Text
C
h/b f
8
February 21, 1986-
.
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post-Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the' routine safety inspection conducted by Messrs. T. M. Tongue
M. J. Farber, and W. J. Kropp of this office on December 1, 1985 through
-February 1, 1986, of activities at the Braidwood Station, Units 1 and 2,
authorized by NRC Construction Permits No. CPPR-132 and No. CPPR-133 and to
the discussion of our findings with Mr. E. Fitzpatrick and others of your
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.
W. S. Little, Director
Braidwood Project
Enclosure:
Inspection Report
No. 50-456/85057(DRP);
No. 50-457/85053(DRP)
See Attached Distribution
lb
ylke/mj
Farber
Gar ner
Little
g/ l6
- \\@
/ll
W
l
B602270185 860221
[(
ADOCK 05000456
(
_ __ _ __ - _ _ _ _______ __ _ _ _ _ _ _ _ ___ _ _ _ __ _ __ _ _ F ___ _ __ _ ___ _ __ P D R _ ___ _ _ -l C. O j
__j
-
(,
a
..
Commonwealth Edison Company.
2
February 21, 1986
,
Distribution
cc w/ enclosure:
D. L..Farrar, Director
of Nuclear Licensing-
M. Wallace,. Project Manager
D. Shamblin,-Construction
Superintendent.
HE. E. Fitzpatrick, Station.
Superintendent
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
'
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII_ Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
. D. W. Cassel, Jr., Esq.
J.'W.-McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
-G.1 Berry, ELD
- J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Ca11ihan, ASLB
The Honorable Richard F. Cole, ASLB