Public Version of Emergency Plan Implementing Procedures, Including Rev 6 to EPIP-03, Notification of Unusual Event Implementing Actions & Rev 5 to EPIP-05, Site Area Emergency Implementing Actions
ML20205A237
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/11/1985
From: Poge R
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17298C071 List:
References
PROC-850311, NUDOCS 8504250462
Download: ML20205A237 (123)


Text

~-

L

.- CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN o

[ROCEDURE IMPLEMENTING PROCEDURE EPIP-03 NOTIFICATION OF UNUSUAL EVENT IMPLEMESTING ACTIONS 6 Page 1 of 22 A' SSIGNED COPY 383 PVNGS #- 9;-40 '

O

"!P"!88M 8!888?ao F PDR DEPT. !!EAD [ /]iU. 7 AL [ (([ (N/ DATE $ Y Ih PRB/PRG/TRRG REVIEW / ///. ///(([ DATE $[

APPROVED BY f ,e [hf' ((( DATE 9 7 O w ec w E DA W ' o u :a DN-1598A/0787A Pv216 OCOA 18 th CONTROLLED DOCUMENT

CONTROLLED DOCUMENT l .-

i s

i PVNGS EMERGENCY PLAN j p IMPLEMENTING PROCEDURE

[ROCEDURE o

3 I

d REVISION EPIP-03 1 NOTIFICATION OF UNUSUAL

.j - EVENT IMPLEMENTING ACTIONS 6 Page 2 of 22 i

i REVISION HISTORY Rev. No. Date i

Revised Pages Comments 5 12-18-84 _ Complete Revised Appendices and i

4

)

.cs. s\< s^'j N __ Callouts l 6 f.1/erf65 @ys; Complete l _ Incorporated PCN's (101 & 02 I

I 2

of Rev. 5 Revised Appendices l and Callouts, 4

l i

4 l

l 1

i i

{

i i

l t

l i

4 j l

' PY296 000 A #4 82) 4 CONTROLLED DOCUMENT i

-.~..-.-....,_--__,,__-...._,.-.._-..,____.,C_L...._!._,___.,..__._..,,__.,_,_,_-.-- .._ .- _-r,-~ , - -

9 CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN

( Qcame IMPLEMENTING PROCEDURE EPIP-03 NOTIFICATION OF UNUSUAL EVENT IMPLEMENTING ACTIONS 6 Page 3 of 22 TABLE OF CONTENTS SECTION PAGE NUMBER 1.0 OBJECTIVE 4

2.0 REFERENCES

4 3.0 LIMITATIONS AND PRECAUTIONS 4

4.0 DETAILED PROCEDURE 5

4.1 4.2 Personnel Indoctrination / Responsibilities Prerequisites 5 4.3 Instructions 5 5

%)

APPENDICES Appendix A - Emergency Notification Call List - Emergency Coordinator /STSC Communicator 9

Appendix B - Emergency Notification Call List - PVNGS Security 10 Appendix C - Initial Emergency Message Form 11 Appendix D - Follow-up Emergency Message Form 12 Appendix E - Instructions for Completing Appendix C or D

  • 15 Appendix F - Notification Alert Net.Jork (NAN) Radio Bcckup 4 18 Appendix G - Protective Action Recommendations 20 Appendix H - Emergency Coordinator Checklist 21

\

me ooon is sa CONTROLLED DOCUM.E.NT

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN l

n QCsoune

\ /

I IMPLEMENTING PROCEDURE EPIP-03 v

NOTIFICATION OF UNUSUAL REVISION EVENT IMPLEMENTING ACTIONS 6 Page 4 of 22 1.0 OBJECTIVE 1.1 This procedure provides a series of implementing actions to be taken upon declaration of a NOTIFICATION OF UNUEUAL EVEhT .

2.0 REFERENCES

2.1 Implementing References

, b 2.1.1 EPIP-02, " Emergency Classification" 2.1.2 EPIP-11. " Technical Support Center / Satellite TSC Activation" 2.1.3 EPIP-22, " Personnel Injury",

2.1.4 EPIP-23, " Fire Fighting" O)

\

\d 2.1.5 71AC-9ZZ01, " Event Related Reporting" 2.1.6 78AC-0ZZ06, " Document and Record Turnover Control" 2.2 Developmental References 2.2.1 NUREG-0654 Rev. 1, " Criteria for Preparation and Evaluation of Radiological Support Errergency of Nuclear Response Plans and Preparedness in Power Plants".

