|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant ML20029A4071991-02-13013 February 1991 Forwards Correspondence sign-off Sheet for LER 90-036-01. Suppl Acceptable for Submittal to NRC ML20057B1781991-02-0505 February 1991 Discusses Allegations Made by M Dow Re Scores of Security, Safety Violations & Allegation of Sexual Harassment at Plant ML20065K0251990-11-0707 November 1990 Forwards Amend 2 to Tech Specs,Modifying Tables 2.2-1 & 3.3-3 Re Neutron Flux Meter Setpoints 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20203J5931999-02-17017 February 1999 Notification of Significant Licensee Meeting with Util on 990329 Re NRC Plant Performance Review Summary Meeting ML20203A5081999-02-0505 February 1999 Notification of 980226 Meeting with Texas Utils Electric Co, Southern California Edison & NPPD Re Control of Hazard Barrier Tr, .Agenda Encl ML20195H9221998-11-17017 November 1998 Forwards Exam Repts 50-445/98-301 & 50-446/98-301 Conducted on 980619-26 with as Given Written Exams Encl,Designated for Distribution ML20153B0331998-09-18018 September 1998 Notification of 980929 Meeting with Texas Utilities Electric Co in Rockville,Md to Discuss Licensee Proposed App K Exemption Request & Topical Rept Submitted in Support of Exemption Request ML20236G8291998-07-0202 July 1998 Notification of 980720 Meeting W/Util in CPSES Nuclear Operations Support Facility Lab Annex to Discuss Midloop Operations During Last Refueling Outage ML20236F7611998-06-29029 June 1998 Notification of 980714 Meeting W/Util in Rockville,Md to Discuss Methods of ECCS Analyses & Licensing Submittals Required for Proposing Exemption to Appendix K & Power Uprate License Amend ML20217M9351998-04-0606 April 1998 Notification of Licensee Meeting W/Util on 980407 in Arlington,Tx Re Status of Licensee Actions in Response to GL 96-01 ML20202E6791997-12-0202 December 1997 Notification of 971209 Meeting W/Texas Utilities Electric Co in Rockville,Maryland to Discuss risk-informed Inservice Testing Request for Addl Info Responses, ML20202B1421997-11-26026 November 1997 Notification of 971115 Meeting W/Util in Arlington,Texas to Discuss Recent Unit 2 Refueling/Maint Outage at TU Electric Comanche Peak Plant ML20212G3921997-10-27027 October 1997 Notification of 971112 Meeting W/Util to Discuss Util 970228 Responses to Remaining Three Open Items Listed in NRC Safety Evaluation on Cable Functionality, .Reissued Due to Change of Cc:List ML20203C1181997-10-24024 October 1997 Discusses OI Rept 4-97-027 Re Falsification of Thermolag Matl Insp Records.Allegation Not Substantiated Therefore Enforcement Action Not Appropriate ML20212B7261997-10-16016 October 1997 Notification of 971031 Meeting W/Util in Arlington,Tx Re Predecisional Enforcement Conference ML20206E3401997-09-19019 September 1997 Requests That NRR Conduct Review of Licensee Backfit Claim to Determine of plant-specific Backfit Exists & Submits Recommended Actions to Be Taken If One Does Exists ML20217R1561997-08-28028 August 1997 Informs That GL 96-04 Did Not Require Response for Licensee That Did Not Have Boraflex in Sf Racks ML20237B9901997-07-0303 July 1997 Informs That on 970529-30,NRC Team Attended Severe Accident Mgt Implementation Demonstration at Comanche Peak Steam Electric Station,In Granbury,Tx ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134N2911996-11-22022 November 1996 Notification of 961205 Meeting W/Util in Arlington,Tx to Discuss Responses to Open Items Listed in NRCs Safety Evaluation on Cable Functionality at Plant, ML20134L9821996-11-19019 November 1996 Notification of Licensee Meeting W/Util on 961204 to Discuss Revision 25 to Emergency Plan