Forwards Insp Repts 50-338/86-07 & 50-339/86-07 on 860317-21 & Notice of Violation.Civil Penalty Re Excess Dose Rates on External Surface of Package Not Proposed Based on Good Operating Performance
ML20205E919
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/08/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20205E923 List:
References
NUDOCS 8608190035
Download: ML20205E919 (3)


See also: IR 05000338/1986007

Text

'

,

I.

.

.

AUG 081986

Docket Nos. 50-338 and 50-339

License Nos. NPF-4 ard NPF-7 -

EA 86-76

rginia Electric and Power Company

ATTN: Mr. W. L. Stewart, Vice President,

Nuclear Operations '

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-338/86-07 AND 50-339/86-07)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted on

March 17-21, 1986, at the North Anna Power Station, Mineral, Virginia. This

inspection included a review of the circumstances surrounding the shipment of a

used demineralizer vessel with dose rates on the external surface of the package

in excess of regulatory limits. This inspection verified the events and circum-

stances as previously reported by the licensee, and accordingly, an Enforcement

Conference was held in the Region II Office on April 9, 1986, to discuss this

matter. ~

-k

-  :@r.iorrto shipment, radiation

During

surveysthe Enforcement

showed Conference,

that the you statedJijN$.h,e

dose rate one inch fr'in"t

o surface of the demineralizer

vessel was 200 millirem per hour but that the geometry of the measurement was

poor. Upon arrival at its destination 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> later, dose rates were found to

be in excess of 200 millirem per hour by the recipient which was later confirmed

by members of your own staff. You stated at the Enforcement Conference that the

cause-of this event was the survey technique used and supervisory judgmental

error in shipping a package that had radiation levels at the regulatory limit.

,

'

In accordance with the " General Statem'ent of Policy and Procedure for NRC

l

Enforcement Actions," 10 CFR Part 2, Appendix C (1986), the first violation

i

described in the enclosed Notice has been classified as a Severity Level III

violation. Normally, a civil penalty is considered for a Severity Level III

However, after consultation with the Director, Office of Inspcction

,

! violation.

, and Enforcement, I have decided that a civil penalty will not be proposed $r. this .

I case because of your generally good operating performance.

I

8608190035 860808 '

PDR ADOCK 05000338

G PDR

CERTIFIED MAIL

RETURN RECEIPT REQUESTED

.

.. . .

. .

. .

. .

,

.

.

.

Notice of Violation - 2-

Pursuant to the provisions of 10'CFR 2.201, Virginia Electric and Power Company

is hereby required to submit to this office within 30 days of the date of the

letter transmitting this Notice a written statement or explanation in reply

including for each alleged violation: (1) the reason for the violation if admitted,

(2) the corrective steps that have been taken and the results achieved, (3) the

corrective steps which will be taken to avoid further violations, and (4) the

date when full compliance will be achieved. Where good cause is shown,

consideration will be given to extending the response time.

FOR THE NUCLEAR REGULATORY COMMISSION

ORIGINAL SIGNED BY:

J. NELSON GRACE

^

J. Nelson Grace

Regional Administrator

Dated at Atlanta, Georgia

thisG3 day of August 1986

,

N

e -- - - - - - - - - . -- n - , , ., -- ,

' '

-

.

Virginia Electric and Power Company -3- !G 081986

Distribution

PDR

LPDR *

,

ACRS

CA

SECY

JMTaylor, IE

RVollmer IE

JNGrace, RII

JAxelrad. IE

RGoldsmith, IE

JLieberman, ELD

Enforcement Coordinators

RI, RII, RIII, RIV RV

LCobb, IE

FIngram, PA

BHayes, OI

SConnelly, OIA

JCrooks, AE00

DNussbaumer, OSP

EA File

ES File

EDO Rdg File

DCS

Resident Inspector

b

'

.

/

IE S ELD RII ES:Dh

RGoldsmith JLieberman JNGrace Axelrad mer

IE$f

5//>/86 5/ /, /86 5/ta/86 5/i3/86 JTag/86

itr

/g/86 5

RIT h RII RII RII

JPSt hr LAR es GRJenkins RDWalker

_

05/gN86

<

05/g /86 05/ /86 05/ /

1;

.

.

g-

q,

p, m4

_

mgg/8/

,

m1/

mm/4vb

l e,p;e e,e/ee e<1 ee

i

_ . _ -- -

- - - - - - - - -