1
- p
- hh liarch' 26, 1999 V
Mr.'C. Randy Hutchinson Vice President, Operations ANO
'Entergy Operations, Inc.
~ 1448 S. R. 333 -.
s Russellville, AR 72801
SUBJECT:
USE OF ASME CODE, SECTION IX, CODE CASES 2142-1 AND 2143-1, ARKANSAS NUCLEAR ONE, UNIT 2 (TAC NO. MA3588)
Dear Mr. Hutchinson:
s By letter dated September 9,1998 (2CANO99804),' Entergy Operations, Inc. requested approval under the provisions of 10 CFR 50.55a9a(a)(3)(i) to use American Society of Mechanical
- Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section IX, Code Cases 2142-1
- and 2143-1 for the reactor coolant system for Arkansas Nuclear One, Unit-2.
' The staff has completed its review of the relief request and has determined that the proposed alternative to employ the alternative welding materials of Code Case 2142-1 and 2143-1 provides an acceptable level of quality and safety. Therefore, the staff concludes that the
. proposed alternative is authorized pursuant to 10 CFR 50.55a(a)(3)(i). The use of Code Cases
- 2142-1 and 2143-1 is authorized until such time as the Code Cases are approved by reference
. In Regulatory Guide (RG) 1.85. At that time, if Entergy Operations, Inc. Intends to continue to implement these Code Cases, Entergy Operation, Inc. is to follow all provisions in Code Cases
. 2142-1 and 2143-1 with limitations issued in RG 1.85, if any. Our Safety Evaluation is enclosed.
Sincerely,
( George F. Dick, Acting Director Project Directorate IV-1 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-368
Enclosure:
Safety Evaluation cc w/ encl: See next page
- DISTRIBUTION:
4 Docket File?
PUBLIC PD4-1 r/f G. Dick L. Berry K. Brockman, RIV M. C. Nolan T. Harris (TLH3) 7 OGC
.ACRS E. Adensam (EGA1) G. Hill (2)
D.Lange-S. Coffin Document Name: G:\\ANO2FINA\\RELMA358.WPD
- See Previous Concurrence OFC-PM/PD4-1 LA/PD4-1 EMCB*
OGC*
(A)D/PD4-1 ESullivan MYoung GDich 8
NAME CNola$/vw kBerryh DATE J /85/99 3/N99 2/18/99 3/05/99 3/
9 hNO hO COPY YES/NO YES/NO YES/NO OFFICIAL RECORD COPY 9904020210 990326 PDR ADOCK 05000368 gg
{,,{
P PDR
r pre g
i UNITED STATES s
j NUCLEAR REGULATORY COMMISSION l
2 WASHINF 'ON, D.C. 20666 4 001 to n qyg #
%,, p March 26, 1999 i
l Mr. C. Randy Hutchinson Vice President, Operations ANO Entergy Operations, Inc.
1448 S. R. 333 Russellville, AR 72801
SUBJECT:
USE OF ASME CODE, SECTION IX, CODE CASES 2142-1 AND 2143-1, ARKANSAS NUCLEAR ONE, UNIT-2 (TAC NO. MA3588)
Dear Mr. Hutchinwon.
By letter dated September 9,1998 (2CAN099804), Entergy Operations, Inc. requested approval under the provisions of 10 CFR 50.55a9a(a)(3)(i) to use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section IX, Code Cases 2142-1 and 2143-1 for the reactor coolant system for Arkansas Nuclear One, Unit-2.
The staff has completed its rev ew of the relief request and has determined that the proposed alternative to employ the alternative welding materials of Code Case 2142-1 and 2143-1 provides an acceptable level of quality and safety. Therefore, the staff concludes that the proposed alternative is authorized pursuant to 10 CFR 50.55a(a)(3)(i). The use of Code Cases 2142-1 and 2143-1 is authorized until such time as the Code Cases are approved by reference in Regulatory Guide (RG) 1.85. At that time, if Entergy Operations, Inc. intends to continue to implement these Code Cases, Entergy Operation, Inc. Is to follow all provisions in Code Cases 2142-1 and 2143-1 with limitations issued in RG 1.85, if any. Our Safety Evaluation is enclosed.
Sincerely, WW George F. Dick, Acting Direct Project Directorate IV-1 l
Division of Licensing Project Management Office of Nuclear Reactor Regulation l
1 D?cket No. 50-368 j
Enclosure:
Safety Evaluation j
l cc w/ encl: See next page i
1 l
lN
.a Mr. C. Randy Hutchinson Entergy Operations, Inc.
Arkansas Nuclear One, Unit 2 cc:
Executive Vice President Vice President, Operations Support
& Chief Operating Officer Entergy Operations, Inc.
Entergy Operations, Inc.
P. O. Box 31995 P. O. Dox 31995 Jackson, MS 39286 1995 Jackson, MS 39286-199 Wise, Carter, Child & Caraway Director, Division of Radiation P. O. Box 651 Control and Emergency Management Jackson, MS 39205 Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867-Winston & Strawn 1400 L Street, N.W.
Washington, DC 20007 ' '2 Manager, Rockville Nuclear Licensing Framatone Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400
)
Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthocse Russellville, AR 72801