MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
_ _.
n-.---.,- -- - _ ~ .., _
- .11 -
..'....-~ ,
TUGCO EiGINEERING DIVISION PROCEDUPS PIVISION ISSUE PAGE l} i !
CCtmOLL..,o $ }d J . CP-EP-16.3 3 06-15-54 1 of 6 V
CotTPOL OF g24 FPEPARED BY ./ e REPORTABLE CEFICIENCIES APPFOVED BY .N .e[
A 1.0 PSFERD:CES 1-A 'IUGCO CA Plan 1-B Title 10 Code of Federal Regulations Part 50.55(e) 2.0 GDIEFAL 2.1 RIRPCSE Tb define the actions aM interfaces recuired to report acparent er potential deficiencies. These reasures are established to assure pcsitive control of de provisiens of Paference 1-A a .d 1-3.
2.2 SCCPE This procedure shall apply te all activities perfc: ed during, fer, or as a result of the design ard procure ent of CPSES.
The provisiens of this procedure shall not be applied to generic deficiencies not specific to CPSES.
2.3 RESPCtJSIBILITY All personnel involved in the design ard procurement of, CPSES are respcnsible for the itplerentatien of the measures described herein.
The Managers of de respective crganizatiens shall be respcnsible for the i. plerentaticn cf ils precedure accordi.~ gly.
2.4 CEFINITICt'S A. Significant "veficiencies - General Peference Attachment 1
- 3. Significant Construction reficiencies Referena Attachmen 2 C. Significant Engineering reficiencies Peference Attachment 3 3.0 PFCCEDL92 3.1 C 'IPOL CF PEPCPl' AND EV7d. CATION ACTIVITIES i
Upen the initial chservatico cf a deficiency potentially reporticle I per the cuidelines established per Reference 1-3, ee arplicable i manager (2;E, CPTE, or Project Scoport Services)shall be inic: ed l 1
60 3 860522 == , ,
GARDE 85-59 PDR
~
W
,e -
' 'ILUCO ENGINEERI!T3 DIVISICM PFOCEECRE REVISICN ISSUE PAGE
[
DATE CP-EP-16.3 3 06-15-54 2 of 6 through the organizatien structure. The nanager shall revies er direct the review of the deficienef within a time frame not to exceed twenty-four (24) hours past the initial obser/aticn. The results of the review shall be cbcurented pr Attachment 4.
'Ite ranager shall refer findings of the review to the Assistant Project General Manager who shall provide the prirary tac interface -
the 'IUGCO Site CA Superviser er designee - with all pertinen evidence of the deficiency. Findings shall also be. simultanecusly forsarded to representatives of the responsible corporate efficers.
iihere specific individuals are identified in this precedure, it shall be specifically noted apprcpriate levels of management shall te substituted cr delegated. In no event shall the reperting efcle te delayed due to the absence of designated personnel.
3.2 FCUDi-UP If applicable, corrective actions shall be as crecified in the cmements secticn of the review. As a minimen, the design prccess shall be evaluated and corrected if related to the cause er origination of the deficiency.
3.3 FETrirICd Pricr to plant cperatien, duplicate files cf these evaluations shall ,
te forwarded to the TCGD Ocerations Grcuo resronsible cr cocrcinat-ing similar evaluations during cperations'. l 3.4 TFAINIIG To ensure compliance with this precedure, all personnel at the apprcpriate supervisory level shall be indcctrinated in the provisiens established herein. Facords cf this indccerination shall ;
te raintained by the respective organizaticn manager.
I
f g$$. .
nw;e
$5 'IUGCO C;GItEERItG DIVISICN PIOCEDURE REVISICN ISSUE PAGE 1 DATE l l
CP-E.3-16.3 3 06-15-64 3 of 6 i
ATTACIND,7 1 ,
SIGNIFICANT CEFICIENCIES - GDERAL (EXCERITD FIC4 REFERD;CE l-B)
If the permit is for c::nstruction of a nuclear ;cwer plant, the 1 older of the permit shall notify the Comission of each deficiency found in design and construction, which, were it to have remained uncorrected, could have affected adversely the safety of operatiers of the nuclear ;cwer plant at any time throughout the expected lifetime of the plant, and which represents:
(a) A significant breakdown in any porticn of the gaality assurance program conducted in. accordance with the requirements of Appendix B; or (b) A significant deficiency in final design as approved ard released for construction such that the desica cbes not c=nform to the criteria and bases stated in the safety analysis report er construe:ico permit; er (c) A dignificant deficiency in constructicn of cr significant dar. age *w a structure, system, ce corrgonent which will require extensive evaluation, extensive redesign, er extensive repair to :reet the criteria and bases stated in the safety analysis re;crt er construc-icn gerait or ~a otherwise establish the adequacy of the structure, system, er cer:p:nent to perform its intended safety functicn; or (d) A significant deviation frem performance specifications which will require extensive evaluatien, extensive redesign, cr extensive repair to establish the adequacy of a structure, system, cr c:mponent to neet the criteria and bases stated in the safety analysis report er constructica permit er to ctherwise establish the adequacy of the structure, system, or cc::penent to perform its intended safety ' function.
4 Q i O '2 Ne c.. e.( e c , /, .,"o. .
7.c . . .
p ...
.w , . , ,
C7 Ci. f ,t f. n.,a.i; y
,w . f.c,
.- x,d:
n -4.
. . ~
,cp ,
V R Tus ec 4m.:t
(
y
- . a r N DGINEERING DIVISICN FCOCEDUPS REVISICN ISSUE P.wE DATE i CP-EP-16.3 3 06-15-84 4 of 6 ATTACEMENT 2 SIGNIFICANT CCSSTRUCTICN CEFICIDICIES Significant be reportable. construction deficiencies are "prcduct"' nonconformances which :nav
'Ihese include, but are ret limited to, the following: "
a.
Product failures substantially belcw specified acceptance criteria; b.
Apparent product deficiencies or da: rage to safety-related structures, systems er cognents for which there is no readily obvicus routine rewrk ce repair procedure available or specified; c.
Product deficiencies responsible CC persennel; discovered subsect.snt to u'l'naI accectance by d.
Construction resolution; deficiencies which clearly require engineering analysis for e.
Ccnstruction deficiencies which will require further testing er evaluation in order torecords.
including inadequate determine the significance of the nonconfermance, 4
0 i
i 1
a
'I i
i
,. -- .,,4 e.--.,--. , , ,p.,- -.-,-r.n- . , . -
- + . . ,
e . .
~
> PFLTEDURE REVISICt1 ISSUE PAGE
'R GCO CGINEERING DIVISICN
~
I CATE CP-EP-16.3 3 06-15-84 5 of 6 A'ITACE1CTP 3 SIGNIFICAh? EGINEERING CEFICIENCIES Significant engineering deficiencies are " design" cencerns wnich may 1. Trac-the integrity of engineering cbcuments previously -issue 3 in acmrdence wi".h design control measures. 'Ihese include, but are not li:nitad to the follcwing:
- a. Errces discovered by the A/E(s) revealed through cubsequent analysis;
- b. Vendor correspondence describire generic product deficiencies;
- c. Vendor correspondence describir, 5xcakdowns in established esineering control programs; 4
- d. Errors in safery class classification identified in reclassificaticn eval'uatiens; ,
Vender 10CFR Part 21 notices, !
e.
I i
'i
.