Forwards Safety Insp Rept 50-346/86-12 on 860304-0430 & Notice of Violation
ML20206A557
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/06/1986
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Williams J
TOLEDO EDISON CO.
Shared Package
ML20206A561 List:
References
NUDOCS 8606180248
Download: ML20206A557 (2)


See also: IR 05000346/1986012

Text

O/h 6

'

-

.

JUN 6 1986

Docket N3. 50-346

Toledo Edison Company

ATTN: Mr. Joe Williams, Jr.

Vice President

Nu: lear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. P. Byron,

D. Kosloff, P. Wohld, D. Butler and W. Gunther of this office on March 4

through April 30, 1986, of activities at Davis-Besse Nuclear Power Station

authorized by NRC Operating License No. NPF-3 and to the discussions of our

findings with Mr. L. Storz at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspaction, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response

is required. In addition, the NRC concerns identified as " unresolved items"

are being reviewed for potential enforcement actions. You will be notified

in subsequent inspection reports as to the resolution of these findings.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this lette , the enclosures, and your response to this letter will be placed

in the NRC P9blic Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL-96-511.

k[

G

b

.

l

l 1

Ibd/

.

.

'

..

. Toledo Edison Company 2

JUN 6 1986

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

ORIct:A:. OIONrn I:V 77 c. nm """n'$

W. G. Guldemond

Reactor Projects Branch 2

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-346/86012(DRP)

cc w/ enclosures:

L. Stort, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

James W. Harris, State of Ohio

Robert H. Quillin, Ohio ,

' Department of Health

1

i

b

h

RIII RII

kw/3 Gd1'emond

/4/' /s%

_