pm Mroy'o, UNITED STATES 4
I,o NUCLEAR REGlfLATORY COMMISSION
- I wAsHWGTON, D. C. 20666
%.....j GFU NUCLEAR CORPORATION AND JERSEY CENTRAL POWER & LIGHT COMPANY DOCKET NO. 50-219 OYSTER CREEK NUCLEAD GENERATING STATION AMENDMENT TO PROVISIONAL OPERATING LICENSE Anerdment No.114 License No. DPR-16 1
1.
The Nuclear Regulatory Cmmission (the Comissicni has found that:
The application for amendment by GPU Nuclear Corporation and A.
Jersey Central Power and Light Company (the licensees) dated November 7,1986, complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act),
and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application,.
the provisiers of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance fil that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (iil that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable reouirements have been satisfied.
8703310253 870320 PDR ADOCK 05000219 P
PDR 1
v l
-p-2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this licerse amendment and Paragraph 2.C.(2) of Provisional Operating License No. I'PR-16 is hereby amended to read as follows:
(2) Technical Specifications The Technical.cpecifications contaired in Appendices A and B, as revised through Amendment No.114, are hereby incorporated in the license. GPU Nuclear Corporation shall operate the ftcility in accordance with the Technical Specifications.
?.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION dac Jonchew,.ir.,Troject Manager 83WR Proiect Directorate #1 Division of BWR Licensing
Attachment:
Cheroes to the Technical Specifications Date of Issuance:
March 20, 1987
n.
ATTACHMENT TO LICENSE AMENDMENT NO. 114 PROVISIONAL OPERATING LICENSE NO. DPR-16 DOCKET fl0. 50-219 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages. The revised pages are identified by the captioned amentrent number and contain vertical. lines indicating the area of change.
PEMOVE INSERT 3.17-4 3.1?-4 3.12-5 3.12-5 3.12-6 3.12-6 3.12-7 3.17-7 3.12-8 3.12-8 3.12-9 3.17-9 3.12-10 3.12-10 3.12-11 3.12-11 3.12-12 4.12-5 4.12-5 4.12-6
G.
Carbon Dioxide (CO2) System 1.
The 4160 Volt Switchgear C02 system shall be operable with a minimum level greater than or equal to 1/2 full and a minimum pressure of 275 psig in the associated storage tank.
2.
With the CO2 system inoperable, within one hour establish a continuous
- fire watch with backup fire suppression equipment.
3.
Restore the system to operable status within 14 days or prepare and submit a Special Report to the Commission, in lieu of any other report required by Section 6.9, within the next 30 days outlining the action taken, the cause of inoperability and the plans / schedule for restoring the system to operable status.
H.
Yard Fire Hydrants and Hydrant Hose Houses 1.
The yard hydrants and associated hose houses listed in Table 3.12.5 shall be operable.
2.
With one or more of the yard hydrants or associated hydrant hose houses shown in Table 3.12.5 inoperable, within one hour have sufficient additional lengths of 2 1/2 inch diameter hose located in an adjacent operable hydrant hose house to provide service to the unprotected area (s) if the inoperable fire hydrant or associated hydrant hose house is the primary means of fire suppression; otherwise, provide the additional hose within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3.
Restore the hydrant or hose house to operable status within 14 days or prepare and submit a special report to the Commission, in lieu of any other report required by l
Section 6.9, within the next 30 days outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the hydrant or hose house to operable status.
I.
Alternate Shutdown Monitoring Instrumentation 1.
The alternate shutdown monitoring instruments listed in Table 3.12-6 shall be operable during reactor power opera-tions and when reactor coolant temperature exceeds 212*F.
2.
