Marked-up Insp Plan for Ge,San Jose,CA,860414-18. Entrance Meeting Text EnclML20205N726 |
Person / Time |
---|
Issue date: |
04/14/1986 |
---|
From: |
NRC |
---|
To: |
|
---|
Shared Package |
---|
ML20204B851 |
List: |
---|
References |
---|
REF-QA-99900403 PROC-860414, NUDOCS 8704030093 |
Download: ML20205N726 (6) |
|
Similar Documents from NRC |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217H0471999-09-30030 September 1999 Management Directive & Handbook 8.11, Review Process for 10CFR2.206 Petitions ML20212J8561999-09-13013 September 1999 Draft NRC Insp Manual,Insp Procedure 95001, Supplemental Insp for One or Two White Inputs in Strategic Performance ML20211F8961999-08-18018 August 1999 Revised Reactor Oversight Process Pilot Program Guidelines ML20211F9221999-08-13013 August 1999 Draft Inspection Procedure 71130, Physical Protection ML20211F9291999-08-11011 August 1999 Draft Inspection Procedure 71111, Initiating Events (10). Mitigating Systems (90) ML20217M9461999-06-30030 June 1999 Commissioner'S Assistant Handbook ML20216E1401999-06-0707 June 1999 SRP for Review of Decommissioning Plans & Other Info Submitted to Support Release of Nuclear Facilities, Draft for Review & Comment Only ML20195H6311999-05-20020 May 1999 Pilot Program Guidelines ML20195H7351999-05-19019 May 1999 Draft NRC Inspection Manual,Manual Chapter 0610, Inspection Repts. Also Encl,Draft Manual Chapter 06XX Entitled, Significance Determination Process ML20195H7071999-05-14014 May 1999 Draft NRC Inspection Manual,Inspection Procedure 71152, Identification & Resolution of Problems ML20210L3321999-05-10010 May 1999 Final USNRC Contingency Plan for Y2K Issue in Nuclear Industry ML20195H6381999-05-0909 May 1999 Draft NRC Insp Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase ML20195H6471999-05-0707 May 1999 Draft NRC Insp Manual,Inspection Procedure 71111, Reactor Safety-Initiating Events,Mitigating Systems,Barrier Integrity ML20195H6621999-05-0707 May 1999 Draft NRC Inspection Manual,Inspection Procedure 71114, Reactor Safety - Emergency Preparedness ML20206F2231999-04-27027 April 1999 NRC Manual Chapter 0350 Restart Action Plan for Clinton Power Station ML20195H6701999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71121, Occupational Radiation Safety ML20195H6871999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71150, Plant Status ML20195H6761999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71122, Public Radiation Safety ML20212J4721999-04-16016 April 1999 Proposed Final Rept, Integrated Matls Performance Evaluation Program Review of North Dakota Agreement State Program,9904013-16 ML20207L3591999-02-28028 February 1999 Budget Estimates and Performance Plan Fiscal Year 2000 ML20206M9521999-02-11011 February 1999 Preliminary Guidelines for Evaluating Dose Assessments in Support of Decommissioning ML20205J6741999-01-27027 January 1999 NRC Insp Manual Chapter 1360, Use of Physician & Scientific Consultants in Medical Consultant Program ML20151Z0531998-07-31031 July 1998 Instructions for Completing Nrc'S Uniform LOW-LEVEL Radioactive Waste Manifest ML20237A3321998-07-30030 July 1998 Audit Guidance,Severe Accident Management Implementation ML20236T4251998-07-22022 July 1998 Internal Commission Procedures ML20216C2041998-04-0202 April 1998 Fy 1998 Regional Operating Plan for Region II ML20216C1591998-04-0202 April 1998 Division of Nuclear Matl Safety FY97 Self-Assessment Plan ML20198P4001998-03-31031 March 1998 Radioactive Waste Mgt H-202, Training Manual ML20217G0231998-03-30030 March 1998 Govt Performance & Results Act, Performance Plan FY99 ML20216D0261998-02-28028 February 1998 Performance Plan Fy 1999 ML20216C5911998-02-27027 February 1998 FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 980227 IA-98-111, FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 9802271998-02-27027 February 1998 FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 980227 ML20203H3271998-02-0505 February 1998 Restart Assessment Plan