Summary of 880926 Meeting W/Util & State of MD Re Status of Ongoing & Future Licensing Activities at Plant.List of Attendees & Supporting Matl Encl
ML20206A332
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/03/1988
From: Mcneil S
Office of Nuclear Reactor Regulation
To: Capra R
Office of Nuclear Reactor Regulation
References
NUDOCS 8811150067
Download: ML20206A332 (5)


Text

_

o November 3, 1988 Docket Nos. 50-317 DISTRIBUTION and 50-318 6

NRC PDR'~~

i Local PDR l

PDI-1 Rdg i

MEMORANDUM FOR: Robert A. Capra, Director RCapra Pro.iect Directorate I-I SMcNeil l

Division of Reactor Projects, I/II OGC EJordan f

FROM:

Scott Alexander McNeil. Project Manager RGrimes l

Project Directorate I-1 ACRS (10) l Division of Reactor, Projects I/II

3(Johnson,RI

SUBJECT:

SUMMARY

OF LICENSING ACTIVITIES FEETING WITH THE RALTIMORE GAS AND ELECTRIC COMPAhy i

I L

On September 26, 1988, members of the licensing staff of the Baltimore Gas and i

Electric Company and a representative of the State of Maryland met with me to j

discuss the status of ongoing and future licensing activities pertaining to the Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2.

(See Enclosure I for a list of the meeting participants.)

l, The licensee provided their prioritization of the ongoing licensing activities (Enclosure II) and the current status of each of these items was addressed.

In addition, the licensee s'.ated that they intend to suliait new Technical r

Specification amendment requestr by early 1989 regarding the fellowing items:

I 1.

One time snubber inspection interval extension (Unit ?)

2.

Minimum Pressure Temperature Curves (Unit 2)

{

l 3.

Control room HVAC (Units 1 and 2) v 4

4 Incorporation of the guidance provided by Generic letter 87-09, "Technical a

Specification Changes to Specificatio.13.0.4" (Units 1 and 2)

[

q>

5.

Emergency diesel generator (EOG) cold fast start (l' nits 1 and 2)

{

6.

Safety injection tank (SIT) motor operated valves auto-opening test 7.

ESFAS undervoltage instrumentation (Units 1 and 2) l 8.

Low Temperature /Over Pressure Pressure-Temperature curve (Units 1 and ?)

f 9.

Increased out of service time for SITS (Units 1 and 2)

(

1

}

I 1

QA\\

G311150067 ss1go3 N

i fR ADOCK 05o003g7

[

]

FDC i

(

e 2

10 EDG refueling inspections interval extension (Units 1 and 2)

11. Shutdown cooling (SDC), particularly for a loss of SDC during midloop operation (Units 1 and 2) 12.

10 CFR 50.59 amendment on the containment iodine filter train 13 AFW surveillance interval extension to 24 months.

Orlzl=! !.1:j by Scott Alexander McNeil Proiect Manager Pro.iect Directorate I-1 Division of Reactor Pro.iects I/II Enclosures As stated 0FC

PDI.1
PDI.1 C
SMcNeil:vr NAME :CVogan L

.....:............:...........):............:............:............:............:...........

g:

l DATE :11/ h/88

11/1, /88 OFFICIAL RECORD COPY

- a

1 o

ENCLOSURE I

(

Meetina Participants RG4E S. Cowne L. Larragoite W. McCaughey l

L. Salyards I

I State of Marvland T. Magette

~

E S. McNeil T

BGLE TOP LICENSING SUBMTITAL3/ ISSUES ENCL 0SURE II A.1 5% Enrichment Upgrade to Spent Fuel Pool /New Futi Storage (1 JAN 89)

A.2 Diesel Fire Pump Tech Spec Change (1 JAN 89)

A.3

' REFUELING INTERVAL" Tech Spec Change G ;A:: 2'" (IS DEC 5%)

A.4 Relief Request; Main Steam Line Flaw. Unit I (1 NOV 88) 1 A.5 ASME Form NIS-2 Relief Request (2 OCT 88) l l

A.6 ASME Code Safety Relief Yalve Request l

l A.7 Review of CEOG Topical Report on 'No Clad Lift Off' Methodology (1 DEC 89)

A.8 Unit 2 Cycle 8 ASI Tent Tech Spec Change 4

.l.

r

BGAE TOP LICENSING SUBMTITAIJ/ ISSUES B.!

GS-O/AGS-O/POSRC Tech Spec Change (1 NOV 88)

{

B.2 Steam Generator Tube Eddy Current Exam Tech Spec Change B.3 ERPIP issue B.4 Appendix B Tech Spec Issue B5 Battery Dummy Load Profile Tech Spec Change B.6 Reg. Guide 1.97 SERs S!T Containment Sump B.7 Containment Spray Valve Tech Spec Change B.8 High Burnup Topical Report (Submittal in 0:tober 1988) 2-

.