ML20128P3011996-10-10010 October 1996 Forwards Analysis of Financial Qualifications & Antitrust Reviews & Input to SER on Proposal to NRC by Tuec for Tx Utilities Corp ML20129E9031996-10-0101 October 1996 Notification of 961002 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20078H7831994-11-0707 November 1994 Forwards Rev 11 to CPSES ODCM & Receipt Acknowledgement Sheet ML20059K4921994-01-21021 January 1994 Notification of 940204 Meeting W/Util in Glen Rose,Tx to Discuss Unit 1 Outage Related Activities ML20059K5261994-01-21021 January 1994 Notification of 940203 Meeting W/Util in Arlington,Tx to Discuss Realignment of Nuclear Overview Functions ML20058C5451993-11-22022 November 1993 Notification of 931202 Enforcement Conference Re Reactor Coolant Spill Inside Containment on 931026 ML20058N1471993-10-0505 October 1993 Notification of 931006 Meeting W/Util in Rockville,Md to Discuss Implementation of Std TSs for Both Units ML20057C9801993-09-27027 September 1993 Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months ML20057A8271993-09-13013 September 1993 Notification of 930920 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Testing & Implementation on Unit 1 ML20056H2941993-09-0101 September 1993 Notification of 930916 Meeting W/Util in Comanche Peak Steam Electric Station to Discuss Safe Shutdown Risk & Other Issues Associated W/Scheduled Oct 1993 Refueling Outage ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128H2931993-02-10010 February 1993 Staff Requirements Memo Re Emergency Motion to Stay Issuance of low-power Operating License.Staff Issued Order Denying Motion ML20128E4301993-02-0505 February 1993 Staff Requirements Memo Re 930129 Affirmation/Discussion & Vote on SECY-93-016 Discussing FRN Concerning Proposed Issuance of OL ML20062J1941993-02-0303 February 1993 Board Notification 93-001:notifies of 930202 Emergency Motion to Stay Issuance of low-power OL Requesting Listed Items Including Issue Order Staying Issuance of License ML20128F3531993-02-0202 February 1993 Discusses Emergency Motion to Stay Issuance of low-power Ol.Motion Requested That Commission Issue Order Staying Issuance of Low Power License & Grant Petitioners Chance to Review Withheld Documentation Re Settlement Agreements ML20128D5741993-01-27027 January 1993 Forwards Sworn Joint Affidavit of I Barnes & Ft Grubelich ML20127L9121993-01-26026 January 1993 Forwards NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.Sworn & Executed Affidavits of I Barnes & Ft Grubelich Will Be Filed as Soon as Possible ML20127H4811993-01-18018 January 1993 Notification of 930121 Meeting W/Util in Rockville,Md to Discuss Fire Protection issues,Thermo-lag Installation Issues & Test Reports ML20127D6951993-01-13013 January 1993 Notification of Significant Licensee Meeting W/Util on on 930122 to Discuss Results of ORAT Insp ML20127C4861993-01-11011 January 1993 Notification of 920115 Public Mgt Meeting W/Util in Region IV Ofc to Discuss CPSES Temporary Mod Program ML20126H3491992-12-29029 December 1992 Notification of Significant Licensee Meeting W/Util on 930107 to Discuss Plant Monthly Status of Const & Licensing Activities ML20126K7681992-12-24024 December 1992 Forwards Part of Earlier Submittal by TU Electric for Distribution as Was Done for Previous Submittal Re ME215 Sapcas Computer Code.Proprietary Abstract Also Encl.Abstract Withheld ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20126D9061992-12-14014 December 1992 Notification of 921217 Meeting W/Util in Rockville,Md to Discuss Fire Protection Issues at Plant ML20057C9921992-10-26026 October 1992 Partially Withheld Memo Discussing Rape Allegation at Plant