2.2.2 PVNGS Emergency Plan, Rev. 5 3.0 LIMITATIONS AND PRECAUTIONS 3.1 Continued surveillance and assessment of plant conditions are necessary to ensure that the emergency classification is information is obtained. appropriately revised as conditions change or more O  !

~ _. .n CONTROLLED DOCUMENT

_ _ . _ 1

. :, ~ < - , .

,.. w s .

l l [ .l CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN O

V' IMPLEMENTING PROCEDURE *

[ROEDURE EPIP-03 NOTIFICATION OF UNUSUAL EVENT IMPLEMENTING ACTIONS 6 Page 5 of 22 4.0 DETAILED PROCEDURE 4.1 Personnel Indoctrination / Responsibilities 4.1.1 In a NOTIFICATION OF UNUSUAL EVENT situation, time is available to take precautionary and constructive steps to ,

prevent a more serious event and/or to mitigate any consequences that may occur. This event status places the plant in a readiness position for possible cessation of routine activities and/or augmentation of onshift resources.

No releases of radioactive material requiring offsite response are expected. Appropriate notification of NRC and state / county authorities is made.

4.1.2 The Shift Supervisor shall be responsible for initiating this procedure.

The Emergency Coordinator shall be responsible for completing the implementing actions of this procedure.

4.2 Prerequisites v

4.2.1 The emergency has been classified per EPIP-02, " Emergency Classification."

4.3 Instructions 4.3.1 The affected unit Shift Supervisor shall perform the following:

. NOTE Designated Unaffected Unit Shift Supervisor to assume the role of the Emergency Coordinator in the _Onshift Emergency Organization are:

Affected Unit Unaffected Unit Shift Supervisor Unit 1 Unit 2 Unit 2 Unit 1 Unit 3 Unit 2 Entire Site Unit 1 0

~ ~ * " '

CONTROLLED DOCUMENT

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE m IMPLEMENTING PROCEDURE N O.

( ) EPIp 03 v' REVISION NOTIFICATION OF UNUSUAL EVEhT IMPLEMENTING ACTIONS 6 Page 6 of 22 4.3.1.1 Notify unit the Shift Supervisor of the designated unaffected (or Shift Supervisor of an unaffected unit) to report to the Control Room of the affected unit and assume the duties of the onshift Emergency Coordinator.

For notification of unusual events, it will be at the discretion of the affected unit Shift Supervisor if he ,

is to be relieved as Emergency Coordinator by the shift supervisor of an unaffected unit.

4.3.1.2 Announce the G (phone no. K and the site warning siren /public addr system:

"A'ITENTION ALL PERSONNEL - A NOTIFICATION OF U EVENT HAS BEEN DECLARED.

SATELLITE TECHNICAL SUPPORT CENTER FOR UNIT AND, REPORT OPERATIONS SUPPORT CENTER EMERGENC TO.YOUR EMERGENCY STATION.

ex OTHER STANDBY. PERSONNEL ASSIGNED TO THE EMERGENCY ORGAN

) ALL OTHER PERSONNEL CONTINUE WITH NORMAL ROCTINE UNTIt. FURTHER NOTICE".

(Give a brief description of the event, if appropriate, and repeat the announcement).

NOTE Protective Action recommendations D (Appendix G) are based on plant and containment conditions and these recommendations are made to offsite progress.even when no release is in officials 4.3.1.3 Direct the Satellite TSC Communicator to fill out Appendix C, " Initial Emergency Message Form", in accordance with instructions provided in Appendix E.

4.3.1.4 Notify the Control Rooms of the unaffected units.

4.3.1.S Ensure have beentheimplemented.

actions of the appropriate Recovery procedures O j W24 000410 8h l i

.- Y . . - . . , .. - .:

.:' a CONTROLLED DOCUMENT c

PVNGS EMERGENCY PLAN PROCEDURE NO.

