e ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES
- j SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) i h
e t
N e
jgCK05000327 57 860402 >
DR P
,e e
m h-2 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L when the volume between the a
door seals ir 7,fffS54 Gcrru-ized to greater than or equal to 6 psigf fee-et 4f Q t
45deterAned bj ytecisica $ha; menwent'Ats When avasured ler at losf 2mkfes idd u,a+
s c :..* ~
~~
By conducting an overall air lock leakage test at not less than Pa b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has
.2 been performed on the air lock that could affect the air lock sealing capability.*
At least once per 6 months by verifying that only one door in each
~
c.
air lock can be opened at a time.
i O
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
(.
1 SEQUOYAH - UNIT 1 3/4 6-8
,o=
CONTAINMENT SYSTEMS
..3.,
SURVEILLANCE REOUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L* w6wm. the volume between the door seals #afre%rc; _crum:;d t; greater han or equal to 6 psig,('e-at QS deteriniud by frecisien fuc isteasuremtonts 4c:r: ? ? -bu~,
when uneasured lc.' at Itast 2 sninufeS Wih b.
By conducting an overall air lock leakage test at not less than Pa (12 psig) and by yerifying the overall air lock leakage rate is within its limit:
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 6 months by verifying that only one door in each k
0 air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8 n
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) e e
r i
e
~
m
(.k CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS i
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the at a,fffS5urep crre-ized to greater than or equal to 6 psigf ;r et f
door seals !!
as detenn*ned hj ytecision lk meawearnts
~~
whn twsaed he at Imt 2&nulu "Is u,a
,e
,:..+ ~
~
~
~~
By conducting an overall air lock leakage test at not less than P, b.
,g (12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
i
~
1.
At least once per six months, and j
2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock
- - 5 s'aling capability.*
~'
e At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
i Un The provisions of Specification 4.0.2 are not applicable.
J
- Exemption to Appendix "J" of 10 CFR 50.
\\..
l SEC'J0YAH - UNIT 1 3/4 6-8
,,c-,
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- .g.
4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L, h the volume between the door seals
[I[fhYb(d;; greater han or equal to 6 psig,4er.-44 42:n ' E
- =t--
as detehnIMd by frecision Skw rneAsurements
~
wisen uneasured (c.' at Itast 2 minuh'S tith b.
By conducting an overall air lock leakage test at not less than Pa within its limit:yerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 6 months by verifying that only one door in each A
air lock can be opened at a time.
41
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
i SEQUOYAH - UNIT 2 3/4 6-8 1
-en, r
n<-
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54)
M w
m
('
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L when the volume between the a
door seals f r ;ftes5Vecrre-f red to greater than or equal to 6 psigfh at a a>deterpslned bj ytecisica ll:w meawenents whn arassed he a lent 2rs ndes with
,-,a
,c
- -.. ~
~
~
~
By conducting an overall air lack leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is g
within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock s'ealing capability.*
At least once per 6 months by verifying that only one door in each
~
c.
air lock can be opened at a time.
U 4
The provisions of Specification 4.0.2 are not applicable.
f
- Exemption to Appendix "J" of 10 CFR 50.
'\\..
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- . y 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L h the volume between the door seals of a sve5rt-Crum:;d t; greater han or equal to 6 psig,4.es.-44 as deter 4nt b.ecision Ow inewements yf 1=c ? ? -Huty*
u;i,en meanted Sc.' at ItaSt 2 minufeS tith b.
By conoucting an overall air lock leakage test at not less than P a within its limit:jerifying the overall air lock leakage rate is (12 psig) and by -
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 5 months by verifying that only one door in each YA i
air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not aaplicable.
- Exemption to Appendix "J" of 10 CFR 50.
'i SEQUOYAH - UNIT 2 3/4 6-8
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) e 1
m
(. -C CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS
^~
t 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 4t afM55de door seals 1 7 zru-i:-d +a greater than or equal to 6 psigffr 3 a>detemlned hj pecisica lhw meawtMent$
when Msael ice at Imf 2mMes "Ith
.1
- +
sc~+~
i
~~
~
~
By conducting an overall air lock leakage test at not less than P a b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and 1
Prior to establishing CONTAINMENT INTEGRITY if opened when t
2.
CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
4 The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
\\.-
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS
. ~..
SURVEILLANCE REOUIREMENTS
- 9 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L h the volume between the door seals
$ d[f Y$$d = greater han or equal to 6 psig,4es-et
'--t'5
- =t as detertAu1ed by f.ecIsien (ku tr\\rAwrementi
~
u; hen uttrawred lc.' df Ste$f 2 minuttS (4th b.
By conducting an overall air lock leakage test at not less than P, wi.hin its limit:yerifying the overall -sir lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capacility."
c.
At least once per 6 months by verifying that only one door in each N
air lock can be opened at a time.
r.
- The provisions of Specification 4.0.2 are not aoplicable.
- Exemption to Appendix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8 e
I
(
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES l
SECUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) t O
)
e
l em CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS
-l i
\\
)
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal 1eakage less than or equal to 0.01 L, when the volume between the f
at affe5SVe: r-!:rd +o greater than or equal to 6 psigffr 3 door seals f 7 i
a>deterAned bj ytecisIcn lhw meewments when usurel he at Imt 2&as with
,-,-+sc
~^
~
~'
By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is g
within its limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRIT'( was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
4 The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
k..
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS
.m.
SURVEILLANCE REOUIREMENTS
- e -
4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L w*ns. the volume between the
'N[U!I$btogreater han or equal to 6 psig,4ea-at I
door seals 3 = t ? ?
' w-as dettft*It1ed by ftCISEen h tfirAfWementi 1
uthen unensuced lc.~ d hasf 2 minuhS talth b.
By concucting an overall air lock leakage test at not less than P, within its limit:gerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock i
sealing capability.*
l c.
At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50, 4
I l
1 SEQUOYAH - UNIT 2 3/4 6-8 i
e
i ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS I AND 2 (TVA SQN TS 54) 4 i
i 1
4 l
=
4 l
j I
m
(.*
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 3
4.6.1.3. Each containment air lock shall be demonstrated OPERA 8LE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the door seals B ;fMswe at a tt greater than or equal to 6 psigf %.- e
_ r e r-hed asdeterAned bj pecislen $hsu meawenents
.u. a
,e:-..-
~
wkta arasured $w at Imt 2&nufts w'th By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock i
s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
G The provisions of Specification 4.0.2 are not applicable.
l
- Exemption to Appendix "J" of 10 CFR 50.
k..
