[] Commonwealth Edison
(
) One First Nitioral Plaza Ch ergo. Ilhno s f
( O "7 Address Reply to Post Office Box 767
/ Chicago, lihnois 60690 x
April 23, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 FSAR Amendment No. 47 ftC Docket Nos. 50-454, 50-455, 50-456 and 50-457
Dear Mr. Denton:
The application for construction permits and operating licenses for Byron Station Units 1 rnd 2 and Braidwood Station Units 1 and 2, docketed on September 20, 1973, are hereby amended by submittal of Amendment 47 pursuant to 10 CFR 50.34.
Amendment 47 to the Byron /Braidwood FSAR consists of responses to new questions from the Effluent Treatment Systems Branch (321.0 series), the Instrumentation and control Systems Branch (420.0 series), the Quality Assurance Branch (423.0 series), the Chemical Engineering Branch (600.0 series), the Human Factors Engineering Branch (620.0 series), and the Procedures and Test Review Branch (640.0 series).
Also included are revised responses to Questions 010.64, 040.2, 040.4, 040.12, 040.17, 040.40, 040.53, 040.96, 121.2, 270.3, 311.14 (Braidwood), 311.15 (Byron), 321.75, 321.87, 362.1 (Braidwood), and 423.25, and text changes.
Attachment A to this letter is an itemized summary of changes contained in the amendment. Attachment B to this letter is a table of differences between pages contained in Amendment 47 and pages previously transmitted to the NRC for advanced review.
1 i
3 o 1I 860423 K
CK 05000454~
H. R. Denton April 23, 1986 Three (3) signed originals and fifty-seven (5*1) copies of this amendment are submitted for NRC use..
Please direct any questions you may have regarding these matters to this office.
Very truly yours, K. A. Ainger Nuclear Licensing Administrator la SUBSCR ED and to befor th K day of LGLU.
, 1986 1i
/)fn Notary Public f
1 h
1561K L
ATTACHMENT A
=
)
SUMMARY
OF CHANGES CONTAINED IN B/B-FSAR AMENDMENT 47 PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES Page 2.3-9 (B ra'idwood )
Statement concerning proposed update of Subsection 2.3.1.2.4 deleted.
Update was provided in Subsection 9.2.5.3.
Pages 2.5-89 (B raidwood) and 2.5-85 (Byron)
Editorial corrections, kl Page 2.5-173 (B raidwood)
Corrected foundation data and lake screen house estimated settlement.
Figures 2.5D-46 and Editorial corrections.
2.5D-47 (Byron)
Pages 3.2-1, 3.2-2, and 3.2-2a Clarification of discussion of seismic classification.
Pages 3.2-4, 3.2-7, 3.2-8, Corrected to agree with 3.2-10, 3.2-11, 3.2-12, current revision of S&L and 3.2-13 Classification Criteria for structures, systems, and components, per IDI commitment.
Page 3.6-2 Revised to eliminate the requirement for the postulation of leakage cracks in high energy piping.
Page 3.6-4 Editorial corrections.
Pages 3.6-8 and 3.6-9 Revised to eliminate the requirement for arbitrary intermediate breaks and revised to eliminate the requirement for the postulation of leakage cracks in high
{
energy piping.
1 ii iii i
ATTACHMENT A (Cont'd)
PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES l
Pages 3.6-11 and 3.6-lla Addition of new subsec-tions to 1) state 24 rule for classifying high energy piping as moderate energy piping, 2) eliminate the requirement for the postulation of leakage cracks inside containment.
Page 3.6-12 Revised to eliminate the require-ment for the postulation of leakage cracks in high energy piping.
Figures 3.6-1 through 3.6-12a Revised to reflect current designation of high energy lines.
Page A3.6-4 and Figures Postulated high energy A3.6-15, A3.6-16, and line break in PD charging A3.6-17 pump room resulting in peak transient differential
,m pressure of 2.42 psid has I
1 been eliminated.
Remaining postulated HELB (charg ing pump discharge break) does not result in significant pressurization.
Pages 3.7-19 and 3.7-19a Revised to reflect Sargent
& Lundy's procedure used for modeling pipe supports as infinitely rigid elements per IDI commitment.
Page 3.7-20 Revised to clarifiy design responsibilities for piping analysis in Byron /Braidwood Units 1 and 2 per IDI commitment.
Page 3.7-27 Editorial correction of ASME Code subsection designation for buried SX piping.
n s_-
2
ATTACHMENT A (Cont'd)
- .s
(
)
PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES Ns/
Pages 3.8-20, 3.8-22, and 3.8-23 Revisions made to clarify discussion of penetration analysis.
Page 3.8-29 Clarification of discussion on concrete compressive stress-strain relationship.
This is consistent with ACI-318.
Page 3.8-37 Correction of Braidwood lake screen house foundation dimension and glacial till elevation.
Created separate Byron and Braidwood pages.
Page 3.8-47 Addition of statement regarding visual weld inspection requirements.
(
Reference:
letter from K.
A. Ainger to H.
R.
Denton, dated 07-25-85.)
t
Page 3.8-65 Revision made to clarify
(~)s discussion of penetration
- analysis, i
Figures 3.8-44 (Byron),
Editorial corrections.
3.8-45 (Braidwood), and 3.8-54 Pages 3.9-17, 3.9-17a, 3.9-44 Revision to subsection through 3.9-46, 3.9-91, 3.9-98 3.9.3 cor.cerning NF code 3.9-100, 3.9-100a, 3.9-101, boundary definitions resulting and 3.9-101a from meeting between Common-wealth Edison, Sargent & Lundy, and NRC on 04-09-85 (
Reference:
letter from D.