Millstone Station ML20203M4861998-02-0202 February 1998 Draft Govt Performance & Results Act Performance Plan FY99 ML20199H9191997-11-30030 November 1997 NRC DRUG-FREE Workplace Plan ML20236K4981997-10-31031 October 1997 Nrc/Oas Training Working Group Recommendations for Agreement State Training Programs ML20202J2701997-10-31031 October 1997 NRC Strategic Plan.Fiscal Year 1997 - Fiscal Year 2002 ML20217J8081997-09-30030 September 1997 Strategic Plan for Fiscal Year 1997-2002 ML20211K3271997-09-30030 September 1997 Quality Management Program ML20210R7701997-08-11011 August 1997 Working Draft Entitled, Unsealed Byproduct Matl - Low Dose Diagnostic Studies, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7751997-08-11011 August 1997 Working Draft Entitled, Unsealed Byproduct Matl - High Dose Radiopharms for Therapy, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7371997-08-0707 August 1997 Working Draft Entitled, Teletherapy, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7421997-08-0707 August 1997 Working Draft Entitled, Low Dose Sealed Sources, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7591997-08-0707 August 1997 Working Draft Entitled, Gamma Stereotactic Radiosurgery, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7521997-08-0707 August 1997 Working Draft Entitled, High Dose Rate Remote Afterloaders as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20151L8431997-07-31031 July 1997 Handbook 10.131, Protection of NRC Employees Against Ionizing Radiation ML20151L8361997-07-31031 July 1997 Directive 10.131, Protection of NRC Employees Against Ionizing Radiation ML20198K9481997-07-22022 July 1997 Restart Assessment Plan Millstone Station ML20211F1261997-07-21021 July 1997 Restart Assessment Plan,Millstone Station ML20249C4451997-03-19019 March 1997 Directive 8.14, Evaluating Safety Performance of Nuclear Power Reactor Licensees 1999-09-30
[Table view]Some use of "" in your query was not closed by a matching "". Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20217H0471999-09-30030 September 1999 Management Directive & Handbook 8.11, Review Process for 10CFR2.206 Petitions ML20212J8561999-09-13013 September 1999 Draft NRC Insp Manual,Insp Procedure 95001, Supplemental Insp for One or Two White Inputs in Strategic Performance ML20211F8961999-08-18018 August 1999 Revised Reactor Oversight Process Pilot Program Guidelines ML20211F9221999-08-13013 August 1999 Draft Inspection Procedure 71130, Physical Protection ML20211F9291999-08-11011 August 1999 Draft Inspection Procedure 71111, Initiating Events (10). Mitigating Systems (90) ML20217M9461999-06-30030 June 1999 Commissioner'S Assistant Handbook ML20216E1401999-06-0707 June 1999 SRP for Review of Decommissioning Plans & Other Info Submitted to Support Release of Nuclear Facilities, Draft for Review & Comment Only ML20195H6311999-05-20020 May 1999 Pilot Program Guidelines ML20195H7351999-05-19019 May 1999 Draft NRC Inspection Manual,Manual Chapter 0610, Inspection Repts. Also Encl,Draft Manual Chapter 06XX Entitled, Significance Determination Process ML20195H7071999-05-14014 May 1999 Draft NRC Inspection Manual,Inspection Procedure 71152, Identification & Resolution of Problems ML20210L3321999-05-10010 May 1999 Final USNRC Contingency Plan for Y2K Issue in Nuclear Industry ML20195H6381999-05-0909 May 1999 Draft NRC Insp Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase ML20195H6471999-05-0707 May 1999 Draft NRC Insp Manual,Inspection Procedure 71111, Reactor Safety-Initiating Events,Mitigating Systems,Barrier Integrity ML20195H6621999-05-0707 May 1999 Draft NRC Inspection Manual,Inspection Procedure 71114, Reactor Safety - Emergency Preparedness ML20206F2231999-04-27027 April 1999 NRC Manual Chapter 0350 Restart Action Plan for Clinton Power Station ML20195H6701999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71121, Occupational Radiation Safety ML20195H6761999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71122, Public Radiation Safety