Summary of 880926 Meeting W/Util & State of MD Re Status of Ongoing & Future Licensing Activities at Plant.List of Attendees & Supporting Matl Encl
ML20206A332
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/03/1988
From: Mcneil S
Office of Nuclear Reactor Regulation
To: Capra R
Office of Nuclear Reactor Regulation
References
NUDOCS 8811150067
Download: ML20206A332 (5)


Text

_ _ - _ _ _ - _ _ _ _ _ _ _ - _ - _ _ - _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

o November 3, 1988 Docket Nos. 50-317 DISTRIBUTION <

and 50-318 6  :

NRC PDR'~~ i Local PDR l PDI-1 Rdg i MEMORANDUM FOR: Robert A. Capra, Director RCapra ,

Pro.iect Directorate I-I SMcNeil l Division of Reactor Projects, I/II OGC EJordan f FROM: Scott Alexander McNeil. Project Manager RGrimes l Project Directorate I-1 ACRS (10) l Division of Reactor, Projects I/II ;3(Johnson,RI  ;

SUBJECT:

SUMMARY

OF LICENSING ACTIVITIES FEETING WITH  !

THE RALTIMORE GAS AND ELECTRIC COMPAhy i I

L On September 26, 1988, members of the licensing staff of the Baltimore Gas and i Electric Company and a representative of the State of Maryland met with me to j discuss the status of ongoing and future licensing activities pertaining to  ;

the Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2. (See Enclosure I >

for a list of the meeting participants.)

The licensee provided their prioritization of the ongoing licensing activities  !

l, (Enclosure II) and the current status of each of these items was addressed. ,

In addition, the licensee s'.ated that they intend to suliait new Technical r Specification amendment requestr by early 1989 regarding the fellowing items:  ;

I 1. One time snubber inspection interval extension (Unit ?)

2. Minimum Pressure Temperature Curves (Unit 2) {

l 3. Control room HVAC (Units 1 and 2)  !

4 v

a 4 Incorporation of the guidance provided by Generic letter 87-09, "Technical .

Specification Changes to Specificatio.13.0.4" (Units 1 and 2) [

q> -

5. Emergency diesel generator (EOG) cold fast start (l' nits 1 and 2)
{.
6. Safety injection tank (SIT) motor operated valves auto-opening test  ;
7. ESFAS undervoltage instrumentation (Units 1 and 2) l  !
8. Low Temperature /Over Pressure Pressure-Temperature curve (Units 1 and ?)

f

! 9. Increased out of service time for SITS (Units 1 and 2) (-

1

} I 1  !

G311150067 ss1go3 QA\

N  ;

i

]

fR ADOCK 05o003g7 FDC

['

i (

e 2

10 EDG refueling inspections interval extension (Units 1 and 2)

11. Shutdown cooling (SDC), particularly for a loss of SDC during midloop operation (Units 1 and 2)
12. 10 CFR 50.59 amendment on the containment iodine filter train 13 AFW surveillance interval extension to 24 months.

Orlzl=! !.1:j by Scott Alexander McNeil Proiect Manager Pro.iect Directorate I-1 Division of Reactor Pro.iects I/II Enclosures As stated 0FC :PDI.1 :PDI.1  :  :  :  :  :

NAME :CVogan L C :SMcNeil:vr  :  :  :

.....:............:...........):............:............:............:............:........... g:  :

l DATE :11/ h/88 :11/1, /88  :  :  :  :  :

OFFICIAL RECORD COPY

_ - _ - _ . - . - _ _ _ _ _ _ _ _ _ _ - - - - - _ . - _ . - _ - . _ _ _ - _ _ _ _ _ . _ _ _ - _ - - - - - - _ _ - _ - . _ _ _ _ _ _ . _ _ _ _ . . _ _ _ . - - - - _ - _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ . - - __-_a

1 o .

ENCLOSURE I

(

Meetina Participants RG4E  !

S. Cowne L. Larragoite '

W. McCaughey l L. Salyards  ;

I I

State of Marvland -

T. Magette

~

E S. McNeil T

BGLE TOP LICENSING SUBMTITAL3/ ISSUES ENCL 0SURE II A.1 5% Enrichment Upgrade to Spent Fuel Pool /New Futi Storage (1 JAN 89)

A.2 Diesel Fire Pump Tech Spec Change (1 JAN 89)

A.3 ' REFUELING INTERVAL" Tech Spec Change G ;A:: 2'" (IS DEC 5%)

A.4 Relief Request; Main Steam Line Flaw . Unit I (1 NOV 88) 1 A.5 ASME Form NIS-2 Relief Request (2 OCT 88) '

l l

A.6 ASME Code Safety Relief Yalve Request l

l A.7 Review of CEOG Topical Report on 'No Clad Lift Off' Methodology (1 DEC 89)

A.8 Unit 2 Cycle 8 ASI Tent Tech Spec Change 4

.l.

r

BGAE TOP LICENSING SUBMTITAIJ/ ISSUES B.! GS-O/AGS-O/POSRC Tech Spec Change (1 NOV 88)

{

B.2 Steam Generator Tube Eddy Current Exam Tech Spec Change B.3 ERPIP issue B.4 Appendix B Tech Spec Issue B5 Battery Dummy Load Profile Tech Spec Change B.6 Reg. Guide 1.97 SERs

- S!T

- Containment Sump B.7 Containment Spray Valve Tech Spec Change B.8 High Burnup Topical Report (Submittal in 0:tober 1988)

. 2-