ML20205R931
| ML20205R931 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/28/1986 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20205R937 | List: |
| References | |
| NUDOCS 8606060021 | |
| Download: ML20205R931 (2) | |
See also: IR 05000277/1986007
Text
..
.
- -
-
_-
.
..
.-.
-- ._.
. - .
-
.
.
i
3
a
$18 lAA0( 1986
l
Docket Nos. 50-277/DPR-44
i
50-278/DPR-56
8
Philadelphia Electric Company
ATTN:
Mr. S. L. Daltroff
Vice President
j
Electric Production
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
i
'
Subject: Combined Inspection 50-277/86-07; 50-278/86-07
This transmits the findings of the routine safety inspection by
Messrs. J. H. Williams and T. P. Johnson on March 27 - May 9, 1986, at the
Peach Bottom Atomic Power Station, Delta, Pennsylvania. These findings were
based on observation of activities, interviews, measurements and document
reviews, and have been discussed with Mr. R. S. Fleischmann of your staff.
,
l
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Based on the results
of this inspection, it appears that one of your activities was not conducted
in full compliance with NRC requirements, as set forth in the Notice of
Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the revised NRC Enforcement
Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR 8583) dated March 8, 1984. Because the violation was corrected during
the inspection period including corrective actions to avoid further
violations and, the corrective actions were reviewed by the inspectors, no
written response is required.
2
A copy of this letter and the enclosures are being placed in the NRC Public
,
j
Document Room.
i
Your cooperation with us is appreciated.
Sincerely,
@f.g ggmed B18
. . -
,
i
<
Samuel J. Collins, Chief,
i
Projects Branch 2, Division
of Reactor Projects
8606060021 860528
4
ADOCK 05000277
G
PUR
,
0FFICIAL RECORD COPY
CIR PB 86-07 - 0001.0.0
05/22/86
i
O !\\
i
\\
-
.
.._
- - .
- - . - - - - - - .
.
,
j
Philadelphia Electric Company
2
28 MAY 1986
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Combined Inspection Report No. 50-277/86-07 and
50-278/86-07
cc w/encls:
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station
John S. Kemper, Vice President, Engineering and Research
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic
Electric
G. Leitch, Superintendent, Nuclear Generation Division
Troy B. Conner, Jr. , Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encls:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encis)
R. Gallo, Section Chief, DRP
SRI Limerick
Jo,njE,R
Cgs
RI'.
a
.
i m ams,,cb
on
$,
k
'
5/D/86
0FFICIAL RECORD COPY
CIR PB 86-07 - 0002.0.0
05/22/86