) IMPLEMENTING PROCEDURE EPIP-03 x /

NOTIFICATION OF UNUSUAL REVISION EVENT IMPLEMENTING ACTIONS 6 Page 7 of 22 4.3.2 The Emergency Coordinator / Shift Supervisor shall following: e perform th 4.3.2.1 EPIP-11. " Technical Support Center / Satelli Activation". '

.4.3.2.2 t Implement additional Emergency Plan Implementing the emergency being classified as a NOTIFI UNUSUAL EVENT.

4.3.2.3 Determine the need for any additional personnel If needed, additional existing on-shift personnel should be requested by the organization.

4.3.2.4 Direct the STSC Communicator to prepare (n) x /

instructions provided in Appendix E.

4.3.2.5 Reevaluate the emergency classification and perform licensee EPIP-02. actions as conditions change by implementing 4.3.2.6 When the situation warrants downgrading / upgrading a NOTIFICATION OF UNUSUAL EVENT, proceed to appropriate Shift Supervisor to announce the reclassifica e the public Rooms. address system and inform the other Contr o l event. Keep PVNGS Plant Manager informed as to status of 4.3.2.7 The Emergency Appendix H. Coordinator shall complete checklist 4

4.3.3 l PVNGS Security, after being notified by the Emergency Coordinator or STSC Communicator that a NOTIFICATIO Appendix B. " Emergency Notification e t.e Call List -

Security", and notify these individuals or departments situation. e of th l I o

m. am ...,

CONTROLLED DOCUN3ENT  ;

CONTROLLED DOCUMENT

~

PVNGS EMERGENCY PLAN PROCEDURE NO 1 IMPLEMENTING PROCEDURE EPIP-o3 NOTIFICATION OF UNUSUAL EVENT IMPLEMENTING ACTIONS 6 Page 8 of 22 4.3.4 Emergency Situation Terminated 4.3.4.1 Consult with the PVNGS Plant Manager prior to closing out e:ergency.

4.3.4.2 The Shift Supervisor (or Emergency Coordinator) shall

sound the "All Clear" signal for approxiestely (I) minute, silence the signal, and provide the fellowing anne"ncement no. over the plant wide telephone page (phone system:

and the site warning siren /public address

" Attention all personnel, the emergency situation declared in Unit has now been tercinated."

(Provide special instructions as necessary).

4.3.4.3 Repeat signal and announce ent once.

4.3.4.4 Direct the STSC Communicator to tra.seit the tereination of the NOTIFICATION OF UNUSUAL EVENT per Appendix A.

4.3.4.5 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of closecut from the NOTIFICATION OF UNUSUAL offsite EVENT cla*,sification provide a v""*an su==ary to authorities, in accordance with

" Event Related Reporting".

4.3.5 Record Retention 4.3.5.1 Appendices A, E, C, D and H shall be turned over to the E=ergency Planning and Preparedness Dept., cail station 6010, to ensure they are forw d ad

  • DD0 for proper storage in accordance with

'Docu=ent and Record Turnover Control".

i t 1

s

~ ~ " "

t CONTROLLED DOCUMENT . _

l' CONTROLLED DOCUMENT

\

1 l l  !

t i

i PVNGS EMERGENCY PLAN PROCEDURE NO.

6

APPENDIX A IMPLEMENTING PROCEDURE EPIP-03 Page i of 1 i

1 i REVISION NOTIFICATION OF UNUSUAL EVENT IMPLEMENTING ACTIONS l 6 Page 9 of 22 j i

l l

l l

i t

5 d

3 ,

i l'

E.

i -  %

h i

1 1

E

! 3 -

I d  !

E $  !

E!

--  ! 2 s

l .

58 E

! EW t i

'  : a w 52

=0 r i:Oi

=k j ) 9

'! 5 Q.$

E

$$ e 53 2 5 ,

! 3

  • w i g ,- >

i

  • 4
E" 8

! 5 E3 i i:

it

? *g I

  • 56 f*
  • t 11

. t '

s s ; -3:

Et ew *: 2*: , a  !!

sI >! 28 52 >!2 5 -

E "x ~; & ;E E!E E 13 !B ;* T3 aja -b 6 I' I' t

i : $: :I" 1

" wF & a . 2 -: .i h

a at

.* ". .2b Em

.8 1:8

, 8 a

I i

i W 2 a

j ?

o 1 j'

G

$ 2-52 -8: 5: &&  ;" bit j: .!