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS
.m.
SURVEILLANCE REOUIREMENTS
- 3..
4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After eacn opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L e the volume between the door seals
[f Yb(d t; greater han or equal to 6 psig,4es-44 as deterinio1rd b peCISien h' IneAwrementi
~
y h--t'E
- =t-uthen meass. red ic.' at Itast 2 mo'nutes with b.
By conducting an overall air lock leakage test at not less than P, within its limit:jerifying the overall air lock leakage rate is (12 psig) and by I
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required wnen maintenance has been performed on the air lock that could affect the air lock sealing capaoility."
t c.
At least once per 6 montns by verifying that only one door in each
%~4 l
air lock can be opened at a time.
~
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
SEQUOYAH - UNIT 2 3/4 6-8 l
i l
ENCLOSURE l
PROPOSED TECHNICAL SPECIFICATICN CHANGES l
l SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 l
i l
l i
i i
I 3
I i
1 l
l
\\
l 4
l j
1, l
i i
. - -.,. _ - - -.. _ _..,, _,, -.., _,.... -,.. -...,,,, -,,,. _ _, _..,. - - - - - -, _. ~. -,..
^
s (k
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS i
i-4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, h the volume between the 4f afres5Ve door seals 1r a _rrr-f rd ta-greater than or equal to 6 psig h y
a,Jeterined 6 pen'u'en (kw mawesents when Msaed,he at Imt 2r* nks "M
.,. a
,e
- -... ~
~
~
~
By conducting an overall air lock leakage test at not less than P f,
a b.
l (12 psig) and by verifying the overall air lock leakage rate is within its limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has
.]
been performed on the air lock that could ef'ect the air lock s'ealing capability.*
~'
i At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
i
,G The provisions of Specification 4.0.2 are not applicable.
I
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS
.-.3 SURVEILLANCE REOUIREMENTS
- y 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal e
leakage less than or equal to.0.01 L w$en. the volume between the door seals b -f(( nib $d t; greater han or equal to 6 psig,4es-44 1=1 ? ? ' mt--
QS deten*IMO by fitCisien Sku ineAswements u; hen measured Scr at l0$f 2 minuftS LJith b.
By conoucting an overall air lock leakage test at not less than P, within its limit:gerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
b-c.
At least once per 5 months by serifying that only one door in each air lock can be opened at a time.
- The provisiens of Specification 4.0.2 are not applicable.
" Exemption to Appencix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8
d 1
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES
-l 1
1 SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 i
i i
l 1
t J
l i
e 1
i i
F l
l g
( ':
CONTAINMENT SYSTEMS l
SURVEILLANCE REQUIREMENTS
( i,
~
\\
4.6.1.3. Each containment air lock shall be demonstrated CPERABLE:
1 After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 4t a,pressu e7 _rre-fzed te greater than or equal to 6 psigf r
fer et door seals !!
asdeterplned b ytecisica ll:w meawenents wktn measured;lu at Itast 2tsmfes inIth
.,-,.+ se
-..s ~
By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is within its limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lack that could affect the air lock s'aling capability.*
e At least once per 6 months by verifying that only one door in each c.
air lack can be opened at a time.
'.4 The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
\\.
SEQUOYAH - UNIT 1 3/4 6-8
l l
CONTAINMENT SYSTEMS
...s.,
SURVEILLANCE REOUIREMENTS
.3 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L>, h the volume between the
$d((dIb(d'thgreater han or equal to 6 psig,4es-44 I
door seals
%: ??
=t-as cleterini,1ed by frecision Nu ineMwemenf5 u; hen measured Ic.' at lost 2 minutes with b.
By conoucting an overall air lock leakage test at not less than P, within its limit:gerifying the overall air lock leakage rate is (12 psig) and by I
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 5 montns by verifying that only one door in each M
air lock can be opened at a time.
1 i
9
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
1 i
I SEQUOYAH - UNIT 2 3/4 6-8
i ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES 1
SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SON TS 54) 9 e
(.A CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 3
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L,when the volume between the 47 aftf5Wep erru-f red te greater than or equal to 6 psigf ;r :t f
door seals !!
asdeterined b precislen fix meawearnts when aras. red,he at Inst erhuln with ua
,e s.. --
~~~
~
~
b.
By conducting an overall air lock leakage test at not less than P, (12 psig) and by verifying the overall air lock leakage rate is within its limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock s'ealing capability."
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
ij TheprovisbnsofSpecification4.0.2arenotapplicable.
- Exemption to Appendix "J" of 10 CFR 50.
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS
. m.,
1 SURVEILLANCE REOUIREMENTS
- . y -
4.6.1.3 Each containment air lock shall be demoastrated OPERABLE:
a.
After each opening, except wnen the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than ur equal to.0.01 L wMm the volume between the door seals
$-((( hYbb t; greater han or equal to 6 psig,.f.es-44 A:::: ??
- =t-QS deterrIned by frecisien $he peMixements den meuured Sc.' at least 2 minuttS laith By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by within its limit:yerifying the overall air lock leakage rate is 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 5 months by verifying that only one door in each air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
SEQUOYAH - UNIT 2 3/4 6-8
'I
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54)
O S
e
($<
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 3
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the door seals fr ;,fff554tecrru-i:-d to greater than or equal to 6 psigffer et 47 a asdetersned bj pechicn fl:w meawements u,a+
,e
- -..+ ~
when mssel he at Imt ers ndes with
~
~
By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock y"s s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
9 U
The provisions of Specification 4.0.2.are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
k,.
SEQUOYAH - UNIT 1 3/4 6-8
C_O.NTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- .g 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except wnen the air lock is being used for
\\
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L* wmea. the volume between the ata freShrt'.
han or equal to 6 psig,['c It door seals to greater QS deterinIned by frecision b gnenswements
~
-h rt ?? - % -_,
when aneasured h.~ at Itast 2 mindes with b.
By conoucting an overall air lock leakage test at not less than P, (12 psig) and by yerifying the overall air lock leakage rate is within its limit:
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
4' *-
c.
At least once per 5 months by verifying that only one door in each air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not aoplicable.
- Exemption to Appendix "J" of 10 CFR 50.
'I SEQUOYAH - UNIT 2 3/4 6-8
--m
-.~- _ _ -._-
,.m--
ENCLOSURE PROPOSED TECHNICAL SPECIFICATICN CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) i i
l I
._e
w
(. -9 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS g
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L when the volume between the a
door seals ir ;fff55tV*Gerru-ized te greater than or equal to 6 psigfh 4T a vdeterAned b pecWen L meawear ts n
Whtn t%vaSute]j$se at lttSt 2tm'nMfts let'fl'
.,n,c+
sc:~+~
By conducting an overall air lock leakage test at not less than Pa b.