H. Smith to H.
R.
Denton, dated 01-14-86).
Other revisions are due to an IDR commit-ment to clarify discussion of piping analysis.
Pages 3.9-103 and 3.9-104 Corrected to add diesel oil transfer pumps and control room chilled water pumps to list of active pumps.
3
ATTACHMENT A (Cont'd)
PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES t
i
\\'
Page 3.9-107 Corrected to add valves 1RY8010A through 1RY8010C.
These are the pressurizer safety valves.
Pages 3.10-6 and 3.10-6a Addition of statement regarding visual weld inspection requirements.
(
Reference:
letter from K. A.
Ainger to H.
R.
- Denton, dated 07-25-85).
Pages 3.10-7 and 3.10-8 Added discussion of allow-cble slenderness ratios for compression members (see also revised Appendix D).
Page 3.11-1 Editorial revisions:
Separate Byron (blue) and Braidwood (ivory) pages provided to reflect difference in design of Byron and Braidwood control room HVAC systems.
- )
Page 3.11-14 Normal relative humidity limits for environmental Zones Al, A2, and A2a revised to a range of 20%-60% RH.
This range is acceptable for human comfort per ASHRAE 55-74 and for equipment qualification.
Revision of normal temperature for Zone A2 is also acceptable for equipment qualification.
Page 3.11-15 New environmental Zone A5a created to reflect fact that lower cable spreading room has been deleted from control room HVAC pressure boundary.
Page 3.11-18 Accident pressure for Zones A13f and A139 revised.
The HELD postulated in these zones, resulting in peak transient differential pressure of 2.42 psid,
)
has been eliminated.
4
ATTACHMENT A (Cont'd)
)
PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES LJ Pages 5.3-4, 5.3-15, 5.3-25, Added subsection 5.3.1.5.1 5.3-26, 5.3-27, and 5.3-28 addressing pressurized thermal shock evaluation
(
Reference:
letter from G.
L. Alexander to H.
R.
Denton dated 01-17-86).
Page 6.1-8 Revised description of ECCS and CS operation to be consistent with Sections 6.3 and 6.5.
Page 6.2-175 Editorial correction of hydrogen monitoring pene-tration numbers.
Page 6.3-35 Revised to include valves CV8105 and CV8106 which must close in 10 seconds or less.
These valves isolate normal charging path.
g Pages 6.4-2, 6.4-3, 6.4-5, Changes reflect current
_ (~ )
6.4-Sa, and 6.4-6 control room HVAC system design.
(
Reference:
letter from T.
R.
Tramm to H.
R.
Denton, dated 01-28-85).
Pages 6.4-8 and 6.4-8a Revision of control room habitability analysis based on final approved data.
Figure 6.4-1 Revised to reflect deletion of lower cable spreading room from control room HVAC pressure boundary.
Figures 6.4-5, 6.4-6, and Revised to reflect current 6.4-7 design of control room HVAC system.
Pages 6.5-9, 6.5-10, 6.5-12, HVAC system description and 6.5-14 changes to reflect current design.
5
ATTACHMENT A (Cont'd)
PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES V
Page 6.5-20 Revised to state that empty (not low-low) RWST level alarm annunciates for termination of contain-ment spray injection phase.
This is consistent with response to Q22.25.
Page 7.2-27 Corrected item f to reflect design of general warning reactor trip subsystem; Page also contains an editorial correction.
Figure 7.2-1 Updated functional diagrams to reflect current design.
Pages 7.3-25 and 7.3-29 HVAC system descriptions revised to reflect current design.
Pages 7.3-61 and 7.3-(2 Changes made at request of NRC to reflect current
~}
design of ESF instrumentation /
,/
interlocks.
s Page 7.7-21a Revised since C-16 inter-lock is not currently used to stop turbine loading.
This is consistent with page 7.7-26 and Figure 7.2-1, Sheet 16.
Page 8.1-14 Addition of IEEE 420-1973 conformance discussion
(
Reference:
Letter from T.
R.
Tramm to H.
R.
- Denton, dated 02-06-85).
Page 8.1-15 Editorial revision.
Pages 8.2-3, 8.2-5, 8.2-6, Revision of electrical 8.2-7, 8.2-8, and 8.2-9, distribution system descrip-Figures 8.2-5, 8.2-6, and 8.2-7 tion to reflect currently planned transmission system and results of latest stability studies.
Page 8.3-10 Revised to resolve Braidwood I \\
CAT item.
6
ATTACHMENT A (Cont'd) h PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES Pages 8.3-17, 8.3-18, Revised per NRC request and 8.3-18a to address CAT inspection item on lesser electrical separation criteria (
References:
letter from A.
D. Miosi to H. R. Denton, dated 04-22-86, and Supplemental SER, dated 2-25-86).
Pages 8.3-28, 8.3-28a, 8.3-29, Revised to show correct and 8.3-29a brake horsepower for HVAC fans and also to indicate that turbine bearing oil pump (powered from Class lE switchgear) is tripped on SI signal concurrent with LOEP.
Page 8.3-32 Table of DG supervisory and protective functions revised to reflect current design.
A
(
)
Page 9.2-60 Revision reflects deletion of CC cooling coils in primary shield and effects of containment isolation after a LOCA.