ML20127F5051992-10-21021 October 1992 Discusses 921020 Telcon W/R Feldman of Thermal Science,Inc (TSI) Re 921018 Rept Made by Util That Less than 10 of 2,000 Conduit Sections Provided by TSI Showed Signs of Delamination & Some Had Occluded Porosity in Cross Sections IR 05000445/19920181992-07-0606 July 1992 Discusses Allegation RIV-92-A-0016 Reviewed During Insp Repts 50-445/92-18 & 50-446/92-18 Re Disposal of Radioactive Matl in Landfill Located on Licensee Property ML20057B4601992-05-15015 May 1992 Discusses Telcon W/Rm Dow Re Plant ML20057B1881991-04-18018 April 1991 Discusses 910405 Telcon W/Alleger Re Security Sys at Plant 1999-08-27
[Table view] |
Text
-. . . - . . ' - -
[o rary,, ]o UidTED STATES
! c NUC' LEAR REGULATORY COMMISSION
{ ., ci WASHING TON, D. C. 20555 s ff '
% .,,M , ,
NCV 2 3 1984 MEMORANDUM FOR: Comanche Peak Technical Review Team Group Leaders l FROM: Vincent S. Noonan, Project Director Comanche Peak Technical Review Team -
SUBJECT:
FINALIZING SSERs FOR PUBLICATION We are committed to publishing our SSERs by the end of this calendar year.
Since we must do this in phases we have established the following schedule
, for the SSER publications. Each group leader must try to have all of his technical input to R.C. Tang, so that we can coordinate with CRESS in having the SSERs typed final. The following deadlines have been established for completing the Comanche Peak Technical Review Team (TRT) SSERs for publication:
SSER 7 -
Electrical / Instrumentation, Civil / Structural, Test Programs - to the printer on or by November 30, 1984.
SSER 8 -
Mechanical / Piping, Miscellanecus - to be published on or by December 21, 1984.
'~
S E & & Q Q Q git 1!t$ f & %4 % QSffiKed'4d%t B PM %
we e 2 C+me ==== ease (I) The SSER secticns for Civil / Structural and Test Programs are currently ur. der review by TRT consultant C. Hofmayer. The SSER secticns for Electrical / Instrumentation (final draft) have not yet been received for review by C. Mcfmayer. Nevertheless, CRESS needs one week to type and reformat the SSER and to have all pages in camera-ready form for printing. Thus, the following deadlines are essential: (Individuals listed in parenthesis on left margin are principally respcnsible for items denoted.)
(C. Hofmayer, C. Hofmayer comments on Test 11/19 R.C. Tang) Programs SSER sections sent to group leader R. Keimig.
(Ccmments on Civil / Structural SSER
, sections were provided to L. Shao on 11/14.)
(R.Keimi Test Programs and Civil / Structural 11/21 L. Shao) g, SSER sections revised.by group leaders.
(J. Calvo)
- Electrical /Instrurentation SSEP, 11/26 sections (final draf t) ready for review by C. Hofmayer.
FO!A-85-59
&w% pm . . . _ ._ . .
,.. i.
(C. Hofmayer Comments on Electrical / Inst umentation 11/21
. R.C... Tang) .
SSER sections received from C. Hofmayer
, and sent to group leader J. Calvo.
(J.'Calvo) Electrical / Instrumentation SSER 11/27 sections revised by group leader (C. Posiusny)
- SSER sections for Civil / Structural 11/26 Test Programs retyped and ready for editorandmanagement(Nconan/Gagliardo) review.
(C. Haughney) Allegation listings for Electrical / 11/21 Instrumentation, Civil / Structural, Test Programs ready for typing.
(C. Poslusny) Management review of SSER sections on 11/28 Electrical / Instrumentation, Civil /
, Structural, Test Programs completed and SSER 7 ready for CRESS. -
(C. Posiusny)
- SSER 7 to printer 11/30 4
(II) The SSER sections en Mechanical / Piping and Miscellaneous are currently i
unier review by TRT consultant B. Saffell. The sequence is as follows:
(L. Shao) Executive summary for Mechanical / 11/23 Piping ready for review by B. Saffell.