(12 psig) and by verifying the overall air lock leakage rate is within its limit:#
1.
At least once per six months, and I
2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
'i The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8
C_0NTAINMENT SYSTEMS i
SURVEILLANCE REOUIREMENTS
- .y
- 4. 6.1. 3 Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L* when. the volume between the of a fre&rc han or equal to 6 psig;[#
0- at door seals
____... d to greater y frecision kw meAwrements as determined b A:::: ? ? -bt u; hen enrasured hc.' ut Itasf 2 minufeS With b.
By conducting an overall air lock leakage test at not less than P, within its limit:yerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least obce per 6 months by verifying that only one door in each EbM:
air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not apolicable.
- Exemption 'p Appendix "J" of 10 CFR 50.
i SEQUOYAH - UNIT 2 3/4 6-8
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54)
N e
w
(?-V CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS i
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 4f a f9554tG f
door seals is p,.[: u-ized te greater than or equal to 6 psigf ;r :t 41deterinlned bj ytecWen h meawends when avasured $ce at least 2rdnufts inia u,c+
,e:-+-
By conducting an overall air lock leakage test at not less than Pa b.
(12 psig) and by verifying the overall air lock leakage rate is g
within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
?
M The provisions of Specification 4.0.2 are not applicable.
f-
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8 7-
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- 3. -
- 4. 6.1. 3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L* h the volume between the of a /WSh.rc door seals
, ____.. _ d t; greater han or equal to 6 psig,4es-41 den meassred [p,ecisien (kw measure ag deterpind b u,--,
y t Itast 2 minufes taith
.a b.
By conducting an overall air lock leakage test at not less than P, I
within its limit:gerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability.*
c.
At least once per 5 months by verifying that only one door in each air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
" Exemption to Appendix "J" of 10 CFR 50.
I I
SEQUOYAH - UNIT 2 3/4 6-8
a 2
ENCLOSURE PROPOSED TECHNICAL SPECIFICATICN CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) i e
=
I
s
(. -t CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 9
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L,when the volume between the 4T siff95Sde h
door seals 9 p _nu-ind te greater than or equal to 6 psigf 45deterpined bj pecisIcn $l:.w meawements whn ansured he at Imt 2r"lnufts MIA u,a
,c
- ~.s -
~~
~
By conducting an overall air lock leakage test at not less than Pa b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and Prior to establishing CONTAINMENT INTEGRITY if cpened when 2.
CONTAINMENT INTEGRITY was not required when maintenance has
.]
been performed on the air lock tha't could affect the air lock s'ealing capability."
At least once per 6 months by verifying that only one door in each
~
c.
air lock can be opened at a time.
f m
The provisions of Specification 4.0.2 are not applicable.
i
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L* w*en. the volume between the at a preskre' door seals
____...J
- , greater han or equal to 6 psig,=f.es-4t as deterel.,ed b pecision Skw meuurements n=t,E
- =t-y a; hen measured lc.' at Itast 2 minutes with b.
By concucting an overall air lock leakage test at not less than Pa within its limit:gerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required wnen maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 5 montns by verifying that only one door in each
-N-air lock can be opened at a time.
i
=
1 1
l
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
?
SEQUOYAH - UNIT 2 3/46-8
ENCLOSURE 1
PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) i.
I l
I L
==
i i
4 4
(0-S CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS g
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each openino, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L when the volume between the 3
at a,pffS5utGir a _rru-ized te greater than or equal to 6 psigf fee-et door seals asdefeepslned byeddca h meawenents
~~
~
when arasac'd loc at Itast 2rs*mdts MIth
- m.,, + s c :-. ~
By conducting an overall air lock leakage test at not less than Pa l
b.
J g
(12 psig) and by verifying the overall air lock leakage rate is i
within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has
.1 been performed on the air lock that could affect the air lock n
.sealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
l
- i4 The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
(
SEQUOYAH - UNIT 1 3/4 6-8
1
)
, CONTAINMENT SYSTEMS i
SURVEILLANCE REOUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L* h the volume between the door seals atafre5%rcp _ :u = d t; greater han or equal to 6 psig,4er at
-luct?5
- =ty' as deterpluwd by frecisien Skw peMurements den masured h. at Imt 2 mintes with b.
By concucting an overall air lock leakage test at not less than P,
)
(12 psig) and by ' erifying the overall air lock leakage rate is j
within its limit:
1.
At least once per six months, and l
2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITf was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 6 months by verifying that only one ioor in each air lock can be opened at a time.
1
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8
l ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS I AND 2 (TVA SON TS 54) i 4
e O
4 l
1
w m
~
(Edd CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS i
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 47 a PffsSure f
door seals f r 7_rre-!2-d te greater than or equal to 6 psigf ;r et y
asdeferpro'ned bj ytecisica lhw meawtar ts n
u,a
,e:-..+-
whn ums ted he at Imt 2m:nufts uM
~
~~
By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and
. i 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock s'ealing capability."
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
- 4 The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8
C_0NTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- 4. 6.1. 3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, e the volume between the door seals
$"f[
INdt; greater han or equal to 6 psigf.ea-at f
Nen $he AdWements
~
as detenniowd by
-h u t ? ? - b t --_
- u; hen unranted [:f.'ec. af it450 2 oninuftS With b.
By conducting an overall air lock leakage test at not less than Pa (12 psig) and by gerifying the overall air lock leakage rate is within its limit:
)
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 6 months by verifying that only one door in each N*:
air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Apoendix "J" of 10 CFR 50.
SEQUOYAH - UNIT 2 3/4 6-8
4 1
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) i a
i o
l 1
\\
)
i e
^
.s (S:
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 3
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 1
door seals h p,ptessu e_ r" zed to greater than or equal to 6 psigf fee-et 47 a r
asdttetts'ned bj pecWcn h meawthentS when arassed he at least 2nkles uM u,s
,c
- -..+ -
~
~
~
By conducting an overall air lock leakage test at not less than P, b.
g (12 psig) and by verifying the overall air lock leakage rate is within its limit:#
1.
At least once per six months, and Prior to establishing CONTAINMENT INTEGRITY if opened when 2.
CONTAINMENT INTEGRITY was not required when maintenance has been perforced on the air lock that could affect the air lock g
s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
l J
4
{
i The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- . g. -
4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L whee-the volume between the door seals taJteskrep _crum :cd t; greater han or equal to 6 psig,4es-44 a
as determined b pecisEen fkw newtements 4 ::: ? ?
