OCT 131988
Docket Nos.- 50-369, 50-370,
h
50-413, 50-414
License Nos. NPF-9, NPT-17,
l
l
D'
Power Company
I
l
N: Mr. H. B.. Tucker, Vice President
,
l
Nuclear Production Department
i
L
422 South Church Street
t
l,
Charlotte, NC 28242
l
Gentlemen:
SUBJECT:
REPORT N05. $0-369/88-21, 50-370/88-21, 50-413/88-24 AND 50-414/88-24
i
l
The NRC Sy-tematic Assessment of Licensee Performance (SALP) Board has
!
completed its periodic evaluation of your McGuire and Catawba facilities.
i
Catawba and McGuire were evaluated for the period of August 1,1987, through
!
l
July 31, 1988.
The results of the evaluation are documented in the enclosed
l
l
SALP Board Reports.
These reports will be discussed with you at McGuire on
i
i
October 20, 1988, and at Catawba on October 21, 1988.
I
The performance of your McGuire and Catawba facilities was evaluated in the
l
functional areas of plant operations, radiological controls, maintenance /
l
surveillance, emergency preparedness, security, engineering / technical support
l
and safety assessment / quality verification.
l
,
i
1
l
The engineering / technical support and safety assessment / quality verification
categories are new functional areas that have been added to the SALP.
The new
.
categories explore events and problems relative to plant design, modification
implementation, testing and evaluation of problems that occurred during the
l
evaluation period.
Strong management leadership and active participation were evident at both
l
sites, the conduct of activities showed a proper concern for nuclear safety, and
the sites achieved a satisfactory level of operational safety.
L
The Catawba site is maturing as was evidenced by the improvement in operating
performance of Unit One.
However, the high reactor trip rate of Unit Two and
the continuing personnel errors and procedural adherence problems deserve
enhanced management attention. Some equipment problems have persisted and have
contributed to the majority of the reactor trips during the period.
Several
significant maintenance issues identified during this period received the
appropriate level of managcment attention and support, and the corrective
actions taken were effective.
Engineering / technical support is improving and
can contribute to an improvement in overall plant performance.
The site
performance indicator program should improve the overall area by focusing
management attention on problem areas.
$$kNbb
3
i y
0
$W
-
-
-
.
-
-
.-
.--
- - _ _ _
,
'
r.
9*
Duke Power Company
4
00T 131968
The McGuire site has continued its improvement in operation's performance, as
evidenced by the improved capacity factors and reduced forced outage rates for
both units.
Procedural adequacy and compliance problems were still occurring,
but management is pursuing improvement.
The radiological controls area needs
attention particularly in the areas of dose reduction and noble gas levels in
the auxiliary building.
The performance group has made improvement in trending
'
of system and component performance.
The on-line testing of heat exchangers
will greatly enhance the coordination of cleaning / maintenance activities.
Emergency preparedness performance has continued at its high caliber of the
,
last SALP period.
Plant management should better coordinate the technical
staff to assist operations.
Event root cause analysis needs improvement as
corrective actions have been event specific without programatic application.
Any coments you have concerning our evaluation of the performance of your
facilities should be submitted to this office within 30 days following the date
of our meeting at your McGuire and Catawba facilities.
Your coments, a
summary of our plant specific meetings, and my disposition of your comments
l
will be issued as appendices to the enclosed SALP board reports.
,
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincer ly,
Malcolm L. Ernst
'
Acting Regional Administrator
Enclosures:
1.
SALP Board Report - McGuire
2.
SALP Board Report - Catawba
cc w/encls:
r.TIL.McConnell,StationManager
(J' B. Owen, Station Manager
1
State of South Carolina
'
State of North Carolina
bec w/entis:
u hRC Resident inspector
DRS, Technical Assistant
+Rl Hood,NRR
.
i
I
L4. N. Jabbour, NRR
Document Control Desk
h
h5' k
, Bhon/
hies VBrownlee
L eyes
AGibson
ser
Tt
(t.ine
JStohr
J
1
!
10M4/88 10/jt/88 10/ /88
10//1/88
10/tv/88
10gpl88 10/g/88
'
3
- -
.
-
-
- -
- -