Pages 9.4-1, 9.4-2, 9.4-3, Revised descriptions for 9.4-4, S.4-6, 9.4-9, 9.4-10, various HVAC systems to 9.4-12, 9.4-15, 9.4-15a, reflect current design 9.4-15b, 9.4-17, 9.4-22, and to reflect differences 9.4-25, 9.4-29, 9.4-30, 9.4-30a, between Byron and Braidwood 9.4-32, 9.4-33, 9.4-36, 9.4-37, designs.
(For control room 9.4-52, 9.4-60, 9.4-63, 9.4-64, HVAC system modification, 9.4-65, 9.4-66, 9.4-68, 9.4-73, reference letter from 9.4-76, 9.4-82, 9.4-84b, T.
R.
Tramm to H.
R.
- Denton, 9.4-84c, 9.4-84d, 9.4-97, dated 01-28-85.
For 9.4-109, 9.4-119, 9.4-128, revision to page 9.4-97, and 9.4-128a see letter from T.R. Tramm to H.
R. Denton dated, 01-09-85.)
Page 9.5-1 Revised to reflect design of plant communicat' ns system:
" code call" changed to " portable pager".
7
ATTACHMENT A (Cont'd)
(/
PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES Pages 10.3-2a, 10.3-2c, and MSIV control circuits 10.3-10 revised so that solenoids "A"
and "Al" will remain continuously energized during a maintained valve closure signal.
Page 10.4-7 Revised to reflect approximate (Braidwood) temperature rise of 21' F (instead of 17' F) through the condenser at 100%
load.
Pages 10.4-14 and 11.2-6 Revised to clarify normal operating range for steam generator blowdown rate.
Page 10.4-19 Revised to be consistent with current design.
Pages 11.3-12 and 11.3-13 Table revised to give correct alarm and control setpoints for gaseous f) waste processing system x/
instrumentation.
Page 11.3-28 Revised to show reduced laboratory system exhaust airflow to B/B Unit 1 auxiliary building exhaust stack.
Pages ll.5-17a and 13.1-10 Correction of editorial errors from Amendment 46.
Page 12.3-67 Corrected elevation of containment high range radiation monitors to be consistent with Appendix E.30.
Page 13.3-11 Revised to be consistent with the generic Generating Station Emergency Plan (GSEP)
Pages 13A-11a and 13A-27a Updated resumes for (Braidwood)
P.
G. Cretens and W. E. McGee
(
Reference:
letter from Ot D.
H.
Smith to H.
R.
Denton dated 02-26-85).
8
ATTACHMENT A (Cont'd)
PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES Pages 14.2-3 and 14.2-10 Revised description of startup program (
Reference:
letter from K. Ainger to H.
R.
Denton, dated 10-07-85).
Pages 14.2-18 and 14.2-23 Revised test summaries for preop tests on reactor protection and auxiliary power system.
Page 14.2-36 Radioactive waste gas test table revised per response to Q423.44 (
Reference:
letter from T.
R.
Tramm to H.
R.
Denton, dated 02-11-85).
Pages 14.2-37 and 14.2-37a Diesel generator preop test table revised per response to 0423.45 (
Reference:
letter from A.
D. Miosi to H.
R. Denton, dated O
07-09-85).
Page 14.2-90 Control rod reactivity worth measurement startup, test table revised (
Reference:
letter from K. A. Ainger to J.
G. Keppler, dated 09-16-85).
Page 14.2-91 Clarification made at the request of NRC Region III.
Page 14.2-94 Power reactivity coefficient measurement startup test revised (
Reference:
letter from T.
R.
Tramm to H.
R. Denton dated 01-31-85).
Page 14.2-97 Full power plant trip test table revised per response to 0423.48 (
Reference:
letter from T.
R.
Tramm to H.
R.
Denton, dated 02-11-85).
O 9
ATTACHMENT A (Cont'd)
PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES
\\- /
-Page 14.2-103 Turbine trip startup test table revised per response to Q423.44 (
Reference:
letter from T.
R. Trama to H.
R.
Denton, dated 0 85).
2 Pages 15.0-30 and 15.0-31 Minor correction of core inlet and vessel average temperature values used in accident analyses.
Page 15.0-41 Correction of editorial error from Amendment 46.
Page 15.3-15 and Revised due to reanalysis Figures 15.3-9, 15.3-10 of loss of flow accident 15.3-11, and 15.3-12 based on Byron Unit 1 as-built reactor coolant pump performance data.
4
(
Reference:
letter from T.
R.
Tramm to H.
R. Denton, dated 03-08-85.
r~
Page A1.29-1 Revised to reference Subsection
' ( }j 3.2.1 instead of 3.9.2.7.
Pages A1.52-1, A1.52-2, Revised Regulatory Guide A1.52-3, and A1.52-4 1.52 response per meeting with NRC in October 1984
(
Reference:
Letter from T.
R.
Tramm to H.
R.
- Denton, dated 10-18-84).
Pages Al.68-2 and A1.68-3 Revised response to Regulatory Guide 1.68 (
References:
letter from T.
R. Tramm to H.
R.
Denton, dattd i
02-11-85 and letter from K.
A. Ainger to H. R.
Denton, dated 05-29-85).
(Note:
Response to Appendix A.S.ff not sent previously to NRC.)
Pages A1.84-1 and A1.84-2 Code cases N-340, N-403, N-411, and N-413 added to Regulatory Guide 1.84 l
response (References i
letters from B. J. Youngblood to D.