=' L y
~
witen measured Ec.' at Itast 2 minutes with b.
By conducting an overall air lock leakage test at not less than P, within its limit:yerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
I
- The provisions of Specification 4.0.2 are not applicable.
" Exemption to Appencix "J" of 10 CFR 50.
i I
SEQUOYAH - UNIT 2 3/4 6-8 e
c
_ =
I l
i ENCLOSURE PQ0 POSED TECHNICAL SPECIFICATION CHANGES
- l SECUOYAH NUCLEAR PLANT UNITS 1 AND 2 f
.i i
1 9
l t
i a
't
.rq
_.. -,. - <~ --
l l
- s,
(.*
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 3
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the door seals f r p,fff554 G_cru-f red to greater than or equal to 6 psigffer :t 47 Q t
aydeferpslned bj pecislcn ]hu; meswMe ts n
whn omsael he at least 2&nufts "Id u,a+
,c:..-
~ ~ ~
~
~~
By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is within its limit:#
1.
At least once per six months, and l
j Prior to establishing CONTAINMENT INTEGRITY if opened when 2.
CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock t
3 s'aling capability."
e At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
i l
- q The provisions of Specification 4.0.2 are not applicable.
f-
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8
~~
CONTAINMENT SYSTEMS
.n, SURVEILLANCE REOUIREMENTS
- 4. 6.1. 3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L^ *dHM& the volume between the ata presSe c r
...d t; greater han or equal to 6 psig,Skw meuurements
'c at door seals as determined b p.ecislen n== n -bt- ~
den onrasured Sc.' d Ita5f 2 minuftS With y
b.
By concucting an overall air lock leakage test at not less than P, (12 psig) and by gerifying the overall air lock leakage rate is within its limit:
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required wnen maintenance has been performed on the air lock that could affect the air lock sealing capacility."
n.
c.
At least once per 6 montns by verifying that only one door in each
i air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8
I l
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54)
I l
i
(. -
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 47 afh'ssu e;-_rre-!:M to greater than or equal to 6 psigfM r
door seals !!
asdeferhed b pecWen L meawenents when msaed,he at Imt 2rt nufn *M
.,.. a
,e.:....
~~~
~
-~ '
b.
By conducting an overall air lack leakage test at not less than P, g
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has
.]
been performed on the air lock that could affect the air lock s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a ti1ne.
?
i The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J'_ of 10 CFR 50.
SEQUOYAH - UNIT 1 3/4 6-8
C_0NTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS 3
4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L, whea. the volume between the door seals N[ bYb(d t; greater han or equal to 6 psig as deterpined b p eciss'en,4.or--a.t
$he meAswements u -+,= :-.. -
y
^
ul hens onen$Mred lco' df $teSf E MirtMf2S Ede'th By concucting an overall air lock leakage test at not less than P, b.
(12 psig) and by within its limit:gerifying the overall air lock leakage rate is 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
At least once per 5 months by verifying that only one door in each M
c.
air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
SEQUOYAH - UNIT 2 3/4 6-8 i
[i I
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54)
M e
q,
~. _ _
h CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS i
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the at a,ptessure7 c ru-ized to greater than or equal to 6 psigf ;r :t f
door seals i asdeterAned hj peciden L mnwesents
.u, a
,e
- -.+--
when avasurc'd $ce at Itast 2n'ndes soIth
~~~'
By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has j
been performed on the air lock that could affect the air lock s'ealing capability."
At least once per 6 months by verifying that only one door in each
~
c.
air lock can be opened at a time.
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
,l..
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- .y 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L^ when. the volume between the af a fre5S4rc door seals
____... d t; greater han or equal to 6 psig,4es-44
-hr ??
- -r-as deterpiud by frecisien $kw measurements wisen measured (c.' at Itast 2 minufeS (4th b.
By conoucting an overall air lock leakage test at not less than P, within its limit:gerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to estaolishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
~
c.
At least once per 5 montns by verifying that only one door in each
JS l
air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appencix "J" of 10 CFR 50.
l I
SEQUOYAH - UNIT 2 3/4 6-8
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) i I
i 6
.- _. ~. _
-s s
(. -d CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS
- t 4.6.1.3. Each containment air lock shall be demonstrated CPERABLE:
After each opaning, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 4t a,fteS54td7 ceru 4 zed to greater than or equal to 6 psigf ;r :t f
door seals f asdtferps'ned bj pecMen L meneteents u,s
,e
- -..+--
w),en arasaed he at Imt 2&nufts uM
~~'~
~
~ ~ '
By conducting an overall air lock leakage test at not less than P a b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least ong'e per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock
- -E sealing capability."
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
f L?
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- 3..,
4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.i0.01 L* **Mwk the volume between the door seals ta fre5Se cn rrun :d to greater han or equal to 6 ps1g, h a
r
-1 =c~
?? - Hu y QS deterinIu1ed byfecisien b rneAsurernents
~
aen oneuured h. at least 2 mo'nutes with b.
By conducting an overall air lock leakage test at not less than Pa (12 psig) and by gerifying the overall air lock leakage rate is within its limit:
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capacility."
- ?-
c.
At least once per 6 months by verifying that only one door in each 1
air lock can be opened at a time.
i
- The provisions of Specification 4.0.2 are not applicable.
" Exemption to Appendix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8 y
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS I AND 2 (TVA SQN TS 54) 1 l
I A
~> :
1 i
M l
l I
I
m hC
~
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS
~
i l
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying sial leakage less than or equal to 0.01 L,when the volume between the 47 aftf5We--rf red ta-greater than or equal to 6 psigfh door seals !! 7 4>deternhed hj pecisica ff:a: meawenents wkn ms. red he at Imt 2ro:nutes wM u,a s e : ~. s ~.
'~
~
~'
By conducting an overall air lock leakage test at not less than P, b.
g (12 psig) and by verifying the overall air lock leakage rate is within its.Timit:#
l 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock s'ealing capability."
At least once per 6 months by verifying that only one door in each 1
c.
air lock can be opened at a time.
i y
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
b,.
SEQUOYAH - UNIT 1 3/4 6-8
C_0NTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- .p.
4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except wnen the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L whee. the volume between the 3
door seals at" ayes %rc; _c rur'. cd t; greater han or equal to 6 psig,#0r at QS deterPIned b pecision $kw mewrements 3:::t ? ? 'mutz y
Jen measured h.~ at least 2 minutes with b.
