ML20205J835
| ML20205J835 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/17/1988 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20205J837 | List: |
| References | |
| RTR-NUREG-1055 NUDOCS 8810310496 | |
| Download: ML20205J835 (2) | |
See also: IR 05000425/1988049
Text
- - - - - - - - - - - - - . . _ - . _ _ _
5
a
Docket No. 50-425
License No. CPPR-109
Georgia Power Company
ATTN: Mr. W. G. Hairstun
Senior Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT N0. 50-425/88-49)
This refers to the Nuclear Regulatory Commission (NRC) review conducted by
M. D. Hunt during August 22 - September 1,1988, which included an inspection
of activities at your Vogtle facility.
At the conclusion of the inspection,
the findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements.
The violation, references to pertinent requirements, and elements to
be included in your response are descrit'ed in the enclosed Notice of Violation.
Your attention is invited to the unrcsolved iten identified in the inspection
report.
This matter will be pursued during future inspections,
in accordance with Section 2.790 of the NRC's "Rules of Practice " Part 2, Title 10,
Code of Federal Regulations, a copy of this letter and its enclosure will be placed
in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Papeiwork Reduction Act of 1980. Pub. L. No.96-511.
GS10310406 881017
ADOCE 05000425
i.
O
i
120l
e
00T 171988
.
o
,
,
Georgia Power Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
9
Alan R. Herdt, Chief
Engineering Branch
Division of Reactor Safety
Encl osures:
1.
2.
NRC Inspection Report
ec w/encis:
P. D. Rice, Vice President, Project
Director
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
C. W. Hayes, Vogtle Quality
Assurance Manager
G. Bockhold, Jr., General
Manager Nuclear Operations
J. P. Kane, Manager Licensing
and Engineering
J. A. Bailey, Project Licensing
Manager
B. W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge
D. Kirkland, !!I, Counsel
Office of the Consumer's Utility
Council
D. Feig, Georgians Against Nuclear
Energy
State of Georgia
bcc w/encis:
E. Reis. OGC
l
J. Hopkins, NRR
M. Sinkule, RI!
'
DRS Technical As31stant
NRC Resident Inspector
Document Control Desk
/y
,
RI!g] g
R!!g
-
RI!
f- J : - /
c,g,
l
Mb6t
Co6
MSinkule
10/g-p /8
1/ t's
10/ /88
l
l
l