WW . .. ;

e&

52 2

5

- ;I 2o  ;

0 T.12 i$' 2 a t j32 2. 21.l o# 2 LI & Ji i I EE Y[

4 j

~Z ^ ~ CONTROLLED DOCUMENT

1 I

i R

2 r.

}

l n, i i

T

! a r<z a o jQ! -

VH z

vi o Em m

ni k lO d 4 Zm t sis d!! Z

_Z. 29 58 H lm mm x

! o F

.... _ _ ,,, _ ,,_ c. < t..,. _ ,, _ ...

V- 8

g o8< O r

p Deserweatzingirl#nt o vi mm p==

c.ryo r. . s.c.rs ey tri=ery Linh e ite rn.te_unk ontezties calj er dp Or ,

i

.- m oe CD '

s,.

Of,. c.

0C.

..,.c.... .,,,,

i M' Z Q j

se.cs..r .asins.tr.ts..  !

I Ante c..a.nic.:6.ns*

/

!n iV

... .... _ .., .. c,,....

n ..

c.c.,s,. . _. ..,

...n,,

m om n i C .......... ...,,,, _ ,,,n, _ ,. .,

s m~8 C 3 9 yj 3, m e a= m Z Z

-i -i

~ ~>

4 4 N 09 09 m

@ G tT, 0-* e-*

O sw O ><

O vs l

  • ta txt N ,

N I

_ _ .__ ._- --- ^- '

wn. . su.gg.n

,. c . . mn . =; _:

=

PVNGS EMERGENCY PLAN PROCEDURE h

V O IMPLEMENTING PROCEDURE -

N O.

EPIP-03 APPENDIX C Pag- 1 of 1 REVISION NOTIFICATION OF UNUSUAL.

EVENT IMPLEMENTING ACTIONS 6 Page 11 of 22 INITIAL EMERGENCY MESSAGE FORM NOTIFICATION OF UNUSUAL EVEhT, ALERT, SITE AREA EMERGENCY, OR GENERAL EMERGENCY

1. Verbatim text of Message:

THIS IS (IS NOT) A DRILLt! (Circle One) THIS IS PALO VERDE NUCLEAR GENERATING STATION (NOTIFICAT (ALERT) (SITE AREA EMERGENCY) (GENERAL EMERGENCY) '

(cross out notifications above not applicable) 4 declared at -

- Wind is from degrees - At mph. '

(time) (date) (speed)

PALO VERDE AUTHENTICATOR (authenticator letters) ,

2. This is i Station , at the Palo Verde Nuclear Generating j (name/ title)

{

3. (Circle One)  !

k (a)

There is @ , repeat M , radioactive release taking place and no special protective actions are recommended at this time.

OR (b) There is M, repeat @, radioactive release in excess of allowable operating limits and @ protective actions are recommended at this time.

OR (c) -

There is @ , repeat @ , radioactive release taking place; however, the following protective actions are recommended at this time.

, Sectors Distance (Miles)

OR (d) A radioactive release H , repeat H , taking place. We recommend that people in Sectors affected sectors remain indoors with windows and doors closed.

Distance (Miles)

OR (e) A radioactive release M , repeat M , taking place. We recommend that evacuation of affected sectors be considered.

Sectors Distance (Miles)

,Ds 4.

THIS IS (IS NOT) A DRILL!! (Circle One)

\V) Approved By (SS/EC/EOD) DATE TIME PV216 000A (8.'$2)

CONTROLLED DOCUM.ENT

" 1 2 ? N i l ::. ,... * . .:.b * ~ ' ?# I ' ~ - l } * ~.l "

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE -

NO.

IMPLEMENTING PROCEDURE APPENDIX D EPIP-03 Page 1 of 3 NOTIFICATION OF UNUSUAL EVENT IMPLEMENTING ACTIONS 6 Page 12 of 22 i FOLLOW-UP EMERGENCY MESSAGE FORM .