By conducting an overall air lock leakage test at not less than P, within its limit:yerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
i l
SEQUOYAH - UNIT 2 3/4 6-8
- E
ENCLOSURE l
PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) i
m
(.$
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 4T tiff 955VG greater than or equal to 6 psigf ;; et f
- r-hM ta-door seals 7 a>deterAned bj pecisica lhu; meswesents
~~'
when mesuted $ce at Inst 2ndnufts MIth us s e :.. --
By conducting an overall air locx leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is within its limit:#
l 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has j
been performed on the air lock that could affect the air lock s'ealing capability.*
At least once per 6 months by verifying that only one door in each
~
c.
air lock can be opened at a time.
j The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
k.
SEQUOYAH - UNIT 1 3/4 6-8
.m.
C_0NTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, h the volume between the door seals h[$hYNd t; greater han or equal to 6 psig h j
as deterini.,ed b p.ecision Skw measwements
-u -- t ? ? -bt-y c; hen enrasured h.' at Itasf 2 minufeS tith b.
By conducting an overall air lock leakage test at not less than P a within its limit:yerifying the overall air lock leakage rate is (12 psig) and by 1
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once oer 5 months by verifying that only one door in each air lock can be opened at a time.
l
- The provisions of Specification 4.0.2 are not applicable.
- Exception to Appendix "J" of 10 CFR 50.
i SEQUOYAH - UNIT 2 3/4 6-8
i ENCLOSURE PROPOSED' TECHNICAL SPECIFICATICN CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) 1
~!
j j
j l
I l
9 w
i 1
I i
I l
t 1
m
(.
- CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 47aftf55ue fr 2 r
door seals f r p z=-iM te greater than or equal to 6 psigf asdefesun ned b predica L meawearnts
~
when suasurc'd,(se at losf 2rienfts idtl'
., - a sc.:..~
By conducting an overall air lack leakage test at not less than P fh a
b.
(12 psig) and by verifying the overall air lock leakage rate is within its limit:#
1.
At least once per six months, and
.9 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock g
s'ealing capability.*
At least once per 6 months by verifying that only one door in each
~
c.
air lock can be opened at a time.
>J The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
b..
SEQUOYAH - UNIT 1 3/4 6-8
1 CONTAINMENT SYSTEMS l
SURVEILLANCE REOUIREMENTS
- . y -
l
- 4. 6.1. 3 Each containment air lock shall be demonstrated OPERABLE:
l a.
After each opening, except when the air lock is being used for i
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L, h the volum2 between the door seals b greater han or equal to 6 psig,4er--at Amt?E
- e as deterrined by frecision lho mewements u; hen asensured lc.' d Itasf 2 minutes tith b.
By conducting an overall air lock leakage test at not less than P, within its limit:yerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 6 months by verifying that only one door in each 5%
air lock can be opened at a time.
l I
l
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
3 SEQUOYAH - UNIT 2 3/4 6-8
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54)
O N
1 o
G
m h<
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS
'i 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 4t afh*SWG--Med te greater than or equal to 6 psigfh door seals !! p.
asdetershed by ytecisica 4k measnetwts
.,-, +
,e when arasured $ce at Itast 2ndedts son'th By conducting an overall air lock leakage test at not less than P, b.
j (12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and i
I 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a titne.
4
/
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
\\..
i SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L, e the volume between the door seals
$ I[ NYbbd t; greater han or equal to 6 psig,4er-44 as detettIned b peciden $he peAwremeds
~
-h--t?? : w '
y u;isen uneasured $c.' ut IMSI 2 mindeS tain b.
By concucting an overall air lock leakage test at not less than P' within its limit:gerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
.~
c.
At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
\\
\\
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8 e
f
1 ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) e l
m :
l' (4
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 47 affd5We7 rrrr-fred M greater than or equal to 6 psigffr &
door seals !!
a,Jetenn ned b pecisica lhw meawne ts n
when arasac'd,he at Imt 2rdedts MIth n +
,e l
~~~~
~
' ~ '
By conducting an overall air lack leakage test at not less than P, b.
(12 psig) and by verifying the overall air lack leakage rate is g
within its. limit:#
1-l.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock
?
s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
l 1
'M i
a The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
k,.
l SEQUOYAH - UNIT 1 3/4 6-8 1
CONTAINMENT SYSTEMS SURVEILLANCE RE0VIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L, h the volume between the door seals
$d((NY$$dt; greater han or equal to 6 psig, W
% :t 'E- + '
QS detthnIu100 by frecisien Ow ineAwrements u: hen uneasured ic.' at itsst 2 oninuteS with I
b.
By conducting an overall air lock leakage test et not less than Pa within its limit:gerifying the overall air lock leakage rate is (12 psig) and by -
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability.*
c.
At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
l re provisions of Soecification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
I I
SEQUOYAH - UNIT 2 3/4 6-8
~
e
-.v-
---~-g
a-.
1 ENCLOSURE j
PROPOSED TECHNICAL SPECIFICATICN CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) t i
0 1
4 l
i 4
-.. ~
m I'
(.'
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS
~
3 4.6.1.3 Each containment air lock shall be comonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, wn a the volume between the 47c1]r/955VGr -f M to greater than or equal to 6 psigfM ir ;-
door seals asdeterined b y nisica lhw meawe~e ts n
when avesure);(se at ?*tst dininnfts les'th 1--+
,e r-By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is within its limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRIT'( was not required when maintenance has I
been performed on the air lock that could affect the air lock
- 7 s'ealing capability.*
At least once per 6 months by verifying that only one door in each
)
c.
air lock can be opened at a time.
i
.g The provisions of Specification 4.0.2 are not applicable.
1 j
- Exemption to Appendix "J" of 10 CFR 50.
SEQUOYAH - UNIT 1 3/4 6-8
--c.
7
~, -,
y-----
CQNTAINMENT SYSTEMS
. -n.,
SURVEILLANCE REOUIREMENTS y,
4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L when.the volume between the door seals
[ d((kY$b to greater han or equal to 6 psig,Ou pewements
'r et as deterswd pecision hurTE
- =t-den oneuured
. at Itast 2 minuftS With b.
By conducting an overall air lock leakage test at not less than P, within its limit:jerifying the overall air lock leakage rate is (12 psig) and by -
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required wnen maintenance has been performed on the air lock that could affect the air lock sealing capability."
N-c.
At least once per 5 months by verifying that only one door in each air lock can be opened at a time.
)
i
\\
The provisions of Specification 4.0.2 are not aoplicable,
- Exemption to Appendix "J" of 10 CFR 50.
