Forwards Insp Repts 50-313/88-33 & 50-368/88-33 on 881002-07.No Violations or Deviations Noted
ML20206A271
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/08/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20206A275 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR NUDOCS 8811150038
Download: ML20206A271 (2)


See also: IR 05000313/1988033

Text

,

.e

,

.

-

NOV - 81988

<

.

In Reply Refer'To:

Dockets: 50-313/88-35

50-368/88-33

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

. Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. J. R. Boardman of this office

during the period October 2-7, 1988, of activities authorized by NRC Operating

Licenses DPR-51 and NPF-6 for the Arkansas Nuclear One, Units 1 and 2, and to

the discussion of our findings with Mr. S. M. Quennoz and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection included your responses to the 10 CFR 50.62

rule on Anticipated Transients Without Scram (ATWS) and yew commitments to

actions to prevent low-temperature overpressure conditions as defined in

Unresolved Safety Issue (USI) A-46.

Within these areas, the inspection

4

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the NRC inspector. The

inspection findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations vi deviations were identified.

'

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

Should y00 have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Syned lly

Il J. Calbn

-L.,

J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-313/88-33

50-368/88-33

cc w/ enclosure:

(seenextpage)

0:DRb

RIV:RI *

C:PSS *

0:DRS *

JCallan

((1 /6 /88

Q\\

JBoardman/cjg TStetka

JLMilhoan

/ /88

/ /88

/ /88

bl

  • previously concurred

\\,

l

8911150038 8G1108

7

PDR

ADOCK 05000313

o

PDC

,,_ _ _ _ . . . _ . _ . ~ _


_ -----

,'

e

.

.

.

.

Arkansas Power & Light Company-

-2-

cc w/ enclosure:

Arkansas Nuclear One

ATTN:

J. M. Levine, Executive Director

Nuclear Operations

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI
  • R. D. Martin, RA
  • RPB-DRSS
  • Section Chief (DRP/A)

Lisa Shea, RM/ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/A
  • C, Harbuck, NRR Project Manager *DRS

,

  • J.

Boardman

  • 1. Stetka
  • w/766