With less than the minimum number of operable channels specified in Table 3.12-6, either restore the inoperable l
channel to operable status within 30 days, or be in at least hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in cold l
shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- In those areas which represent a radiation, airborn, or industrial safety hazard; an hourly fire watch patrol will be initiated in lieu of the continuous fire watch.
l OYSTER CREEK 3.12-4 Amendment No.: ES,p$,114
Basis:
Fire Proteqtion systems and instrumentation provide for early detection and rapid extinguishment of fires in safety related areas thus minimizing fire damage. These specifications will assure that in the event of inoperable fire protection equipment, corrective action will be initiated in order to maintain fire protection. capabilities during all modes of reactor operation.
The pumps in the fire water suppression system have a capacity of 2000 GPM each assuring an adequate supply of water to fire suppression systems.
Fire suppression water system operability as defined in 3.12.B.1 applies only as pertains to specification 3.12 and is not applicable to other specifications.
~
Hose stations are provided for manual fire suppression.
In the event that a hose station becomes inoperable, additional fire suppression equipment will be provided.
I' l
{
i OYSTER CREEK 3.12-5 Amendment No.: 79,@@,114
y TABLE 3.12.1 FIRE DETECT.'JN INSTRUMENTATION Fire Required Area / Zone Location Detector Zone
- of Detectors RB-FZ-1A Rx. Bldg. 119' elev.
Sprinkler Sys. #10 1 (WFS) 95' NA 24*
RB-FZ-1B RB-FZ-1C' 75' NA 22*
75' Sprinkler Sys. #11 1 (WFS)
RB-FZ-1D 51' RK01/RK02 2
l 51' 1 - North 6+
51' 2 - North 7+
51' 1 - South 6+
51' 2 - South 6+
RB-FZ-1G 38'/51' Shutdown Pump Rm.
7 RB-FZ-1E 23' 1 - North 7+
23' 2 - North 6+
23' 1 - South 6+
23' 2 - South 6+
a RB-FZ-1F
-19' NA 4 (1 per I
corner room.)
TB-FA-3A 4160 Swgr.** Rm.
Vault "C" 1
TB-FA-3B Vault "0" 1
TB-FZ-11C 4160 Swgr. Rm.
Gen. Area 5
TB-FA-26 4160 Swgr. Rm.
"C" Battery Rm.
1 OB-FZ-4 Cable Spread Rm.
4A-Zone 1 3+
4A-Zone 2 3+
4B-Zone 3 4+
4B-Zone 4 5+
OB-FZ-5 Control Room Gen. Area 6
l A-Zone 1 3+
A-Zone 2 3+
B-Zone 1 7*+
B-Zone 2 7*+
C-Zone 1 1+
C-Zone 2 1+
Duct 1
(l TABLE 3.12.1 FIRE DETECTION INSTRUMENTATION Fire Required Area / Zone Location Detector Zone
- of Detectors OB-FZ-6A 480 Swgr.** Rm.
Zone 3 7+
Zone 4 6+
l OB-FZ-6B 480 Swgr. Rm.
Zone 1 3+
Zone 2 3+
Corridor 2
OB-FZ-8C "A" & "B" Battery Rm. Zone 1 4+
l Zone 2 4+
Zone 4 (Duct) 1+
OB-FZ-8A MG Set Rm.
NA 1 (WFS)
OB-FZ-10A Monitor & Control Area Below Ceiling 2
Above Ceiling 10*
Sprinkler Sys. #12 1 (WFS) g Hallway and Stairway 3
TB-FZ-11E Condenser Bay Sprinkler Sys. #2 1 (P.S.)
TB-FZ-11B Turbine tube Oil Deluge Sys. #3 1 (P.S.)
TB-FZ-11D Turbine Basement South Sprinkler Sys.' 9 1 (WFS)
HT-FA-12 Transformers Deluge Sys. #1 1 (P.S.)
Deluge Sys. #2 1 (P.S.)
i DG-FA-15 Emer. Diesel #1 Thermal 5
L Ionization 1
l FS-FA-16 Fuel Storage Area NA 1
I DG-FA-17 Emer. Diesel #2 Thermal 5
Ignization 1
FW-FA-18 Fire Water Pump Ho*ise NA 4+
OB-FZ-22A UpperCableSpreadj Zone 1 12 (1 WFS)
Room OB-FZ-22B CableBridgeTunne; NA 7 (1 WFS)
OB-FZ-22C NA 7 (1 WFS)
- llo two adjacent detectors may be inoperable.
