Forwards Safety Insp Repts 50-277/86-07 & 50-278/86-07 on 860327-0509 & Notice of Violation
ML20205R931
Person / Time
Site: Peach Bottom  
Issue date: 05/28/1986
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20205R937 List:
References
NUDOCS 8606060021
Download: ML20205R931 (2)


See also: IR 05000277/1986007

Text

..

.

- -

-

_-

.

..

.-.

-- ._.

. - .

-

.

.

i

3

a

$18 lAA0( 1986

l

Docket Nos. 50-277/DPR-44

i

50-278/DPR-56

8

Philadelphia Electric Company

ATTN:

Mr. S. L. Daltroff

Vice President

j

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

i

'

Subject: Combined Inspection 50-277/86-07; 50-278/86-07

This transmits the findings of the routine safety inspection by

Messrs. J. H. Williams and T. P. Johnson on March 27 - May 9, 1986, at the

Peach Bottom Atomic Power Station, Delta, Pennsylvania. These findings were

based on observation of activities, interviews, measurements and document

reviews, and have been discussed with Mr. R. S. Fleischmann of your staff.

,

l

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Based on the results

of this inspection, it appears that one of your activities was not conducted

in full compliance with NRC requirements, as set forth in the Notice of

Violation, enclosed herewith as Appendix A.

This violation has been

categorized by severity level in accordance with the revised NRC Enforcement

Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR 8583) dated March 8, 1984. Because the violation was corrected during

the inspection period including corrective actions to avoid further

violations and, the corrective actions were reviewed by the inspectors, no

written response is required.

2

A copy of this letter and the enclosures are being placed in the NRC Public

,

j

Document Room.

i

Your cooperation with us is appreciated.

Sincerely,

@f.g ggmed B18

. . -

,

i

<

Samuel J. Collins, Chief,

i

Projects Branch 2, Division

of Reactor Projects

8606060021 860528

4

PDR

ADOCK 05000277

G

PUR

,

0FFICIAL RECORD COPY

CIR PB 86-07 - 0001.0.0

05/22/86

i

O !\\

i

\\

-

.

.._

- - .

- - . - - - - - - .

.

,

j

Philadelphia Electric Company

2

28 MAY 1986

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Combined Inspection Report No. 50-277/86-07 and

50-278/86-07

cc w/encls:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Vice President, Engineering and Research

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic

Electric

G. Leitch, Superintendent, Nuclear Generation Division

Troy B. Conner, Jr. , Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

R. Gallo, Section Chief, DRP

SRI Limerick

Jo,njE,R

Cgs

RP

RI'.

a

.

i m ams,,cb

on

$,

k

'

5/D/86

0FFICIAL RECORD COPY

CIR PB 86-07 - 0002.0.0

05/22/86