L.
Farrar, dated 4
-)
05-03-83, 07-18-85, and
(
08-23-85).
10
ATTACHMENT A (Cont'd) f'T PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES V
Page A1.106-1 Revised response to Regulatory Guide 1.108 en diesel generator testing (
Reference:
letter from A.
D. Miosi to H.
R.
- Denton, dated 07-09-85).
Page A1.140-1, A1.140-2, Revised response to Regulatory and A1.140-3 Guide 1.140 per meeting with NRC in October 1984
(
Reference:
Letter from T.
R. Tramm to H.
R. Denton, dated 10-18-8 4).
Page B.4-1 Clarification of structural steel bolted connection design.
Pages D.0-1, D.8-1, D.8-3, Revised as a result of D.8-4, D.8-5, D.8-6, and an IDR commitment to clarify D.8-7 piping design responsibilities.
Pages D.ll-1 and D.T-45 Revised to address allowable slenderness ratios for compression members.
-~
Page E.7-1 and Onsite Safety Group Functions Figure E.7-1 changed to reflect NUREG-0737 requirements per INPO recommendations.
Page E.19-1 Revised to reflect current design of reactor coolant system vents.
Pages E.20-1 and E.20-la Revised to specify that the liquid source term used for shielding evaluation and EQ does not include noble gases (
Reference:
letter from T.
R. Tramm to H.
R.
Denton, dated 02-06-85).
Page E.21-3 Revised to address backup sampling capability for chlorides and hydrogen
(
Reference:
Letter from T.
R. Tramm to H.
R.
- Denton, dated 02-06-85).
11
ATTACHMENT A (Con t ' d )
PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES Pages E.30-la, E.30-lb, Editorial correction on and E.30-8 page E.30-la.
Also, revised to provide information regarding design basis for shielding associated with iodine sampling of vent stack effluent following a LOCA (References letter from T.
R. Trama to H.
R.
Denton, dated 09-26-84, and letter from D.
H.
Smith to H.
R. Denton, dated 10-24-84).
Page E.66-1 Corrected start time for SX and CC pumps following loss of offsite power.
Pages E.69-1 and E.70-1 Revised responses to NUREG-0737 on small brer' LOCA evaluation (Refert ces letter from B. J.
Youngblood to D.
L.
Farrar, dated 05-24-85).
()
Pages E.75-18, E.75-19, Revised to reflect current E.75-20, and E.75-21 design of non-safety-related TSC HVAC system.
Page E.82-1 Added reference to equipment qualification report (Referencer letter from T.
R.
Tramm to H.
R.
Denton, dated 02-06-85).
Page Q10.64-1 Revised completion date for Byron-2 aafe shutdown analysis.
Page Q40.2-1 Response to Q40.2 revised to state that it has been super-seded by response to Q270.3.
Page Q40.4-1 Revised to reflect results of latest stability studies for electrical transmission system.
12
ATTACHMENT A (Cont'd)
(' ' '
PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES Page Q40.12-1 Created separate Byron and Braidwood pages due to addition of Braidwood specific Valves SX165A and SX165B Page Q40.17-1 Revised to indicate that No. 1 and No. 2 diesel fuel oil is purchased per ASTM Standard D975-81.
This is consistent with the Tech Specs.
Figures Q40.40-1 Revised to reflect currently and 040.40-2 planned electrical trans-mission system.
Page Q40.53-1 Revised to reflect results of latest stability studies for electrical transmission system.
O Pages Q40.96-1 and 040.96-2 Revised to reflect current design for emergency lighting.
Page Q121.2 Revised to reflect use ot Code Case N-401, as allowed by Regulatory Guide 1.147, for steam generator tubing inspection.
Page 0270.3-1 Editorial revision.
Pages Q311.14-2 (Braidwood)
Edit.or':al correction.
and Q311.15-1 (Byron)
Pages Q321.75-1, 0321.87-1, New and revised responses Q321.100-1, 0321.100-2, to questions on the volume Q321.101-1, 0321.102-1, reduction system (
References:
Q321.103-1, 0321.104-1, letters from T.
R. Tramm Q321.104-2, 0321.104-3, to H.
R.
Denton, dated Q321.105-1, Q321.106-1, 01-09-85, 01-17-85, and Q321.106-2, Q321.107-1, 02-06-85).
Q321.108-1, 0321.109-1, Q321.110-1, 0321.111-1, 0321.112-1, and 0321.113-1 pd 13
ATTACHMENT A (Cont'd)
('
s PAGE OR FIGURE NUMBER DESCRIPTIONS OF CHANGES Pages Q362.1-2, Q362.1-2a, Revised response to question Q362.1-3, Q362.1-4, and on settlement monitoring.
Figures Q362.1-20 through Also, time settlement Q362.1-33 (Braidwood) plots have been updated.
Pages Q420.1-1, Q420.1-2, Response to question on and Q420.1-3, and Figure SPDS (References letter Q420.1-1 from K. A. Ainger to H.
R.
Denton, dated 08-20-85).
Page Q423.25-1 Revised response to question on startup program (
Reference:
letter from K. A. Ainger to H.
R.
Denton, dated 10-07-85).
Pages 0423.44-1, C423.44-2, Responses to questions Q423.45-1, Q423.46-1, on test program (
Reference:
Q423.47-1, and Q423.48-1 letter from T.
R.
Tramm to 11.
R.
Denton, dated 02-11-85).
