Concurs W/Proposed Completion Dates W/Exceptions of Listed Items,Per Util 880923 Request Based on Preliminary Results of Long Range Planning Efforts
ML20205T221
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/04/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 8811140172
Download: ML20205T221 (2)


Text

.

In Reply Refer To:

Docket:

50-285 Omaha Public Power District ATTN: Mr. Kenneth J. Morris Division Manager - Nuclear Operations 1623 Harney Street Omaha, Nebraska 68102 Gentleer..

In a letter dated September 23, 1988, you requested new completion dates for 21 items for which completion dates had been previously established.

It is understood that the proposed changes are requested based on the preliminary results of your long-range planning efforts.

We have reviewed your request and concur with the proposed completion dates with the exceptions discu u ed beinw.

The exceptions were discussed with Ms. D. Matthews of your staff.

Replacement of disc assembly springs for HCV-249 and HCV-2988 (OPPD Tracking Number-870326).

It is understood that you will exercise these valves during the current refueling outage to verify that the valve springs are intact.

Based on successful operation of the valves, the proposed cortmitment date is acceptable.

Develop formal guidance for preparation of safety analyses for operability (0 PPD Tracking Number-870628).

It is our understanding, based on discussions with Ms. Matthews, that the date for completion of this item will be changed from December 30, 1988, to completion prior to plant startup from the current refueling outage, presently scheduled for approximately December 5,1988. This change appears to be appropriate since analyses for operability may be required prior to plant startup.

M{

DRP/B NRR DRP M 1

/ RIV: SRI PE

/

PHHarrell/nc RPMullikin TFWesterman JCalvo LJCallan I 11/1 /PA 11/3 /88 11/3 /88 11/3 /88 11/y/S8 g(

fik P'47p' k

sm11ao12 es1104 e

x6 PDR ADOCK 050002S5 y

p P Di..

'l

)

Omaha Public Power District Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Sincerely.

Original Signed By:

L. J. CALLAN L. J. Callan, Director Division of Reactor Projects Cc:

W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt. Esq.

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, DC 20036 Nebraska Radiation Control Program Director bec to DMB (IE51)

R.D. Martin, RA RPB-DRSS SectionChief(DRP/B) it!S System RIV File DRP RSTS Operator Project Engineer, DRP/B Lisa Shea, RM/ALF P. Milano NRR Project Manager DRS RRI