ML20195H6871999-04-21021 April 1999 Draft NRC Insp Manual,Inspection Procedure 71150, Plant Status ML20212J4721999-04-16016 April 1999 Proposed Final Rept, Integrated Matls Performance Evaluation Program Review of North Dakota Agreement State Program,9904013-16 ML20207L3591999-02-28028 February 1999 Budget Estimates and Performance Plan Fiscal Year 2000 ML20206M9521999-02-11011 February 1999 Preliminary Guidelines for Evaluating Dose Assessments in Support of Decommissioning ML20205J6741999-01-27027 January 1999 NRC Insp Manual Chapter 1360, Use of Physician & Scientific Consultants in Medical Consultant Program ML20151Z0531998-07-31031 July 1998 Instructions for Completing Nrc'S Uniform LOW-LEVEL Radioactive Waste Manifest ML20237A3321998-07-30030 July 1998 Audit Guidance,Severe Accident Management Implementation ML20236T4251998-07-22022 July 1998 Internal Commission Procedures ML20216C2041998-04-0202 April 1998 Fy 1998 Regional Operating Plan for Region II ML20216C1591998-04-0202 April 1998 Division of Nuclear Matl Safety FY97 Self-Assessment Plan ML20198P4001998-03-31031 March 1998 Radioactive Waste Mgt H-202, Training Manual ML20217G0231998-03-30030 March 1998 Govt Performance & Results Act, Performance Plan FY99 ML20216D0261998-02-28028 February 1998 Performance Plan Fy 1999 ML20216C5911998-02-27027 February 1998 FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 980227 IA-98-111, FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 9802271998-02-27027 February 1998 FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 980227 ML20203H3271998-02-0505 February 1998 Restart Assessment Plan Millstone Station ML20203M4861998-02-0202 February 1998 Draft Govt Performance & Results Act Performance Plan FY99 ML20199H9191997-11-30030 November 1997 NRC DRUG-FREE Workplace Plan ML20202J2701997-10-31031 October 1997 NRC Strategic Plan.Fiscal Year 1997 - Fiscal Year 2002 ML20236K4981997-10-31031 October 1997 Nrc/Oas Training Working Group Recommendations for Agreement State Training Programs ML20217J8081997-09-30030 September 1997 Strategic Plan for Fiscal Year 1997-2002 ML20211K3271997-09-30030 September 1997 Quality Management Program ML20210R7701997-08-11011 August 1997 Working Draft Entitled, Unsealed Byproduct Matl - Low Dose Diagnostic Studies, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7751997-08-11011 August 1997 Working Draft Entitled, Unsealed Byproduct Matl - High Dose Radiopharms for Therapy, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7371997-08-0707 August 1997 Working Draft Entitled, Teletherapy, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7521997-08-0707 August 1997 Working Draft Entitled, High Dose Rate Remote Afterloaders as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7421997-08-0707 August 1997 Working Draft Entitled, Low Dose Sealed Sources, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20210R7591997-08-0707 August 1997 Working Draft Entitled, Gamma Stereotactic Radiosurgery, as Part of NRC Program to Revise 10CFR35 & Associated Guidance Documents ML20151L8431997-07-31031 July 1997 Handbook 10.131, Protection of NRC Employees Against Ionizing Radiation ML20151L8361997-07-31031 July 1997 Directive 10.131, Protection of NRC Employees Against Ionizing Radiation ML20198K9481997-07-22022 July 1997 Restart Assessment Plan Millstone Station ML20211F1261997-07-21021 July 1997 Restart Assessment Plan,Millstone Station ML20249C4451997-03-19019 March 1997 Directive 8.14, Evaluating Safety Performance of Nuclear Power Reactor Licensees 1999-09-30
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
.
.y 1
Initial Inspection ,
INSPECTION PLAN 4 for GENERAL ELECTRIC COMPANY l SAN JOSE, CALIFORNIA April 14-18,1986 i
L 'I . Purpose To review and close-out over 170 allegations made by a former GE nuclear engineer to the Government Accountability Project (GAP) regarding alleged programmatic deficiencies in Quality Assurance /
Control activities at GE's San Jose, California, facility.
