Notice of Violation from Insp on 880822-0901.Violation Noted:Bent Sensing Lines & Water Dripping & Causing Corrosion on Case & Sensing Line Fittings
ML20205J853
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/17/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20205J837 List:
References
50-425-88-49, NUDOCS 8810310500
Download: ML20205J853 (2)


Text

'

6 ENCLOSURE 1 NOTICE OF VIOLATION Georgia Power Company Docket No. 50-425 Vogtle Unit 2 License No. CPPR-109 L

During the Nuclear Regulatory Corm 11ssion (NRC) inspection conducted on August 22 - September 1,1988, violation of NRC requirements was identified.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2. Appendix C (1988), the violation is listed I below:

10 CFR 50, Appendix 8 Criterion V, Instructions, Procedures, and Drawings, as supplemented by Vogtle FSAR, Chapter 17 requires that activities affecting quality shall be prescribed by documented instruc-tions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, proce-  ;

Procedure GD-T-17 Housekeeping, requires that dures, or drawings.

permanent plant equipment be protected from damage by construction activities, ensure that materials are not stored on a piece of equipment and take appropriate measures to keep airborne contamination from the equipment.

Contrary to the above, on August 25-26, the inspectors identified bent sensing lines for instruments 2PDT5180 and 2PT1875; water dripping and i causing corrosion on the case and sensing line fittings for instruments 2FT152.2A and 2FT152120; and rags, paper towels and sand paper stored in junction box 2RBE524KSJ56.

This is a Severity Level IV violation (Supplement II).

Pursuant to the provisions of 10 CFR 2.201, Georgia Power Company is hereby required to submit a written statement or explanation to the Nuclear Regulatory {

Commission. ATTN: Document Control Desk, Washington, DC 20555, with a copy to '

the Regional Administrator, Region !!, and a copy to the NRC Resident Inspector, Vogtle Unit 2, within 30 days of the date of the letter transmitting this Noti'e. This reply should be clearly marked as a "Reply to a Notice of Violation" and should include [for each violation): (1) admission or denial of the violation, (2) the reason for the violation if admitted. (3) the corrective l steps which have been taken and the results achieved. (4) the corrective steps [

which will be taken to avoid further violations, and (5) the date when full  ;

compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time. If an adequate reply is not received i within the time specified in this Notice, an order may be issued to show cause e i why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.

i 8810310500 881017 i gDR ADOCK 0500o4;$

PDC

6 Georgia Power Company 2 Docket No. 50-425 Vogtle Unit 2 License No. CPPR-109 Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

FOR THE NUCLEAR REGULATORY COMMISSION lS Alan R. Herdt, Chief Engineering Branch Division of Reactor Safety Dated at Atlanta, Georgia this day of b g88