1. s Verbatim text of Message: THIS IS (IS NOT) A DRILLI! '

THIS IS A PALO VERDE NUCLEAR GENERATING (Circle One) follow-up in STATION '

message concerning the (NOTIFICATION OF UNUSUAL EVENT) n

_ AREA EMERGENCY)

(GENERAL EMERGENCY) (ALERT) (SITE (cross out notifications above not applicable) '

declared at -

(time) (date)

2. This is
  • Station. , at Palo Verde Nuclear Generating (name/ title) '
3. Meteorological Data l

i

a. Wind direction from hour (degrees) - at _ _ miles per

\ -

(direction) (speed) from to (sector) (sector)

b. Stability Class: ABCDEFG (Circle One)
c. Precipitatica Yes. No (Circle One)
4. Radiological Data
a. Radioactvity (check one)

( ) Has been released

( ) Has not been released k

PV2te 0004 (8/82) l CONTROLLED DOCUM.ENT

m  :.. :- ..: .: -

~:L = ~ =s= ~

/2.

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE p NO.

IMPLEMENTING PROCEDURE EPIP-03 APPENDIX D Page 2 of 3 i NOTIFICATION OF UNUSUAL EVENT IMPLEMEhTING ACTIONS 6 Page 13 of 22 *

4. b. Release Time
c. Reactor Trip Time  :

i d.

Location / Source of Release

5. Current Release Rates

~

a. I-131 Equivalent
b. Noble Gas C1/second
c. Particulates C1/second C1/second 6.

Two-hour plume centerline projected dose at:

Distance Sector Whole Body Child Thyroid t Dose (REM) Dose Commitment I

(REM) ,

I t

v Site Boundary t

2 miles 5 miles 10 miles 7.

Plume arrival time offsite:

2 mi 5 mi 10 mi Ruth Fisher School Arlington School 8.

Estimated duration of release minutes

~,,._...,,

CONTROLLED DOCUMENT

= e c a .; a y _.

=

. , __ T:7,9 m ' q= : c - _.

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE - i NO-IMPLEMENTING PROCEDURE APPENDIX D EPIP-03 Page 3 of 3

'v NOTIFICATION OF UNUSUAL EVENT IMPLEMENTING ACTIONS 6 Page 14 of 22 I

9. i The Following Emergency Measures Including Protective Actions are Recommended:
10. The Following Emergency Reponse Actions are Underway:

1 I

L

{

e

11. Sources We Request the Following Onsite Support and Assistance from Offsite

\

12. Our Prognosis of the Emergency is that Conditions:

Are Under Control can Be Expected to Terminate Within hours Are Worsening

13. Other Information:
14. Tl!IS IS (IS NOT) A DRILL!! (Circle One) t

, l n -

Pvt 14 0tCA 14th CONTROLLED DOCUMENT

y. g. #..

c -- ~ .

.' . . .g. , , ;'; _ . :y,q CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

IMPLEMENTING PROCEDURE APPENDIX E (O)

EPIP-03 Page 1 of 3 NOTIFICATION OF UNUSUAL EVENT IMPLEMEhTING ACTIONS 6 Page 15 of 22 INSTRUCTIONS FOR COMPLETING APPENDIX C OR D 1.0 INITIAL EMERGENCY MESSAGE FORM (APPENDIX C) 1.1 Fill in data required by steps 1 and 2 of Appendix C, " Initial Emergency Message Form".

Obtain authenticator from the confidential envelope marked on the outside with the appropriate ,

month and drill sequence number (if it is a drill).

1.2 Obtain requiredfrom the Radiation to complete step 3 ofProtection Appendix C.Monitor (onshift) data .

1.3 Circle appropriate wording of step 4 of Appendix C.

NOTE When the NAN ring button is pushed and it appears that all the receiving stations are on ,

s line, or, the ring has stopped, the PVNGS

'vl originating station shall initiate a roll call ,

in the order listed below. (Consider the time of day.)

