
Officer
721 Barton Springs Road
'
.
'
.
houston Lighting & Power Company
3-
-
,
bec to DMB IE01
bec distrib. By RIV:
- DRP
- RRI-OPS (2)
R. D. Martin, RA
- RPSB-DRSS
- Section Chief (DRP/D)
- RIV File
- MIS System
RSTS Operator
- D. Hunnicutt
Lisa Shea, RM/ALF
- R. Hall
R. Bachmann, OGC
- G. Dick, NRR Project Manager
D. Powers
- RRI-CONST (2)
- DRS
- w/766
.
i
>
,
4
t
,---r
--
--
a
,
s_
w