'I SEQUOYAH - UNIT 2 3/4 6-8
I I
I I
l i
ENCLOSURE i
l PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 l
i J
i 5
i d
i i
1 i
)
l i
l i
l
.i I
I i
i w.
.-,,m
-. -,w - - - - ---..
_wy-m m mv.,-.,
ww-w...,w..-,.m,_,..
-.m m-,~,----~
w,-
-.,, -,- w--
-, - ~
w
(?-Z CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS i3 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the door seals !! ; fit'S54tGcrr-f zed ta-greater than or equal to 6 psigfh2 4T a 45defet$edb h meawesents when avas.te)yte4Icn he at Imt 2n:eks s'th xa
,c
- ~
~~
~
'^
By conducting an overall air lock leakage test at not less than P,
b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has
,.]
been performed on the air lock that could affect the air lock s'ealing capability."
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
l l
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
k,.
SEQUOYAH - UNIT 1 3/4 6-8 I
C0_NTAINMENT SYSTEMS
. - ~,.
SURVEILLANCE REOUIREMENTS
- .p 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After eacn opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L m the volume between the
$d((NYbbtogreater han or equal to 6 psig, h door seals 49 Jefenel,1ed b p,ecisien (ku pleAsurement.5 u.--
n :....,
y winen measured Ic.' at lost 2 mirsutes with By concucting an overall air lock leakage test at not less than P, b.
(12 psig) and by within its limit:gerifying the overall air lock leakage rate is 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 6 months by verifying that only one door in each Ye air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
SEQUOYAH - UNIT 2 3/4 6-8 i
e 4
ENCLOSURE PROPOSED TECHNICAL SPECIFICATICN CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS S4) e
m
(.'
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS i
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the at afh*ssure: r-Med t^ greater than or equal to 6 psigffr :t door seals 4 7
asdeferiored b peelu'en llw meawenents when avasured,$ce at Itast 2rs'nufts MIth u,-+
,e:-..s~
~~
~
~~
By conducting an overall air lock leakage test at not less than P b.
a (12 psig) and by verifying the overall air lock leakage rate is within its limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has
.h been performed on the air lock that could affect the air lock s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
I U
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
l..
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- n e
4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L whea.the volume between the N[(NINdt; greater han or equal to 6 psig,4es-44 door seals h:1 ? E
~ =t c*
as defe w N d by frecisien lkw prMwements a: hen measured Sc.' at Itast 2 minufes with By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by within its limit:yerifying the overall air lock leakage rate is 1
1.
At least once per six months, and 1
2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 6 months by verifying that enly one door in each
[^.
air lock can be opened at a time.
i
- The provisions of Specification 4.0.2 are not applicable.
" Exemption to Apoendix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8 I
o N
ENCLOSURE Prt0 POSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SON TS 54)
G
.h F
. ~. - -
1
(. ':
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4
i 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 47afMS54rd fee-et door seals f r p. ccre-ized te greater than or equal to 6 psigf a>deferp$ned b dica L mmetMds Whtn hedSutt'$j peCP dt $6Sf $1ne'nh$ in
., -, a s c :..~
By conducting an overall air lock leakage test at not less than P, j
b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has j
been performed on the air lock that could affect the air lock sealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
54 The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
b.
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- .e
- 4. 6.1. 3 Each containment air lock shall be demonstrated GPERABLE:
a.
After each opening, except wnen the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L* when. the volume between the door seals atafre%yr(J to greater han or equal to 6 psig,f.es-41
- ru.
-1:::: ? ? -Hut-as detef$wd by frecisien $ka memrements when measured $c.' at least 2 mindes with b.
By conoucting an overall air lock leakage test at not less than P, within its limit:jerifying the overall air lock leakage rate is (12 psig) and by -
1.
At least once per six months, and 2.
Prior to estaolishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
5"-
c.
At least once per 5 months by verifying that only one door in each air lock can be opened at a time.
The provisions of Specification 4.0.2 are not applicable.
j
- Exemption to Appendix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8 m -
.m
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54)
E
'l
m (b-2 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the door seals fr 7,ffeS5u eerr'a-?:cd te greater than or equal to 6 psigf ;r et 47a r
f asdeferpined hj pe&lcn L meawene ts n
when avasael he at lost 2m:nks dth u,-+
,e:-+~
~~ ~
~
~
By conducting an overall air lock leakage test at not less than Pa b.
(12 psig) and by verifying the overall air lack leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock r,
s'ealing capability.*
At least once per 6 months by verifying that only one door in each
~
c.
air lock can be opened at a time.
M
- The provisions of Specification 4.0.2 are not applicable.
f -
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8
C_0NTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- .g.
- 4. 6.1. 3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L* h the volume between the ata freskrt door seals
._d to greater ehan or equal to 6 psig,4es at as Jetennined b precision Skw ineasurements hrt ?? -br y
u; hen measured b:.' at Itast 2 minutes With b.
By conoucting an overall air lock leakage test at not less than P, (12 psig) and by yerifying the overall air lock leakage rate is within its limit:
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capacility."
c.
At least once per 6 months by verifying that only one door in each O
air lock can be opened at a time.
1
~
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
SEQUOYAH - UNIT 2 3/4 6-8 I
f
I ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) i i
i 1
1 1
l e
?
b' w
-~
m
(. #d CONTAINMENT SYSTEMS f
SURVEILLANCE REQUIREMENTS 1
i 3
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 4T Q fff554 6 f
f door seals ir p,. 0 r-ized t~ greater than or equal to 6 psigf ;r :t asdeferptlned bj prechlcn 4k meawtme ts n
whn umssed b at Imt 2er:nfes "M u,c+
,c:-..~
~
~
By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is g
within its limit:#
1.
At least once per six months, and Prior to establishing CONTAINMENT INTEGRITY if opened when 2.
CONTAINMENT INTEGRITY was not required when maintenance has j
been performed on the air lock that could affect the air lock 1
sealing capability.*
At least once per 6 months by verifying that only one door in each
' ~
c.
air lock can be opened at a time.
9 M
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
k..
3/4 6-8 SEQUOYAH - UNIT 1
,,s
._.y
C.ONTAINMENT SYSTEMS 1
SURVEILLANCE REOU.'REMENTS l
4
- 4. 6.1. 3 Each containment air lock shall be demonstrated OPERABLE:
a.
After eacn opening, except wnen the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal j
leakage less than or equal to.0.01 L* whea. the volume between the door seals def:e5%.rt'd to greater ohan or equal to 6 psig,4er--44 p2 r=
as detemked b p'ecisien (km peAwremenh j
h m ??