Page 0423.49-1 (Braidwood)
Response to question on
!.,/~N)
(previously numbered 0420.24-1) project startup organization
(
Reference:
letter from D.
H.
Smith to H.
R.
- Denton, dated 10-15-84).
Page 0600.1-1 Response to question on conformance to 10CFR50 Appendix R and BTP CMEB 9.5-1.
Pages 0620.1-1, 0620.1-2, Responses to questions Q620.2-1, Q620.3-1, 0640.1-1, on SPDS (
Reference:
letter 0640.1-2, 0640.1-3, Q640.1-4, from K. A.
Ainger to H.
R.
0640.2-1, and Q640.3-1 Denton, dated 08-20-85).
l 14 l
ATTACHMENT B DIFFERENCES BETWEEN FSAR REVISIONS TRANSMITTED TO NRC FOR ADVANCE REVIEW AND AMENDMENT 47 TRANSMITTAL PAGES LETTER DATE DIFFERENCEr 9.4-97 01-09-85 For iten 2, total prersure revised to 13.6 inches of water.
14.2-3 and 14.2-10 01-09-85 Last paragraph under and 14.2.5 and third to 10-07-85 last paragraph under 14.2.6 revised to change Station Superintendent to Station M1 nager and to delete reference to Table 14.2-92.
14.2-37 and 14.2-37a 07-09-85 Editorial changes.
A1.52-1, A1.52-2, 10-18-84 Last sentence on page and A1.52-3 A1.52-l revised.
Item O
2.1 revised to delete edition date of ANSI N509 in statements concerning leak testing.
A1.68-2 and A1.68-3 02-11-85 Editorial corrections.
and 05-29-85 A1.140-1 and A1.140-2 10-18-85 Revised paragraph under items 2f and 3f -Filter Housings.
Under item 2f and 3f - Ductwork, revised first, second and third paragraphs, and item 5.
Last para-graph on A1.140-? has editorial correct 8on.
Q321.100-1 02-06-85 lith line of 3rd patograph revised.
Also editorial revision in 2nd paragraph, 6th line.
Q321.101-1 01-09-85 First sentence revised to add year of letter.
1 I
ATTACHMENT B (Cont'd)
/
T TRANSMITTAL
\\.- /
PAGES LETTER DATE DIFFERENCES Q321.104-1, 01-17-85 Entire response has been Q321.104-2, and reworked, although auch Q321.104-3 of the information has not changed.
Q321.106-1 01-09-85 Sentence added to end of Item 1 to reflect commitment in letter from T.
R. Trama to H.
R.
Denton, dated 02-05-85.
Q420.01 08-20-85 R0 vised to delete diagram showing isolation between H'TU/CET monitoring I
system and non-safety-related SPDS processing.
Q423.25-1 01-09-85 Response to second and item revised to change 10-07-85 Station Superintendent to Station Manager and to delete reference to Table 14.2-92.
\\s Q423.49-1 10-15-84 This QAB question was previously numbered 420.24, however, the 420 series designation is used by the ICSB.
Therefore, this question was added to the 423 series (QAB).
Q620.1-1 08-20-85 Second sentence of 4th paragraph revised.
Q640.1-3 08-20-85 First sentence of 2nd paragraph of item b revised.
OV 2
B/B-FSA R AENDfENT 47 APRIL 1986 BYRON /BRAIDWOOD STATIONS INSTRUCTIONS FOR UPDATING YOUR FSAR Changes to the FSAR are identified by a vertical line in the right margin of the page.
To update your copy of the B/B FSAR-remove and destroy the following pages and figures and insert pages and figures as indicated.
REMOVE IN SE RT VOLUME 1 yhapter 3.0 Bahind Tab. 3.0 Page 3.0-vi Page 3.0-vi Page 3.0-xiii Page 3.0-xiii Pages 3.0-xv and 3.0-xvi Pages 3.0-xv and 3.0-xvi Pages 3.0-xxi and 3.0-xxii Pages 3.0-xxi and 3.0-xxii Page 3.0-xxv Page 3.0-xxv (k-)
Behind_ Tab 3.2 Pages 3.2-1 and 3.2-2 Pages 3.2-1 through 3.2-2a Page 3.2-4 Page 3.2-4 Pages 3.2-7 and 3.2-8 Pages 3.2-7 and 3.2-8 Pages 3.2-10 through 3.2-13 Pages 3.2-10 through 3.2-13 Behind Tab 3.6 Page 3.6-2 Page 3.6-2 Page 3.6-4 Page 3.6-4 Page 3.6-6a Pages 3.6-8 through 3.6-9a Pages 3.6-8 and 3.6-9 Page 3.6-11 Pages 3.6-11 and 3.6-11a Page 3.6-12 Page 3.6-12 Figure 3.6-1 (2 Sheets)
Figure 3.6-1 (2 Sheets)
Figure 3.6-2 Figure 3.6-2 (4 Sheets)
Figure 3.6-3 Figure 3.6-3 Figure 3.6-4 (2 Sheets)
Figure 3.6-4 (2 Sheets)
Figure 3.6-5 (6 Sheets Figure 3.6-5 (6 Sheets)
Figure 3.6-6 Figure 3.6-6 (3 Sheets)
Figure 3.6-7 (4 Sheets)
Figure 3.6-7 (5 Sheets)
Figure 3.6-8 Figure 3.6-8 Figure 3.6-9 (5 Sheets)
Figure 3.6-9 (5 Sheets)
(~')
Figure 3.6-10 Figure 3.6-10 V
1
B/D-FSAR AENDENT 47 APRIL 1986 Q}
(
REMOVE INSE RT Figure 3.6-11 (5 Sheets)
Figure 3.6-11 (6 Sheets)
~
Figure 3.6-12 (3 Sheets)
Figure 3.6-12 (3 Sheets),
and Figure 3.6-12a (3 Sheets)
Behind Tab A3.6 Page A3.6-4 Page A3.6-4 Figures A3.6-15 through A3.6-17 Sheets for Figures A3.6-15 through A3.6-17 Behind Tab 3.7 Pages 3.7-19 and 3.7-19a Pages 3.7-19 and 3.7-19a Page 3.7-20 Pages 3.7-20 (Byron) and 3.7-20 (Braidwood)
Page 3.7-27 Page 3.7-27 VOLUME 2 (Byron)
Behind Tab 2.5 Page 2.5-85 Page 2.5-85
\\~
VOLUME 4 (Byron)
Behind Tab 2.5D Figures 2.5D-46 and 2.5D-47 Figures 2.5D-46 and 2.5D-47 VOLUME 5 (Braidwood)
Behind Tab 2.3 Page 2.3-9 Page 2.3-9 Behind Tab 2.5 Page 2.5-89 Page 2.5-89 Page 2.5-173 Page 2.5-173 i
VOLUME 7 Behind Tab 3.8 O
Page 3.8-20 Page 3.8-20 Pages 3.8-22 and 3.8-23 Pages 3.8-22 and 3.8-23 i
2 l
2
r l
B/B-FSA R AENDElff 47 APRIL 1986 t 's.
