ML20205A370

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-295/86-16 & 50-304/86-15 on 860709-10 & 29.No Violation Noted.Review of Impact of Discrepancies Found in Field Installed Raychem Splices Underway
ML20205A370
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/07/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20205A373 List:
References
NUDOCS 8608110356
Download: ML20205A370 (2)


See also: IR 05000295/1986016

Text

.

.AUG 7 1986

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. A. Gautam of this

office on July 9,10, and 29,1986, of activities at Zion Nuclear Power Station

authorized by NRC Licenses No. DRP-39 and No. DPR-48 and to the discussion of

our findings with Mr. George Plim1 on July 10, 1986, and with Mr. T. Printz on

July 29,1986 at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection; however, an ongoing NRC review is being performed to evaluate the

impact of discrepancies found in field installed Raychem splices.

In accordance with 10 CFR 2.790 of the Commission's regulations, a co)y of

this letter and the enclosed inspection report will be placed in the iRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by J. J. Harrison

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Reports

No. 50-295/86016(DRS);

No. 50-304/86015(0RS) 8@$sigggg gggggy 5

G PDR

See Attached Distribution

RIII RIII R [

e.(/kst .m

Gautam

.-

Muffett

w/.t

v rrison

eA/ec We6 @' 8'

4

N M O/

_ _ _ - _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

.

Commonwealth Edison Company 2 Ai}G 7 1986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

G. J. Plim1, Station Manager

JanNorris,ProjectManager,NRR

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

Mayor, City of Zion

J

,

I

i