- -2 -_'
y u; hen measured h' at Itast 2 minutes with D.
By concucting an overall air lock leakage test at not less than P, within its limit:yerifying the overall air lock leakage rate is (12 psig) and by
)
1.
At least once per six months, and 2.
Prior to estaolishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capacility."
c.
At least once per 5 months by verifying that only one door in each k
air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8
ENCLOSURE PROPOSED TECHNICAL SPECIFICATICN CHANGES SEQUOYAH NUCLEAR PLANT UNITS I AND 2 (TVA SQN TS 54) 9 h
w
(.W J
CONTAINMENT SYSTEMS j
SURVEILLANCE REQUIREMENTS 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 4t afressve fr 2 door seals ir p. : r'rized M greater than or equal to 6 psigf edeterp>lned b ytecisica llw meawesents When MnSurd];cc ut IDSt Oln?n4NS Mat $'
% g+
,5 m
By conducting an overall air lock leakage test at not less than Pa b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock
~
sealing capability."
1
.I At least once per 6 months by verifying that only one door in each
)
~
c.
air lock can be opened at a time.
e I
il The provisions of Specification 4.0.2 are not applicable, i
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L* when. the volume between the door seals at* ayes %rcu = d t; greater han or equal to 6 psig,44r e.t p2 Aart ? E -%ut,
QS deten*Ined by frecisEen [kw memrementS den memced h.~ at lost 2 mindes with b.
By conoucting an overall air lock leakage test at not less than P, within its limit:yerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 6 months by verifying that only one door in each Sn 1
air lock can be opened at a time.
h
- The provisions of Specification 4.0.2 are not applicable.
" Exemption to Appendix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8 D
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) 4 m
4 l
s 0
i
~
w (U":
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS
,1
'3 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 47 a Ptes54 e f
t door seals f r p,. ccre-ized +' greater than or equal to 6 psigf ;r :t vdeterAned bj ytecislcn lim meaurtments u,-+
,c:~.s~
when avasured $se at It'ast 2tn.'nufts MIth By conducting an overall air lock leakage test at not less than Pa b.
(12 psig) and by verifying the overall air lock leakage rate is e
within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has
.]
been performed on the air lock that could affect the air lock sealing capability.*
~
At least once per 6 months by verifying that only one door in each
~
c.
air lock can be opened at a time.
e U
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
(,
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS
.m..
SURVEILLANCE REOUIREMENTS
- q 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
2 a.
After each opening, except wnen the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L^ e the volume between the door seals ataye%rcp _rr r::;d t; greater han or equal to 6 psig,.for.+t hut ?E
- =t z as dettWined by.'ecisien Skw peMwements
~
u; hen measured h.' at Itast 2 minuftS with b.
By conducting an overall air lock leakage test at not less than P, within its limit:yerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 5 months by verifying that only one door in each 4-air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
'I SEQUOYAH - UNIT 2 3/4 6-8 e
1 ENCLOSURE FROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54)
(
l 4
O i
l
(. 't CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 47 a,ptessure7 erru-f red to greater than or equal to 6 psigf ;r :t f
door seals !!
asdefersned byeciden h mnwthrAtS whn avasael he at Inst 2p"lnafts "Ith u,a
,c:-+~
~~ ~
~
~~
By conducting an overall air lock leakage test at not less than Pa b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and Prior to establishing CONTAINMENT INTEGRITY if opened when 2.
CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock ls s'ealing capability.*
~'
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
9
'A The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
k,.
SEQUOYAH - UNIT 1 3/4 6-8
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS 4.6.1.3 Each containment air lock shall.be demonstrated OPERABLE:
a.
After each opening, except wnen the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L when.the volume between the ata presSe c r
door seals
, _ _ _ _... d t; greater whan or equal to 6 psig,4es-44 as deterinied by f.ecision flu snetaurements
,~.,= :....~
when measured ic.' ut ItaSt 2 tm'rsufeS with b.
By concucting an overall air lock leakage test at not less than P, (12 psig) and by gerifying the overall air lock leakage rate is 3-within its limit:
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
"55 c.
At least once per 5 months by verifying that only one door in each air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
i SEQUOYAH - UNIT 2 3/4 6-8
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) l i
e 9
9 l
w l
~ -
(. 'J CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS
- i 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 47 a,ptes5u ep rcru-i -d to greater than or equal to 6 psigf ;r et r
f door seals !!
qsdeterm ned bj ytecisica lhw meawenents when suasaed tw at Imt 2m:nafts with
,c+
,e:-.~
~ ~ ~
~
'~~'
By conducting an overall air lock leakage test at not less than P i
a b.
(12 psig) and by verifying the overall air lack leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed 07 the air lock that could affect the air lock j
sealing capability."
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
I 1
j The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
l..
SEQUOYAH - UNIT 1 3/4 6-8
1 I
CONTAINMENT SYSTEMS SURVEILLANCE RE0VIREMENTS
- 4. 6.1. 3 Ea'en containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for i
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L wnea the volume between the door seals ta prestt; crr m ;;d t; greater han or equal to 6 psig,4es-44 a
as detenel,wd b pecision Ow pleAsurements u,..
,=
- .... ~
y
^
when uneasured $c.' at Itast 2 minutes With b.
By conducting an overall air lock leakage test at not less than P, (12 psig) and by yerifying the overall air lock leakage rate is within its limit:
1.
At least once per six months, and 2.
Prior to estaclishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not rec;uired when maintenance has been performed on the air lock that could affect the _ air lock sealing capacility."
c.
At least once per 5 months by verifying that only one door in each 4
air lock can be apaned at a time.
1
- The provisions of Specification 4.0.2 are not applicable.
" Exemption to Appendix "J" of 10 CFR 50.
I SEQUOYAH - UNIT 2 3/4 6-8
=
t 4
i ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 l
e I
}
a l
)
i i
I 4
i
A CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS
~
3 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
J t
After each opening, except when the air lock is being used for
^
a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the door seals f r ;freswecrru-ized +" greater than or equal to 6 psig 27 d at a y
asdeletsned bj pecisica lhw meawwents when tunsured he at Inst 2tn.nks MIA
,-- +
,c By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
i 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
1 air lock can be opened at a time.
l 4
i
\\%
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
Q.
i SEQUOYAH - UNIT 1 3/4 6-8
,. - ~, _ - -,,, -
C_0NTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS 4.6.1.I Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L* wimm. the volume between the door seals ataft%rcr z rum :;d to greater han or equal to 6 psig,44r-61
-h::t ?? - but--
as deteMIned by frecisEen (kw tnemrements When atrassted lc ~ at Itast 2 minufeS with
(
b.