(
)
EMOVE INSE RT Page 3.8-29 Page 3.8-29 Page 3.8-37 Pages 3.8-37 (Byron) and 3.8-37 (Braidwood)
Page 3.8-47 Page 3.8-47 Page 3.8-65 Page 3.8-65 Figures 3.8-44 and 3.8-45 Figures 3.8-44 (Byron) and 3.8-45 (Braidwood)
Figure 3.8-54 Figure 3.8-54 Behind Tab 3.9 Pages 3.9-17 and 3.9-17a Pages 3.9-17, 3.9-17a (Byron),
and 3.9-17a (B raidwood)
Page 3.9-44 through 3.9-46b Pages 3.9-44, 3.9-44a, 3.9-44b, 3.9-44c, 3. 9-4 5 and 3. 9-4 6 Page 3.9-91 Page 3.9-91 Page 3.9-98 Page 3.9-98 Page 3.9-100 Page 3.9-100 i
Page 3.9-100a Page 3.9-100a l
Page 3.9-101 Page 3.9-101 Page 3.9-101a Page 3.9-101a Pages 3.9-103 and 3.9-104 Pages 3.fs-103 and 3.9-104 Page 3.9-107 Page 3.0-107 Behind Tab 3.10 Pages 3.10-6 through 3.10-8 Pages 3.10-6, 3.10-6a, 3.10-7 and l
3.10-8 Behind Tab 3.11 l
Page 3.11-1 Pages 3.11-1 (Byron) and 3.11-1 (Braidwood)
Pages 3.11-14 and 3.11-15 Pages 3.11-14 and 3.11-15 l
Page 3.11-18 Page 3.11-18 l
VOLUME 8 Behind Tab 5.0 Page 5.0-11 Page 5.0-41 l
Pages 5.0-vi and 5.0-vil Pages 5.0-vi and 5.0-vii l
l Behind Tab 5.3 Page 5.3-4 Page 5. 3-4
/~
Page 5.3-15 Page 5.3-15
(_j}
After Page 5.3-24 Pages 5. 3-25 through 5. 3-28 3
l l
t
D/D-FSAR AMENDENT 47 APRIL 1986
/~N U
REMOVE _
INSE RT Behind Tab 6.1 Page 6.1-8 Page 6.1-8 Behind Tab 6.2 Page 6.2-175 Page 6.2-175 Behind Tab 6.3 Page 6.3-35 Page 6.3-35 Behind Tab 6.4 Pages 6.4-2 (Byron) and Pages 6.4-2 (Byron) and 6.4-2 (Braidwood) 6.4-2 (Braidwood)
Pages 6.4-3 (Byron) and Pages 6.4-3 (Byron) and 6.4-3 (Braidwood) 6.4-3 (Braidwood)
Pages 6.4-5 and 6.4-6 Pages 6.4-5, 6.4-Sa, and 6.4-6 Page 6.4-8 Pages 6.4-8 and 6.4-8a Figure 6.4-1 (3 Sheets)
Figure 6.4-1 (2 Sheats) fs Figures 6.4-5 through 6.4-7 Figures 6.4-5 through 6.4-7
\\-
Behind Tab 6.5 Pages 6.5-9 and 6.5-10 Pages 6.5-9 (Byron), 6.5-9 (Braidwood, 6.5-10 (Byron) and 6.5-10 (Braidwood)
Page 6.5-12 Page 6.5-12 Page 6.5-14 Page 6.5-14 Page 6.5-20 Page 6.5-20 VOLUME 9 Behind Tab 7.0 Page 7.0-xi Page 7.0-xi Behind Tab 7.2 Page 7.2-27 Page 7.2-27 Figure 7.2-1 (17 Sheets)
Figure 7.2-1 (18 Sheets)
Behind Tab 7.3 Page 7.3-25 Page 7.3-25
{/j Page 7.3-29 Page 7.3-29 s_
Pages 7.3-61 and 7.3-62 Pagea 7.3-61 and 7.3-62 4
B/B-FSA R APENDMENT 47 APRIL 1986
(
IEMOVE INSE RT
\\ s;
~
Behind Tab 7.7 Page 7.7-21a Page 7.7-21a Behind Tab 8.0 Page 8.0-11 Page 8.0-11 Behind Tab 8.1 Pages 8.1-14 and 8.1-15 Pages 8.1-14 and 8.1-15 Behind Tab 8.2 Page 8.2-3 Page 8.2-3 Pages 8.2-5 through 8.2-8 Pages 8.2-5 through 8.2-9 Figures 8.2-5 through 8.2-7 Figures 8.2-5 through 8.2-7 Behind Tab 8.3 Page 8.3-10 Page 8.3-10 Pages 8.3-17 and 8.3-18 Pages 8.3-17, 8.3-18, and 8.3-18a Pages 8.3-20, 8.3-28a, 8.3-29, Pages 8.3-28, 8.3-28a, 8.3-29,
(^^
and 8.3-29a and 8.3-29a
(
Page 8.3-32 Page 8.3-32 VOLUME 10 Behind Tab 9.0 Pages 9.0-vi and 9.0-vil Pages 9.0-vi and 9.0-vil Behind Tab 9.2 Page 9.2-60 Page 9. 2-60 Behind Tab 9.4 Page 9.4-1 (Byron)
