ML20205F812
| ML20205F812 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/01/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20205F819 | List: |
| References | |
| NUDOCS 8511130037 | |
| Download: ML20205F812 (2) | |
Text
I' N e lltv)
November 1,1985 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT EXAMINATION REPORT - SC-324/0L-85-02 The NRC administered requalification examinations on September 23-26, 1985, to employees of your company who currently hold licenses to operate the Brunswick Steam Electric Plant. At the conclusion of the written examination, a copy of the exam was left with your staff; at the conclusion of the site visit prelimi-nary findings on the simuator examination were discussed with those members of your staff identified in the Examination Report, Enclosure 1.
A table summarizing the examination results for each examined individual is provided as Enclosure 2.
Copies of the written exanination questions and answer key are included in this report as Enclosure 3.
A Re:calification Program Evaluation is included as Enclosure 4.
Utility comments concerning the written exa.ninations are included as Enclosure 5.
In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1, 3, 4 and 5 will be placed in NRC's Public Document Room. is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, (Original signed by DMVerrelli)
David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects
Enclosures:
(See page 2) 0511130037 051101 ADOCK 050g4 PDR 0
ZEdf l (
-.~.
Carolina Power and Light Company 2
)
Enclosures:
1.
Examination Report 50-324/0L-85-02 1
- 2. - Table of Examination Results (Official Use Only-Privacy Act 3!'
Information) 3.
R0/SR0 Exam Questions and Answer Key 4.
Requalification Program Evaluation 5.
Utility Comments cc w/encls. 1, 2, 4 & 5:
P. W. Howe, Vice President, Brunswick 4
i Nuclear Project j
C. R. Dietz, Plant General Manager r
cc w/encls. 1, 2, 3, 4 & 5:
J. Moyer, Director of Training bec w/encls. 1, 2, 3, 4 & 5:
j Senior Resident Inspector r
bec w/ enc 1. 1, 4 & 5:
Project Manager, NRR State of North Carolina bec w/encls. 1, 3, 4 & 5:
Operator Licensing Brane.h, DHFS,NRR Document Control Desk-I i
I 1
l i
l 1
RII RII RII RII R4I f,unro Ih
'$ h s%
(ch'"Fredrickson K$rockman:bhg
/
10/13/85 f )10/zd/85 AVil son CA u ian 1042r/85 10/30/85 10/31/85