MAR I T Igg
In Reply Refer To:
Docket:
50-382/86-28
Louisiana Power & Light Company
4
ATTN:
J. G. Dewease, Senior Vice President
Nuclear Operations
N-80
i
317 Baronne Street
New Orleans, Louisiana
70160
Gentlemen:
This refers to the inspection conducted by Mr. J. R. Boardman of this office
and two consultants during the period November 17-21, 1986, of activities
authorized by NRC Operating License NPF-38 for Waterford Steam Electric
Station, Unit 3, and to the discussion of our findings with you and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included the Waterford Steam Electric
Station maintenance program, and implementation of the maintenance program in
the electrical, instrumentation and control and mechanical disciplines. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
NRC inspector. The inspection findings are documented in the enclosed
inspection report.
During this inspection, it was found that certain of your activities were in
l
l
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
f
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter, and should include your actions
to assure that the identified procedural inadequacies have not adversely
[
affected equipment and systems that could affect nuclear safety.
We have also examined actions you have taken with regard to previously
[
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
'
fIs/
RIV:RSB/0
C:05@
- RP
C:RSB
- RP8
'
JRBoardma
DMHunnicutt
L
table
gtTFWesterman
JEGagli
o
3 //3 /87
3 /S /87
/g/87
() 3 /s/87
3 // yf87
r
0703300032 870317
[I l
ADOCK 05000382
'
O
_
.
. . .
...
.
..
. .
..
. ..
.
..
..
.
. . . . . . . ..
.
.
Louisiana Power & Light Company
-2-
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-382/86-28
cc w/ enclosures:
Louisiana Power & Light Company
ATTN:
G. E. Wuller, Onsite
Licensing Coordinator
P. O. Box B
Killona, Louisiana
70066
Louisiana Power & Light Company
ATTN:
N. S. Carns,-Plant Manager
R
P. O. Box B
Killona, Louisiana
70066
Middle South Services
ATTN: Mr. R. T. Lally
P.-0. Box 61000
New Orleans, Louisiana
70161
Louisiana Power & Light Company
ATTN:
K. W. Cook, Nuclear Support
and Licensing Manager
317 Baronne Street
P. O. Box 60340
New Orleans, Louisiana
70160
Louisiana Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- RPB
- D. Weiss, RM/ALF
- RRI
R. D. Martin, RA
- Section Chief (RPB/C)
DRSP
- R&SPB
- RSB
- MIS System
- Project Inspector
- RSTS Operator
- R. Hall
- RIV File
- w/766
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_