Page 9.4-1 (Byron)
Page 9.4-1 (Braidwood)
Page 9.4-1 (Braidwood)
Page 9.4-2 (Byron)
Page 9.4-2 (Byron)
Page 9.4-2 (B r aidwood)
Page 9.4-2 (Braidwood)
Page 9.4-3 Page 9.4-3 Page 9.4-4 (Byron)
Page 9.4-4 (Byron) i Page 9.4-4 (Braidwood)
Page 9.4-4 (Braidwood)
Page 9.4-6 (Byron)
Page 9.4-6 (Byron)
Page 9.4-6 (Braidwood)
Page 9.4-6 (Braidwood)
Pages 9.4-9 and 9.4-10 Pages 9.4-9, 9.4-10 (Byron) and g-)
9.4-10 (Braidwood)
(j 5
D/C-FSAR AMENDfENT 47 APRIL 1986
(~V)
REMOVE INSE RT
/
Page 9.4-12 Page 9.4-12 Pages 9.4-15 through 9.4-15b Pages 9.4-15 through 9.4-15b Page 9.4-17 Pages 9.4-17 (Byron) und 9.4-17 (B raidwood)
Page 9.4-22 Page 9.4-22 Page 9.4-25 Page 9.4-25 Pages 9.4-29 and 9.4-30 Pages 9.4-29, 9.4-30, and 9.4-30a Pages 9.4-32 and 9.4-33 Pages 9.4-32 and 9.4-33 Pages 9.4-36 and 9.4-37 Pages 9.4-36 and 9.4-37 Page 9.4-52 Pages 9.4-52 (Byron) and 9.4-52 (Braidwood)
Page 9.4-60 Page 9.4-60 Pages 9.4-63 and 9.4-64 Pages 9.4-63 and 9.4-64 Page 9.4-65 Pages 9.4-65 (Byron) and 9.4-65 (Braidwood)
Page 9.4-66 Pages 9.4-66 (Byron) and 9.4-66 (Braidwood)
Page 9.4-68 Pages 9.4-68 Page 9.4-73 Page 9.4-73 Page 9.4-76 Page 9.4-76 Page 9.4-82 Page 9.4-82 Pages 9.4-84b and 9.4-84c Pages 9.4-84b through 9.4-84d Page 9.4-97 Page 9.4-97
(')
Page 9.4-109 Page 9.4-109 i
\\_/
Page 9.4-119 Page 9.4-119 Page 9.4-128 Pages 9.4-128 (Byron), 9.4-128 (Braidwood) and 9.4-128a (B raidw ood)
Behind Tab 9.5 Page 9.5-1 Page 9.5-1 VOLUME 11 Behind Tab 10.0 Page 10.0-1 Page 10.0-1 Behind Tab 10.3 Page 10.3-23 Page 10.3-2a Page 10.3-2c Page 10.3-2c Page 10.3-10 Page 10.3-10 Behind Tab 10.4 Page 10.4-7 Page 10.4-7 6
B/B-FSAR AM NDfERNT 47 APRIL 1986
- D-
\\j REMOVE INEERT Page 10.4-14 Page 10.4-14 Page 10.4-19 Page 10.4-19 Behind Tab 11.2 Page 11.2-6 Page 11.2-6 Behind Tsb 11.3 Pages 11.3-12 and 11.3-13 Pages 11.3-12 and 11.3-13 Page 11.3-28 Page 11.3-28 L
Behind Tab 11.5 Page ll.5-17a Page ll.5-17a Behind Tab 12.3 Page 12.3-67 Page 12.3-67 l
vpLUME 12
()
Behind Tab 13.1 Page 13.1-10 Page 13.1-10 Behind Tab 13.3 Page 13.3-11 Page 13.3-11 Behind Tab 13A Page 13A-lla Page 13A-11a Page 13A-27a Page 13A-27a Behind Tab 14.0 l
l Pages 14.0-11 through 14.0-iv Pages 14.0-11 through 14.0-iv Behind Tab 14.2
(
Page 14.2-3 Page 14.2-3 Page 14.2-10 Page 14.2-10
(
Page 14.2-18 Page 14.2-18 l
Page 14.2-23 Page 14.2-23 l
Pages 14.2-36 and 14.2-37 Pagen 14.2-36 through 14.2-37a l
Pages 14.2-90 and 14.2-91 Pages 14.2-90 and 14.2-91 Page 14.2-94 Page 14.2-94 i
7 i
7 D/D-FSAR AMt'ZDDENT 47 APRIL 1986
/
