ML20205P716
| ML20205P716 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/20/1987 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20205P721 | List: |
| References | |
| NUDOCS 8704030351 | |
| Download: ML20205P716 (2) | |
See also: IR 05000348/1987007
Text
Y'
fe//&
_
- ~
- e
MAR 2 01987
. Docket Nos. 50-348, 50-364
Alabama Power Company
V ATTN: Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham,-AL 35291-0400
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-348/87-07AND50-364/87-07)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. H. Miller, Jr. on February 24-27., 1987.
The inspection included a review
of activities authorized for your Farley facility.
At the conclusion of-the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined- during the inspection are identified in the report.
Within
these . areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
,
NRC requirements.
The violation, references to pertinent requirements, and
elements to be included in your response are described in the enclosed Notice
of Violation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by
[
DavidM.Verrelli)
David M. Verrelli, Chief-
Reactor Projects Branch 1
Division of Reactor Projects.
,
Enclosures:
(See^page 2)
8704030351 870320
ADOCK 05000348
i
G
9
_
3Cet
C
.'
.'
j
Alabama Power Company
2
MAR 2 01987
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
/W. O. Whitt, Executive Vice President
/J. D. Woodard, General Manager -
Nuclear Plant
J . G. Hairston, III, General Manager -
d.NuclearSupport
W. McGowan, Manager-Safety Audit
jand Engineering Review
J. K. Osterholtz, Supervisor-Safety
Audit and Engineering Review
c w/encls:
RC Resident Inspector
. Reeves, Project Manager, NRR
Document Control Desk
State of Alabama
RII
R
RII
RII
W
HD(ancePP
d'
WM 11er:es
TCo lon
AHerdt
3/gg/87
3
/87
3/ /87
3/p /87
u
-
-