ML20205M303

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-255/86-05 on 860119-0313 & Notice of Violation.Type a Test Must Be Conducted During Each Refueling Outage Until Two Consecutive Tests Satisfy App J Acceptance Criteria
ML20205M303
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/11/1986
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Buckman F
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20205M307 List:
References
NUDOCS 8604150169
Download: ML20205M303 (2)


See also: IR 05000255/1986005

Text

.

-

.

.

.

_ _

_

,

_ _ _

_ _ _ _

~ _ _ _ _ _

..

(

.w

.

I

r

[

APR 111936

.

i-

l

Docket No. 50-255

Consumers Power Company

ATTN: Dr. F. W. Buckman

Vice President

-

Nuclear _0perations

!

212 West Michigan Avenue

,

i

Jackson, MI 49201

Gentlemen:

I.

This refers to the routine safety inspection conducted by Mr. S. M. Hare of-

I

this office on January 19 through March 13, 1986, of activities at Palisades

!

Nuclear Plant authorized by NRC Operating License No. DPR-20 and to the

j

discussion of our findings with Mr. J. firlit and members of his staff at the

conclusion of the inspection.

l

The enclosed copy of our inspection report identifies areas examined during.

3

the inspection. Within these areas, the inspection consisted of a selective

i

examination of procedures and representative records, observations, and-

interviews with personnel.

,

1

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice of Violation. A

written response is required.

i

As stated in the report, th'e last two consecutive as-found Type A tests at

~

?.

Palisades have been unsuccessful and, pursuant to 10 CFR 50, Appendix J,.

l

Section III.A.6.(b), a Type A test shall be perfonned during each plant

shutdown for refueling until two consecutive Type A tests meet the acceptance

]

criteria of Appendix J.

Accordingly, unless you request and are granted an

j

exemption from this requirement'by the Office of Nuclear Reactor Regulation, we

expect you to conduct a Type A test during each refueling outage untilL two

1-

L

consecutive Type A tests satisfy the Appendix J acceptance criteria.

1

'

In accordance

"h 10 CFR 2.790 of the~ Commission's regulations, a copy of

.

this letter, ti..: enclosures, and your response to this letter will be placed '

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice of Violation

j

are not subject to the clearance procedures of the Office of Management and

j

Budget as required by the. Paperwork Reduction Act of 1980,' PL 96-511.

1

!

i

b

.

G

-

_l

!

fdd

-

-

-

-

-

-

-

- -

w

.,

l

s'

.

I

Consumers Power Company

2

1 1566

g

We'will gladly discuss any questions you have concerning.this inspection.

Sincerely,

_

i

'

40-

Carl

ape fello, Director

.

'

Division of1Reactor Safety

i

Enclosures :

1.

Notice of Violation

2. . Inspection Report

No.50-255/86005(DRS)

cc w/ enclosures:

Mr. Kenneth W. Berry, Director

Nuclear Licensing

J. F. Firlit, General Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Cemmission

Nuclear Facilities and

Environmental Monitoring

Section

l

.

'

!

4

RIII

I

RIII

RIII

RIII

.h

h

h

j

Hare /mab

P

ips

Burgess

Hehl

P

tello

'

04/10/86

g\\n\\$p

q g pp

i

L_.

j