ML20205P206
| ML20205P206 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 10/31/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20205P209 | List: |
| References | |
| NUDOCS 8811080022 | |
| Download: ML20205P206 (2) | |
Text
- _ _ _
0 0
OCT 31 1988 Docket No. 50-461 Il?inois Power Company ATTN: Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 Gentlemen.
SUBJECT:
EXAMINATION REPORT On September 19-30, 1988, the NRC administered examinations to employees of your organization who had applied for licenses to operate your Clinton 1 Power Station. At the conclusion of the examination, the examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosure (s) will be placed in the NRC Public Documen*
Room.
Should you have any questions concerning this examination, please contact us.
Sincerely, y
Original Signed By M. J. Jordan Geoffrey C. Wright Chief Operations Branch
Enclosures:
1.
Examination Report No. 50-461/0L-88-01 C.
SR0 Examination and Answer Key 3.
R0 Examination and Answer Key See Attached Distribution Y'"*g/Vdf R I RIII RIJ RIII RI I Gn/4 iv))f 9 b W
Jyr C.a e
p N fel /Ims ger Wr g i
oop g
[h 88110G0022 881031 PDR ADOCK 05000461 TL V
PDC f
l 00T.31 toss l
l Illinoit Power Company 2
l:
Distribution l
\\
cc w/ enclosures.
1 D. P. Hall, Vice President R. D. Freeman, Manager, Nuclear Station Engineering Department 000/0C6 (RIOS)
Licensing Fee Management Branch Resident Inspector, RIII l
Richard Hubbard J.W.McCaffreyisionChief. Public i
l Utilities Div H. S. Taylor, Quality Assurance Division, Sargent & Lundy Engineers David Rosenblatt, Governor's Office of Consumer Services j
Sheldon Zabel, Esquire Schiff,Hardin,&Walte l
L. Larson, Project Manager, General Electric Company i
l Chairman of DeWitt County l
l Illinois Department of Nuclear Safety 1
- 0. Schopfer, Project Manager, Sargent & Lundy Engineers l
R. Wyatt, Plant Training Manager i
K. E. Perkins, Branch Chief, OLB J. A. Stevens, Project Manager, NRR i
Defferding, Contract Exam Supervisor, 8
PNL i
M. R. Johnson, EDO l
D. Wilson, Plant Licensing Administrative Supervisor I
I k
i i
f l
l l
l l
-