APR I 81986
In Reply Refer To:
Dockets: 50-313/86-07
50-368/86-07
,
I
Arkansas Power & Light Company
. -
ATTN: John M. Griffin, Senior
!#
Vice President - Energy Supply
.
^
P. O.; Box 551
Little' Rock, Arkansas 72203
l
Gentlemen:
!
(
This refers to the inspection conducted by Mr. R. E. Baer of this office during
'
the period March 17-21, 1986, of activities authorized by NRC Operating Licenses
DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the discussion
of our findings with Mr. J. M. Levine and other members of your staf f at the
conclusion of the inspection.
j
Areas examined during the inspection included solid radioactive waste management
and transportation activities; Within these areas, the inspection consisted of
'
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
These findings are documented in
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
'this violation, in writing, in accordance with the provisions of Section 2.201
,
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
,
l.
l
In accordance with 10 CFR 2.790(a), a copy of this letter and the encicsures
l
will.be placed in the NRC Public Document Room unless you notify this office, by
l
telephone, within 10 days of the date of this letter, and submit written appli-
,
l
cation to withhold infnrmation contained therein within 30 days of the date of
this letter.
Such application must be consistent with the requirements of
'
l
2.790(b)(1).
The response directed by this letter and the accompanying Notice is not subject
l.
to the clearance procedures of the Office of Management and Budget as required
!
by the Paperwork Reduction Act of 1980, PL 96-511.
'
i
RIV:FRPS
C:FRPS
D:0
3
C:RP6fB
C:RPB f /
-
REBaer/tw
BMurray
art
DRHunter
JEGa 1
do
1
Rp
/86
h A5/86
<////
g/Q/86
g/ /86
p
8605020270 860418
V
i
ADOCK 05000313
l
0
g
G
l
t
<
.
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed Dy
J. E. Gegliardo
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclesures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/86-07
50-368/86-07
cc w/ enclosures:
J. M. Levine, General Manager
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Di.ector
bec to DMB (IE06)
bcc distrib. by RIV:
- RPB
- Resident Inspector
R. D. Martin, RA