The primary emphasis, of th'is initial inspection, will be directed .
towards addressing those allegations associated with safety-related equipment / services. In order to maximize this inspection, only 20-25 items will be reviewed to determine (1) the potential safety significance of the allegers concerns and (2) to determine the total extent of the problem that may exist at General Electric. .,
II. Scope The following categories will be reviewed to assess issues identified to GAP by the alleger:
-l i
j t
8704030093 870323 i PDR GA999 EMVGENE l ,
99900403 PDR ,, -
.~
N i
$(E Of %, . m 1 -
-2 ?
4 -
A. Design Control $0/f /$ VY5r h a fnc4ys4D .
- 1) Reactor Mode Switch f
~
- 11) Change Requests (CRs)
- O iii) Engineering Change Notices (ECNs) iv) Engineering Review Memoranda (ERM) g I
v) Deferred Verifications q; Al 8 fD1 hC B.
M Indoctrination and Training /
M C. General Electric Personnel Records S L ,1 , c v 9
III. Team Make-Up bS ' '
R.McIntyre(SPIS)
JMf2S[
y P. Prescott (SPIS)
Q.Howard(EG&G)
& hWlf YW .
s IV. ' Schedule #
This inspection will also include a meeting with the alleger in San Jose.
This meeting is necessary to gain more insight into some of the specific pQ WA.AV pge b &
'M"f. 9
( "G J+
. . . . . 9Q
.- . . . . . . . . .. ~. , - ~ . . . .
. [
'l 1
allegations made 'against General Electric. ' Representatives from NRC and t
GAP will be present. In addition to a court reporter will record this interview.
Additional inspections to review this information gathered by'GE will be scheduled if appropriate.
j V. Documents to be Examined 9
As a minimum, the following documents will,be reviewed:
- 1. GE Topical Report (NEDO 11209-04A) ,
- 2. GE QA Manual
- 3. GE Engineering Operating Procedures ,
a It should be noted that the emphasis will be on procedures in effect during the time frame between 1978 and 1982, which represents the period in which these allegations were referenced in Mr. Milam's work record. -
_.. . . . . ~ _ . . .
. -l f ,
l Q
_ Document-Name-TALKING PAPER GENERAL' ELECTRIC l Requestor's ID: *
-- SHERRY '
Author's Name:- ;.
t Pettis
- Document Comments: ,
3 2
94 0
t I
i i
e l
I ,
I '
I
)
i I'
t- _. J, ' . . . - , , . , . - . . . _ . . . , . , , ,, . ,,, , _. , , ,
.---.-----w-. ._.-4..-,..,m.,
l
~
~
'- ENTRANCE MEETING TEXT !
The purpose of this inspection is to review allegations made by Mr. Sam Milam III, !
.L a former General Electric Nuclear Engineer, to the Government Accountability Project (GAP). Over 170 separate allegations were made which raise questions ;
concerning manufactured under General Electric's Quality Assurance / Control Program i
during the period March 1978 to April 1982. During this initial inspection ,
approximately 20 allegations will be reviewed. At its conclusion, the NRC will :
assess the results and decide the best course of action to close-out the remaining allegations. One alternative at this time is to have General Electric gather !
documentation and respond to the remaining allegations. Once completed, the NRC .
will schedule additional as necessary inspections to review the documentation .
3 supporting General Electric's response.
The NRC is in possession of several thousand documents which account Mr. Milam's a work history during the period referenced above. In addition the NRC has a report, prepared by Mr. Charles E. Stokes for GAP, which highlights this work history, Also, a report entitled " Deferred Verification," dated July 11, 1983, authored by Mr. Milam, is also in our possession.
- i. At the conclusion of the NRC's review of this effort, an inspection report will be generated and forwarded to General Electric. Documents used in support of this activity will be made available in the Public Document Room.
?
! The NRC appreciates General Electric'r cooperation in this effort to resolve and
- close-out these allegations in the most efficient and timely manner.
i k .
e +-r Me
,,.4 . . ,
L 3 l"
t GAP QUESTIONS Requestor's ID:
SHERRY Author's Name:
Pettis
\^
Document Coments: .,
h{
7Qadt C0F 05E t N 1,4) w Vy %d5 L y<5 T dir w 3
.[
s b
9 m
i " .
~
i__Yi_'_____._:___l'_'_1~_;_'~_,_ ~_c'""~*~---r-'-- - - - , - - - - - . . . , , , . ,
_ , . , _ , , , _ , _ _ , ,