By concucting an overall air lock leakage test at not less than P, (12 psig) and by gerifying the overall air lock leakage rate is within its limit:
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when l
CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
~
c.
At least once per 6 months by verifying that only one door in each fa air lock can be opened at a time.
l l
l
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
t i
SEQUOYAH - UNIT 2 3/4 6-8
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SECUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54)
I e
9*
h 6
e g
i
(
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS i
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
Atter each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the at afressve door seals ir p. - r-ized to greater than or equal to 6 psigffr :t udeterined bj precWcn L mnwesents u,a
,e:-..s-When invasute'd $ce at Inst 2M Mfts inib I
By conducting an overall air lack leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if openen when CONTAINMENT INTEGRITY was not required when maintenance has j
been performed on the air lock that could affect the air lack s'ealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
9 U
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
k.-
SEQUOYAH - UNIT 1 3/4 6-8 9
C_0NTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS
- .y
- 4. 6.1. 3 Each containment air lock shall be demonstrated OPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L whea.the volume between the door seals _
h-f((fhb(d to greater han or equal to 6 psig,4es--at 4 ::: ? ? - b t v' QS dettftI'100 by frecisien $w met.$urements when enranted Sc.'slt iteSt 2 minuftS tith By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by within its limit:yerifying the overall air lock leakage rate is 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
c.
At least once per 5 months by verifying that only one door in each
'A air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
SEQUOYAH - UNIT 2 3/4 6-8 I
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SECUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SON TS 54) h e
, "w
(. 'd CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 1
i
~
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 47afressurep.ccru-ized t' greater than or equal to 6 psigf r :t f
door seals i as deletAned bj freciden L mnwesents u,a+
,e i-..s ~
~
when ausured [se at Itast 2 nlnnfts MIth b.
By conducting an overall air lock leakage test at not less than P, (12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY. was not required when maintenance has been performed on the air lack that could affect the air lock sealing capability.*
At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
e
~.
The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
,(.
SEQUOYAH - UNIT 1 3/4 6-8 l
CONTAINMENT SYSTEMS
]
SURVEILLANCE REOUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated GPERABLE:
a.
After each opening, except when the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L* whee the volume between the of a freShrc door seals
____...md t; greater han or equal to 6 psig,4es-44 ii lkw pet.surements
~
QSdeteftIo1r0by 4c m ?? - b t-_*
u; hen measured lfec s enc.' at least 2 oninute b.
By conducting an overall air lock leakage test at not less than P a (12 psig) and by yerifying the overall air lock leakage rate is within its limit:
1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability.*
- 7.
c.
At least once per 6 montns by verifying that only one door in each air lock can be opened at a time.
- The provisions of Specification 4.0.2 are not applicable.
" Exemption to Appendix "J" of 10 CFR 50.
i SEQUOYAH - UNIT 2 3/4 6-8 e
,-,w
ENCLOSURE PROPOSED TECHNICAL SPECIFICATION CHANGES SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) e e
=
w hk CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L,when the volume between the 4t afh*sWe fr &
door seals ir 7 _ r-M d te greater than or equal to 6 psigf asdefenn'ned bj pecihn h mnwesents L,a
,e:-..~
when measured $ce at lost 2r'sinnfts s*IA By conducting an overall air lock leakage test at not less than P, b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
l 1.
At least once per six months, and
. i 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has f
been performed on the air lock that could affect the air lock l
y.
sealing capability.*
~
At least once per 6 months by verifying that only one door in each
~
c.
air lock can be opened at a time.
=
i M
The provisions of Specification 4.0.2 are not applicable.
f-
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8
CANTAINMENT SYSTEMS
.-.s. )
SURVEILLANCE REOUIREMENTS
- q.
i 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
After each opening, except wnen the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to.0.01 L* h the volume between the at a Me%rt' door seals
_ ____.. J to greater han or equal to 6 psig,h 4cri1? :=tv*
QS detemined by frechien Skw peMurements when measured $c.~ d Itast 2 minufes with b.
By conoucting an overall air lock leakage test at not less than P, within its limit:yerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six months, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when CONTAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability.*
~.
c.
At least once per 5 months by verifying that only one door in each
."^
j air lock can be opened at a time.
i
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
SEQUOYAH - UNIT 2 3/4 6-8
ENCLOSURE i
l PROPOSED TECHNICAL SPECIFICATION CHANGES 1
SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TVA SQN TS 54) c S
l
~~
s m
( 4:
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS
.k l
4.6.1.3. Each containment air lock shall be demonstrated OPERABLE:
After each opening, except when the air lock is being used for a.
multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage less than or equal to 0.01 L, when the volume between the 47 a,ftessurep._: r-!:ed te greater than or equal to 6 psigf fee-e+
door seals !
asdeletsned bj pecisien $l:w meawesents whn arassed b at Inst 2rslnks wM u,a+
T c : -.. * ~.
~
~
By conducting an overall air lock leakage test at not less than Pa b.
(12 psig) and by verifying the overall air lock leakage rate is within its. limit:#
1.
At least once per six months, and Prior to establishing CONTAINMENT INTEGRITY if opened when 2.
CONTAINMENT INTEGRITY was not required when maintenance has
.]
been performed on the air lock that could affect the air lock s'ealing capability.*
l At least once per 6 months by verifying that only one door in each c.
air lock can be opened at a time.
'd The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
(.
SEQUOYAH - UNIT 1 3/4 6-8 f
CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated GPERABLE:
.I a.
After each opening, except hen the air lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal ieakage less than or equal to 0.01 L when.the volume between the i
$d[fNYbb :: greater han or equal to 6 psig,'e :t coor seals QS dettf$ied b.p ecision lku snewements l=ctlE
=t-y when meuured h.' at Itast 2 minutes with b.
By conducting an overall air lock leakage test at not less than P, within its limit:yerifying the overall air lock leakage rate is (12 psig) and by 1.
At least once per six mont.as, and 2.
Prior to establishing CONTAINMENT INTEGRITY if opened when COMAINMENT INTEGRITY was not required when maintenance has been performed on the air lock that could affect the air lock sealing capability."
-n.
c.
At least once per 6 months by verifying that only one door in each M
air lock can be opened at a time.
1
- The provisions of Specification 4.0.2 are not applicable.
- Exemption to Appendix "J" of 10 CFR 50.
i SEQUOYAH - UNIT 2 3/4 6-8
.-