ML20205C233

From kanterella
Jump to navigation Jump to search
Discusses Quality Verification Function Insp Rept 50-482/88-200 on 880916 & Forwards Notice of Violation. Preparation to Discuss Potential Enforcement Finding Noted in Rept & Item from Earlier Insp Rept at Meeting Requested
ML20205C233
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/19/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20205C239 List:
References
NUDOCS 8810260427
Download: ML20205C233 (2)


See also: IR 05000482/1988200

Text

_ _ _ - _ _ _ _ _ _ _ _ _ _ _ -

-

,

a .

In Reply Refer To: OCT I 91988

Docket: STN 50-482/88-200

Wolf Creek Nuc7 ear Operating Corporation

ATTN: Bart D. Withers

President and Chief Executive Officer

P.O. Box 411

Burlington, Xansas 66839

Gentlemen:

This refers to the Quality Verification Function Inspection (QVFI) team

inspection conducted during the period June 6-17, 1988. The inspection team

findings were documented in NRC Inspection Report 50-482/88-200, dated

September 16, 1988.

Following further evaluation of the potential enforcement findings (PEFs)

ide.itified in the NRC inspection report, it was determined that certain of your -

activities were in violation of NRC requirements. Consequently, you are

required to respond to these violations, in writing, in accordance with the

provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2 Title 10

Code of Federal Regulations. Your response should be based on the specifics

contained in the Notice of Violation enclosed with this letter.

One of the potential enforcement findings of the QVFI report (Item

No. 88-200-8) is not included in the appended Notice of Violation. .

Additionally, with respect to potential enforcement finding 88-200-1a, it is

stated in the QVFI report that the issue is also addressed in NRC Region IV

Inspection Report 50-482/88-19 and will be followed up by Region IV. You are

requested to be prepared to discuss all aspects of these two items with Region IV

staff at a fu'ure meeting. You will be contacted shortly to arrange a mutually

acceptable tirre for the meeting.

The response directed by this letter and the accompanying Notice is not subject '

to the Paperwork Reduction Act of 1380, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

'

Sincerely,

Odginal Signed By

n A. B. Denh

L. J. Callan, Director

o@8 Division of Reactor Projects

o.

$6 Enclosure:

g, Appendix - Notice of Violation i

No

38 cc w/ enclosure: (see next page)  !

  • RIV:RI *C:0PS C:PS *D:DRS D:DRP C

53 DRHunter/ld JEGagliardo TStetka JLHilhoan LJCallan "Of

ho / /88 / /88 (o/f/88 / /88 W/ti/88

  • previously concurred.

_ - _ _ - _ .

o .

.

'

. . .

Wolf Creek Nuclear Operating ~ -2-

Corporation

Wolf-Creek Nuclear Operating Corporation

ATTN: Otto Maynard, Manager

of Licensing

P.O. Box 411

Burlington, Kansas 66839

Wolf Creek Nuclear Operating Corporation

ATTN: Gary Boyer Plant Manager

P.O. Box 411

Burlington, Kansas 66839

l Kansas Corporation Commission

ATTN: Robert D. Elliott, Chief Engineer

Fourth Floor. Docking State Office Building

Topeka, Kansas 66612-1571

. Kansas Radiation Control Program Director

bectoDMB(IE01)

l

bec distrib. by RIV:

l

,

l RRI R. D. Martin, RA

l SectionChief(DRP/A) DRP

RPB-DRSS B. DeFayette, RIII

l

RIY File SRI, Callaway, RIII

MIS System RSTS Operator

l Project Engineer. DRP/A Lisa Shea, RM/ALF

P. O'Connor, NRR Project Manager

DRS Gary M. Holahan, NRR

R. P. Correia. NRR F. C. Hawkins, NRR

S. H. Weiss, NRR J. Gagliardo

D. Hunter G. Sanborn

l

,

l

l

l

l

l

t--