Forwards Amend 79 to License DPR-61 & Safety Evaluation. Amend Revises Administrative Sections in Chapter 6 & Adds New Reporting Requirements Consistent w/10CFR50.72 & 50.73 & New Containment Isolation Valve to Tech Specs
ML20205D276
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/06/1986
From: Frank Akstulewicz
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20205D280 List:
References
NUDOCS 8608150319
Download: ML20205D276 (4)


Text

-

% UNITED STATES O h NUCLEAR REGULATORY COMMISSION h

=

j WASHINGTON, D. C. 20555 e

k / August 6,1986 i

Docket No. 50-213 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

ADMINISTRATIVE AND REPORTING REQUIREMENT TECHNICAL SPECIFICATION CHANGES Re: Haddam Neck Plant The Counission has issued the enclosed Amendment No. 79 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendment is in response to your application dated May 2, 1983, July 9, 1985, August 13 and August 15, 1985, and a meeting sumary dated June 10, 1986.

In general, this license amendment revises many administrative sections in Chapter 6, adds new reporting requirements consistent with 10 CFR 50.72 and 10 CFR 50.73 and adds a new containment isolation valve to the plant technical specifications.

By letter dated August 15, 1985, Connecticut Yankee Atomic Power Company (CYAPCO) summarized all changes in a composite submittal. This letter also withdrew a proposed change to the definition of containment integrity. The proposed changes to incorporate post-accident instrumenta-tion into the technical specifications were previously addressed in l

Am ndment 66 to the licensee, but are included with this amendment package

! because the references to the reporting requirements have been revised.

By letter dated June 3, 1986, CYAPC0 withdrew a proposed change to revise the schedule for removal of the reactor vessel surveillance capsules.

With the issuance of this amendment package, all outstanding licensing actions associated with the referenced applications are completed.

Notices of Consideration of Issuance of Amendment to License and Proposed No Significant Hazards Consideration Determination and Opportunity for Hearing related to the requested actions were published in the Federal /

Resister on October 26, 1983 (48 FR 49581), August 14, 1985 (50 FR 32791),

anc. July 2, 1986 (51 FR 24252). No comments or requests for hearing were received.

!bbDO P

[

August 6 '1986 Mr. John F. Opeka A copy of our related Safety Evaluation is enclosed. This action will appear in the Commission's biweekly notice publication in the Federal Register.

Sincerely, Original signed by: F. Akstulewicz Francis M. Akstulewicz, Jr Integrated Safety Assessment Project Directorate Division of PWR Licensing - B

Enclosures:

1. Amendment No. 79 to DISTRIBUTION License No. DPR-61 C' Docket File ESE
2. Safety Evaluation NRC PDR Local PDR cc w/ enclosures: ISAP Reading See next page FMiraglia CGrimes PAnderson FAkstulewicz OELD-0GC LHarmon EJordan BGrimes JPartlow TBarnhart WJones ACRS(10)

OPA LFMP MBoyle AWang i .

ISAP:DPL-B IS B ISA -B D

! FAkstulewicz:mn PAi on CGrimes l 7 /g/86 7//d/86 $/tf/86 7/t /86 yawca,y%

l

- - . . _ . _ . . _ . _ _ _. .- . . _ _ _ _ _ . _ = . , _ . _ . . _ - , , .

Mr. John F. Opeka A copy of our related Safety Evaluation is enclosed. This action will appear in the Comission's biweekly notice publication in the Federal Register.

Sincerely, A&!ttd> Y-Francis M. Akstulewicz Integrated Safety Assessment Project Directorate Division of PWR Licensing - B

Enclosures:

1. Amendment No. 79 to License No. DPR-61
2. Safety Evaluation cc w/ enclosures:

See next page l

Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:

Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Supervisor RDF #1 Operating Nuclear Plant Licensing Post Office Box 127E Northeast Utilities Service Company East Hampton, Connecticut 06424 Post Office Box 270 Hartford, Connecticut 06141-0270 Edward J. Mroczka

Vice President, Nuclear Operations
  • Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I l U.S. Nuclear Regulatory Comission l 631 Park Avenue l King of Prussia, Pennsylvania 19406 i

i l

. . _ . .. . __ __.