Application for Amend to License NPF-72,revising Tech Spec 4.8.1.1.2f to Extend on One Time Basis,Previously Accepted 31 Month Surveillance Testing Requirement for Diesel Generators 1DG01KA & 1D01KB for Addl 7 Months.Fee Paid
ML20205N840
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 10/26/1988
From: Hunsader S
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
Shared Package
ML20205N844 List:
References
5243K, NUDOCS 8811040374
Download: ML20205N840 (2)


Text

_ _ _______ _ _ - _ _ _ _ _ _ _ _ _ _

~N Commonwealth Edison

) One First National Ptaza, Chicago. Ithnois 8'

( O

') Addr:ss' Reply to: Post Offica Box 767 '

~

x

/ Chicago. Ilhnois 60690 October 26, 1988 Mr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, DC 20555 Attne Document Control Desk Subject Braidwood Station Unit 1 Application for Amen &nent to racility operating License NPT-72 Appendix A, Technical Specifications NRC Docket No. 50-456

Dear Mr. Murley:

Pursuant to 10CFR 50.90, Com onwealth Edison proposes to amend Appendix A, Technical Specifications, of racility Operating License NPT-72.

The proposed amendment requests a change to Technical Specification 4.8.1.1.2f to entend, on a one-time basis, the previously accepted 31 month surveillance testing requirement for Diesel Generators 1DG01KA and 1DG01KB, for an additional 7 months, until the first refueling outage for Braidwood Station Unit 1.

The revised Technical Specification pages are contained in Attachment A.

The description and summary of the proposed changes is included in Attachment B.

Attachment C pr tvides the Safety Evaluation and Environmental Assessment.

The proposed changes have been reviewed and approvud by both On-site and Of f-site review in accordance with Comonwealth Edison Cvepany procedures.

Westinghouse and the diesel generator manuf acturer (Cooper Industries - Energy Services Group) have also reviewed this change and have found it to be accept-able.

Commonwealth Edison has reviewed this proposed amen &nent in accordance with 10 CFR 50.92(c) and determined that no significant hasards considerations exist. This evaluation is documented in Attachment D.

4 Comonwealth Edison is notifying the State of Illinois of our application for this amen &nent by transmitting a copy of this letter and its attachments to the designated State Official.

pol

'I I

L eck '/9 i

i W l' gOOT p$

G811040374 881026 PDR ADOCK 05000456 P

PCC i

. ~ _ _, _, _ _ _,. _, _ _ _, _

o,

=

8dr. Thomas E. Murley October 26, 1988 An expedited NRC review is requested so that the revised Technical Specification'can be in place prior to the Braidwood Unit 1 surveillance outage, scheduled to start in early February, 1989. Associated work packages will need to begin to be prepared approalmately two months prior to the start of the outage.

In addition, with Unit 2 surveillances becoming due at the same time, a February,1989 Unit 1 outage would result in a December, 1988 surveillance outage start for Unit 2.

Acceptance of this amendment will allow the Unit 1 surveillauce outage to be cancelled and allow for these Technical Specification surveillances to be accomplished during the Braidwood Unit 1 Refueling outage, scheduled to start in early September,1989.

Also, the entension will allow the Unit 2 surveillance outage to begin in early January, 1989.

In accordance with 10 CFR 170, a fee remittance in the amount of

$150.00 is enclosed.

Please direct any questions you may have concerning this matter to this office.

Very truly yours, Cf=M S. C. Hunsador Nuclear Licensing Administrator crs Enclosures Tee Romittance Attachments (A):

Proposed Technical Specification Changes (B):. Summary of Proposed Changes (C):

Evaluation of Significant Hasards Considerations cca Resident Inspector - Braidwood S. P. Sands NRR "'"

Regional Office RIII M. C. Parker - State of Ill.

5243K