DUKE POWER GOMPAhT P.O. Box 33180 CHAMLOTTE, N.C. 28242 HALB. TUCKER TELEPHONE vuom raamment (704) 373-4533 noctuam encmeovion April 9,-1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. B. J. Youngblood, Project Director PWR Project Directorate No. 4 Re: Catawba Nuclear Station, Unit 1 Docket No. 50-413 Technical Specification Amendment For ESF Surveillance Extension
Dear Mr. Denton:
As a supplement to my February 12, 1986 and March 11, 1986 letters please find attached clarification to the Technical Specification change request for Specification 4.6.6.2.
This clarification is intended to show that only the Engineered Safety Features actuation portion of Surveillance 4.6.6.2 is to be extended until the first refueling outage.
Also, as a-result of discussions with members of your Staff, the amendment to Specification 4.5.3.1 is not needed.
Since Specifications 4.5.2 is referenced by Specifications 4.5.3.1, the amendment to 4.5.2e. is sufficient to cover the extension necessary to 4.5.3.1.
Very truly yours, y
Hal B. Tucker RWO: sib Attachment Dr. J. Nelson Grace, Regional Administrator xc:
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
[
o\\
NRC Resident Inspector Catawba Nuclear Station S \\
h A
P
CONTAINMENT SYSTEMS CONTAINMENT VALVE INJECTION WATER SYSTEM LIMITING CONDITION FOR OPERATION i
3.6.6 Seth trains of the Containment Valve Injection Water System shall be OPERA 8LE.
APPLICA8ILITY: MODES 1, 2, 3 and 4.
ACTION:
i With one train of the Containment Valve Injection Water System inoperable, restore the inoperable system to OPERA 8LE status within 7 days or be in at least H0T STAN08Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
\\
m l
SURVEILLANCE REQUIREMENTS l
4.6.6.1 Each train of the Containment Valve Injection Water System shall be l
demonstrated OPERA 8LE at least once per 31 days by verifying that the system is pressurized to greater than or equal to 1.10 P, (16.2 psig) and has ade-quate capacity to maintain system pressure for at least 30 days.
4.6.6.2 Each train of the Containment Valve Injection Water System shall be demonstrated OPERA 8LE at least once per 18 months by verifying that the valve seal injection flow rate is less than 1.7 gpe for Train A and 1.4 gpa for Train B with a tank pressure greater than or eoal to 45 psig and each auto-i matic valve in the flow path actuates to its correct position on a Containment Pressure-High or a Containment Pressure-High-Higa test signal.**
f"N wk.c.L assures b[each aldtmahe. Ydve to b'-
OW i
- ma sur,.m-fw not be W untu.
Sc4*N' b if 5 c""d prior to entering myr SENDopes h11-ia= the Vosdien on a C,rdainmenf
""I Pressure-kh oc A Con 44/nmed b5sure -W h-Ajh f
3 4est s.dnal" I
e
.y
.