WFS - Water Flow Switch P.S. - Pressure Switch
+Thesedetectorpactuateautomaticsuppressionsystems se F
OYSTER CREEK 3.12-7 Amendment No.: W M, Q, 114
a TABLE 3.12.2 SPRAY / SPRINKLER SYSTEMS Fire Area Location System RB-FZ-1A Rx. Bldg. 119' elev.
Sprinkler Sys. #10 RB-FZ-1B Rx. Bldg. 75' elev.
Sprinkler Sys. #11 RB-FZ-1D Rx. Bldg. 51'-N Deluge Sys. #5
-S Deluge Sys. $6 i
RB-FZ-E Rx. Bldg. 23'-N Deluge Sys. #7 I
-S Deluge Sys. #8 08-FZ-4 Cable Spread Room Deluge Sys. #4A l
Deluge Sys. #4B OB-FZ-BA MG Set Room Sprinkler Sys. #4 OB-FZ-10A Monitor & Control Area Sprinkler Sys. #12 TB-FZ-11E Condenser Bay Sprinkler Sys. #2 TB-FZ-11B Turbine Lube Oil Bay Deluge Sys. #3 TB-FZ-11D Turbine Basement South Sprinkler Sys. #9 MT-FA-12 Transformers Deluge Sys. #1 Deluge Sys. #2 FW-FA-18 Fire Water Pump House Deluge Sys. #9 OB-FZ-22A Upper Cable Spread Rm.
Sprinkler Sys. #15 OB-FZ-228 & -22C Cable Bridge Tunnels Manual pre-action Sprinkler Sys. #16 i
OYSTER CREEK 3.12-8 AmendmentNo.:/p,pp,88,114
a w
i TABLE 3.12.3 HOSE STATIONS Fire Area / Zone Hose Station No.
Locations TB-FZ-11D 3
Turbine Basement - S TB-FZ-11D 4
Turbine Basement - S TB-FZ-11B 8
Turbine Basement - N TB-FZ-118 -
9 Turbine Basement - N TB-FZ-11E 10 Condenser Bay TB-FZ-11E 11 Condenser Bay TB-FZ-11E i
12 Condenser Bay TB-FZ-11E 13 Condenser Bay RB-FZ-1E 29 Rx Bldg. 23' elev.
RB-FZ-1E 30 Rx Bldg. 23' elev.
RB-FZ-1E 31 Rx Bldg. 23' elev.
RB-FZ-1E 32 Rx Bldg. 23' elev.
RB-FZ-1E 33 Rx Bldg. 23' elev.
RB-FZ-1F3 34 Rx Bldg. -19' elev.
RB-FZ-1F2 35 Rx Bldg. -19' elev.
RB-FZ-1F4 36 Rx Bldg. -19' elev.
RB-FZ-1F1 37 Rx Bldg. -19' elev.
RB-FZ-1D 38 Rx Bldg. 51' elev.
RB-FZ-1D 39 Rx Bldg. 51' elev; RB-FZ-10 40 Rx Bldg. 51' elev.
RB-FZ-1D 41 Rx Bldg. 51' elev.
RB-FZ-1C 42 Rx Bldg. 75' elev.
RB-FZ-1C 43 Rx Bldg. 75' elev.
RB-FZ-1C 44 Rx Bldg. 75' elev.
RB-FZ-1C 45 Rx Bldg. 75' elev.
RB-FZ-1B 46 Rx Bldg. 95' elev.
RB-FZ-1B 47 Rx Bldg. 95' elev.
RB-FZ-1B 48 Rx Bldg. 95' elev.
RB-FZ-1B 49 Rx Bldg. S5' elev.
