ML20205J835

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-425/88-49 on 880822-0901 & Notice of Violation
ML20205J835
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/17/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20205J837 List:
References
RTR-NUREG-1055 NUDOCS 8810310496
Download: ML20205J835 (2)


See also: IR 05000425/1988049

Text

- - - - - - - - - - - - - . . _ - . _ _ _

a 5

Docket No. 50-425

License No. CPPR-109

Georgia Power Company

ATTN: Mr. W. G. Hairstun

Senior Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT N0. 50-425/88-49)

This refers to the Nuclear Regulatory Commission (NRC) review conducted by

M. D. Hunt during August 22 - September 1,1988, which included an inspection

of activities at your Vogtle facility. At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate NRC

requirements. The violation, references to pertinent requirements, and elements to

be included in your response are descrit'ed in the enclosed Notice of Violation.

Your attention is invited to the unrcsolved iten identified in the inspection

report. This matter will be pursued during future inspections,

in accordance with Section 2.790 of the NRC's "Rules of Practice " Part 2, Title 10,

Code of Federal Regulations, a copy of this letter and its enclosure will be placed

in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Papeiwork Reduction Act of 1980. Pub. L. No.96-511.

GS10310406 881017

PDR ADOCE 05000425 i

i.

O PDC

120l

e

o . 00T 171988

,

,

Georgia Power Company 2

Should you have any questions concerning this letter, please contact us.

Sincerely,

9

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

Encl osures:

1. Notice of Violation

2. NRC Inspection Report

ec w/encis:

P. D. Rice, Vice President, Project

Director

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

C. W. Hayes, Vogtle Quality

Assurance Manager

G. Bockhold, Jr., General

Manager Nuclear Operations

J. P. Kane, Manager Licensing

and Engineering

J. A. Bailey, Project Licensing

Manager

B. W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge

D. Kirkland, !!I, Counsel

Office of the Consumer's Utility

Council

D. Feig, Georgians Against Nuclear

Energy

State of Georgia

bcc w/encis:

E. Reis. OGC

l J. Hopkins, NRR

'

M. Sinkule, RI!

DRS Technical As31stant

NRC Resident Inspector

Document Control Desk

/y ,

RI!g] g R!!g

-

RI!

f- J : - / c,g,

l Mb6t Co6 MSinkule

10/g-p /8 1/ t's 10/ /88

l

l

l