REMOVE INSE RT Page 14.2-97 Page 14.2-97 Page 14.2-103 Page 14.2-103 Behind Tab 15.0 Pages 15.0-30 and 15.0-31 Pages 15.0-30 and 15.0-31 Page 15.0-41 Page 15.0-41 Behind Tab 15.3 Page 15.3-15 Page 15.3-15 Figures 15.3-9 through 15.3-12 Figures 15.3-9 through 15.3-12 VOLUME 13 Behind Tab Al Page A1.29-1 Page A1.29-1 Pages A1.52-1 through A1.52-3 Page A1.52-1 throagh A1.52-4 Pages A1.68-2 and A1.68-3 Pages A1.68-2 and A1.68-3 Page A1.84-1 Pages A1.84-1 and A1.84-2 Page A1.108-1 Page A1.108-1
/\\
Pages A1.140-1 and A1.140-2 Pages A1.140-1 through A1.140-3 O
Behind Tab B.4 Page B.4-1 Page B.4-1 VOLUME 14 Behind Tab Append!.x D Page D.0-1 Page D.0-1 Behind Tab D.0 Page D.0-1 Page D.0-1 Behind Tab D.8 Page D.8 Page D.8-1 After page D.8-2 Pages D.8-3 through D.8-7 Behind Tab D.ll Page D.ll-1 Page D.ll-1 After page D.T-44 Page D.T-45 m
8
F S/B-FSA R AENDENT 47 APRIL 1986
/m
( )
REMOVE INSE RT Behind Tab Appendix E Pages E.7-1 and E.7-2 Page E.7-1 Figure E.7-1 Figure E.7-1 Page E.19-1 Page E.19-1 Page E.20-1 Pages E.20-1 and E.20-la Page E. 21-3 Page E.21-3 Pages E.30-la and E.30-lb Pages E.30-la and E.30-lb After page E.30-7 Page E.30-8 Page E.66-1 Page E.66-1 Pages E.69-1 and E.70-1 Page E.69-1 and E.70-1 Pages E.75-18 through E.75-21 Pages E.75-18 through E.75-21 Page E.82-1 Page E.82-1 VOLUME RESPONSES TO NRC QUE STION Behind Tab Q10 Series Page Q10.64-1 Page Q10.64-1 Behind Tab 040 Series f~}
Page Q40.2-1 Page Q40.2-1
\\_/
Page Q40.4-1 Page Q40.4-1 Page Q40.12-1 Pages Q40.12-1 (Byron) and Q40.12-1 (Braidwood)
Page Q40.17-1 Page Q40.17-1 Pages Q40.40-2 and Q40.40-3 Pages Q40.40-2 and Q40.40-3 Page Q40.53-1 Page Q40.53-1 Pages Q40.96-1 and Q40.96-2 Pages Q40.96-1 and Q40.96-2 VOLUME RE SPONSE S TO NRC QUE STIONS PART 2 Behind Tab Q110 Series Page 0110.0-3 P1ge Q110.0-3 Behind Tab Q120 Series Page 0121.2-1 Page 0121.2-1 Behind Tab Q130 Serien Page 0130.0-1 Page Q130.0-1 Page Q130.0-3 Page 0130.0-3 a
9 l
B/B-FSAR AMENDMENT 47 APRIL 1986 r"%
j j REMOVE INSERT VOLUME RESPONSES TO NRC QUESTIONS PART 3 Behind Tab Q270 Series Page Q270.3-1 Page Q270.3-1 Behind Tab Q310 Series Page Q311.14-2 Page Q311.14-2 Page Q311.15-1 Page Q311.15-1 Behind Tab 0320 Series Page Q321.75-1 Page Q321.75-1 Page Q321.87-1 Page Q321.87-1 After page Q321.99-1 Pages 0321.100-1, Q321.100-2, 0321.101-1, Q321.102-1, 0321.103-1, Q321.104-1 through Q321.104-3, Q321.105-1, Q321.106-1, Q321.106-2, Q321.107-1, Q321.108-1, 0321.109-1, Q321.110-1, Q321.111-1, 0321.112-1, and O
0321.113-1 V
Behind 'iellow Tab Q360 Series Pages Q362.1-2 through 0362.1-4 Pages Q362.1-2, Q362.1-2a, Q362.1-3 and Q362.1-4 Pages Q362.1-27 through Q362.1-39 Pages Q362.1-27 through Q362.1-39 Behind Tab 0420 Series i
After page 0420.0-4 Pages Q420.1-1 through Q420.1-4 Page Q423.25-1 Page Q423.25-1 After page 0423.43-1 Pages Q423.44-1 and Q423.44-2, Q423.45-1, Q423.46-1, Q423.47-1, Q423.48-1, and Q423.49-1 Behind Tab 0600 Series Pages Q600.1-1, Q620.1-1, 0620.1-2, Q620.2-1, Q620.3-1, Q640.1-1 through Q640.1-4, 0640.2-1 and Q640.3-1 t-10