(B. Saffell, *
- 8. Saffell comments on Mechanical / Piping, 11/30 R.C. Tang) Miscellaneous SSER sections to group i
leaders.
l (L. Shao SSER sections on Mechanical / Piping, 12/7 j R. Bangart) Miscellaneous revised by group leaders.
- (C. Poslusny)
- SSER sections on Mechanical / Piping 12/10 and Miscellaneous retyped and ready for editor and management (Noonan/Gagliardo)
- review.
l
\
4
. i l
. \
a i .
l
__ __ m ____.______________m.________-_.___._ _ _ _ . -. _ _ _ _ _ _ _ _ _ _ _ - - - . . _ _____A-____J. _- _ ___.-.. _ . . _ _ _ ___ __ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . . . _ _ _ _ _ _ _ _ _ _ - . _ .
(B.Saffell)
- Allegation listings for Mechanical / 12/10 Piping and Miscellaneous ready for typing.
(C. Poslusny)' Management review of SSER sections on 12/14 Mechanical / Piping and Miscellaneous completed and SSER 8 ready for CRESS. -
(C. Posiusny) SSER 8, published - 12/21 (III)
- CliIKMITMj)e3
- ddesul-i uuww4jggndISSEPysrcubTs'N l 11/26 C. McCracken ee4A/QC%r#66atingsai~eY(fMcEUdsMUn't zrmrtp M a (R.C. Tang)
- r- - NmeMhawa=*nNmm 12/3 (ANL Consultant) N um*A-~I N Si"~l~5?5M .
TT '."mawa*
t +Nt mb
-15EPeschioncremssbMYP wedse1-hva-omui;bdeace::54 12/7 (C. Pos1usny) -bFm suseuins:nnIDA/.Qha mhEga.t,ingg 12/10 WC= m4?WSmskichan '__
s mMGlAd *"TcW!ca74*'a-eni uer f
(C. Haughney) Allegation listings fo N 12/10 Ccatings-ready for typing.
(C. Poslusny)
- Management review of SSER sections 12/14
. on SMXiiE4rdbCoatings ccmpleted and SSER 9 ready for CRESS.
(C. Poslusny)
- r o - r t W X e'd G , 12/21 All group leaders'should note the folicwing:
- 1. If any reviewed allegation is or appears to be related to other TRT subject areas, the group leaders are responsible fcr coordinating this as appropriate. A sentence or two addressing this should be added to the SSER section (possibly under Characterization of Allegations and/or the Findings section). -
eD
+ . .
, . , . .e. < - - . , .-
....__1____
. . = .
d
.i , . .. t i .
i .
- 2. To the extent possible, cicse-out interviews with allegers have been conducted. Mwuha-freto-Aede,chygsppagjktyMnj.wdd-a brief dis 3 !
- mmmmc
- mtervhAceitsmittcomg3 ptgesSSE%g,ec_tionsfWetg'., 1 the
., findings were discussec witn the alleger anB ne agreed; the af eger disagreed and the TRT did reinspectior/ reevaluation and still cer.e to the previous findings; etc.) An appropriate place for adding this would be at ,
the end of the Findirigs/ Assessment se.:tica and before the Con:h:sfons -
section.
Cooperation of group leaders is requssted in meeting the above scnedule. .
Input from group 7eaders should be sent to R.C. Tang by the rest expeditious mode (e.g., by fax, express mail, hand-delivered). :
1 u dp 4 :
i Vincent S. Notnan, rejecC Director
,! Comancna Peak Toghnical Review Team I cc: D. Eisenhut i J. Gagliardo '
C. Hofmayer C. Peslusny
- 5. Saffell
- C. Haughney D. Bounelis R. Wessman :
W. Oliu
- A. Vietti C. Brcwn R.C. Tang I
t
/
d j
a
- . .sm. e . .moe-*. ~ * ~ ^