RB-FZ-1A 50 Rx Bldg.119' elev.
RB-FZ-1A' 51 Rx Bldg.119' elev.
OB-FZ-4 52 Cable Room OB-FZ-5 53 Control Room OB-FZ-10B 54 Chem. Lab.
TB-FZ-110 55 Turbine Basement S OB-FZ-22B 64 Cable Bridge Tunnel OYSTER CREEK 3.12-9 Amendment No.: SS, $$,114
7;..
TABLE 3.12.4 HALON SYSTEM Min. No. of Halon 1301 Sys.
Fire Area location Charged Tanks
- 1. Battery Room A&B OB-FZ-8C Battery Room 1
(Office Bldg.)
Cable Tray Room Chem. Lab.
(Office Bldg.)
- 2. 480 Volt Switchgear OB-FZ-6A 23' elev. between Rx.
Bldg. & Turb. Bldg.
2 08-FZ-6B 23' elev. between Rx.
1 Bldg. & Turb. Bldg.
- 3. Control Room Panels OB-FZ-5 Control Room (A & B) System 1
(C) System 1
OYSTER CREEK 3.12-10 Amendment No.: SS,$$,114
i.
TABLE 3.12-5 HYDRANTS AND HOSE HOUSES Hydrant No.
Hose House No.
Location 3
5 Diesel Gen &
Transformer Area 2
2 Intake Structure t
k i
l l
l l
OYSTER CREEK 3.12-11 Amendment No.: 29, AB,114 7
i
ff C
{
TABLE 3.12-6 ALTERNATE SHUTDOWN MONITORING INSTRUMENTATION Readout Min. Channels Functional Unit.
Location Operable Reactor Pre.ssure RSP 1
Reactor Water Level (fuel zone)
RSP 1
Condensate Transfer Pump Discharge Press Local 1
Condensate Storage Tank Level Local 1
Service Water Pump Discharge Press Local 1
Control Rod Drive Sys Flow Meter Rx 51', below RK02 1
Shutdown Cooling System Flowmeter RK05 1
Isolation Condenser "B" Shell Water Level RSP 1
Reactor.lldg. Closed Cooling Water Pump Discharge Pressure Local 1
l l
RSP-Remote Shutdown Panel l
OYSTER CREEK 3.12-12 Amendment No.: 114 l
l
y c.
At least once per 12 months by:
1.
Conducting a hose hydrostatic test and a pressure at least 50 psig greater than the maximum pressure available at any yard fire hydrant.
2.
Inspecting all the gaskets and replacing any degraded gaskets in the couplings.
3.
Performing a flow check of each hydrant to verify its operability.
I.
Alternate Shutdown Monitcring Instrumentation 1.
Each of the alternate shutdown monitoring channels shall be demonstrated operable by performance of the channel check and channel calibration operations at the frequencies shown in Table 4.12-1.
Basis:
Fire Protection systems are normally inactive and require periodic examination and testing to assure their' readiness to respond to a fire situation.
These specifications detail inspections and tests which will demonstrate that this equipment is capable of performing its intended function.
t i
l l
t I
i l
l OYSTER CREEK 4.12-5 Amendment No.: R$,114
sm y
9 TABLE 4.12-1 ALTERNATE SHUTDOWN MONITORING INSTRUMENTATION Channel Channel Functional Unit.
Check Calibration Reactor Pressure M
Q Reactor Water Level (fuel zone) n/a Q
i Condensate Transfer Pump Discharge Pressure M R
Condensate Storage Tank Level M
R Service Water Pump Discharge Pressure M
R Control Rod Drive Pump Flowmeter M
R Shutdown Cooling System Flowmeter n/a R
Isolation Condenser "B" Shell Water Level M
R Rx. Bldg. Closed Cooling Water Pump Discharge Pressure M
R l
l M - Monthly Q - Quarterly R - Refueling outage OYSTER CREEK 4.12-6 Amendment No.: 114 t
.