NOTE k

If the NAN dedicated telephone fails, refer to Appendix F, " Notification Alert Network (NAN)

Radio Backup" for instruction on using channel

8. KON-511, for notifications.

1.4 By means of a single call on the Notification and Alert Not dedicated telephone, listed in Appendix A.contact the following State / County agencies Duty Hours (8:00 a.m. to 5:00 p.m. Monday-Friday) t Maricopa County Sheriffs Office Maricopa County Department of Civil Defense and Emergency Services Arizona Department of Public Safety Arizona Division of Emergency Services Arizona Radiation Regulatory Agency Off-Duty Hours (5:00 p.m. to 8:00 a.m., Honday-Friday, all day Saturday, Sunday and Holidays)

I

(

V) Maricopa County Sheriff's Office Department of Public Safety me mo4 ae s

CONTROLLED DOCUM.ENT

yy w

,ar:s;, -

u:

~ _ _ _

CONTROLLED DOCUMENT fs PVNGS EMERGENCY PLAN PROCEDURE N O. .

t ') APPENDIX E

'd' IMPLEMENTING PROCEDURE EPIP-03 Page 2 of 3 i

REVISION NOTIFICATION OF UNUSUAL ,

EVENT IMPLEMENTING ACTIONS i 6 Page 16 of 22 l

1.5 I When contact is made, the caller shall identify himself and request that the individuals obtain a copy of the Appropriate Emergency Message Form.  :

I 1.6 When each individual has obtained a copy, read the completed Emergency Message Form verbatim and request MCSO to read back verbatim. ,

, i 1.7  !

Offer to repeat information and reiterate as necessary. I 1.8 i Notify additional personnel as listed in Appendix A as necessary and inform them of the situation. Provide the following message i for the Group _ Paging System Notification /Callout:. ,

"This is PVNGS, Unit , classification ONE, please respond appropriately" (Repeat message ,

once).

p)

(

1.9 If an individual requests information not contained in the [

V' Emergency Message Form, make reasonable efforts to obtain and l give the information only after all _ initial notifications have been made.

1.10 Contact the NRC via the Emergency Notification System (ENS) I dedicated telephone within 60 minutes of declaring an emergency.

If the ENS phone fails, use commercial phone or HPN phone as an alternate line. ,

1.11 t When contact is made, the caller shall identify himself and read the completed Emergency Message Form verbatim (omit the Palo l Verde Authenticator).

  • 1.12 ,

Offer to repeat information and reiterate as necessary.

4 6

m Pv2tS 000A (4 421 CONTROLLED DOCUMENT

- a -

yvac .n

. = +.~ - - - -

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

IMPLEMENTING PROCEDURE

  • APPENDIX E EPIP-03 Page 3 of 3 NOTIFICATION OF UNUSUAL EVENT IMPLEMENTING ACTIONS 6 Page 17 of 22 2.0 1 FOLLOW-UP EMERGENCY MESSAGE FORM (APPENDIX D) .i 2.1 ,

Fill in dataMessage Emergency required by steps 1 and 2 of Appendix D, " Follow-up Form".

2.2 Obtain complete from the3-9.

steps Radiation Protection Monitor data required to ^

I 2.3 i Obtain10-13.

steps from the Emergency Coordinator data required to complete 2.4 Circle appropriate wording in step 14.  !

2.5 i Dispense information when asked by offsite agencies (NRC or ARRA).

{

O y/ i-4 l

PY316 000A (t 62)

CONTROLLED DOCUMENT

, ,,,.,gwn m.,y , , . , ,.  ;

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE G NO- D O IMPLEMENTING PROCEDURE EPIP-03 REVISION APPENDIX F Page 1 of 2 NOTIFICATION OF UNUSUAL EVENT IMPLEMENTING ACTIONS 6 Page 18 of 22 NOTIFICATION ALERT NETOWRK (NAN) RADIO BACKUP CHANNEL 8 - KON511 In the on case of failure PVNGS radio. of the NAN ringdown telephone, the NAN backup is Channel 8'

'KON-511' be used to precede and conclude all outgoing communic .

1.

Take net," control of the radio channel by saying: "All stations this (Repeat) "All stations this net, to all 5-1-1 stations, stand by for Warning Point roll call "this is K-0-N 5-1-1 P

2. .i.

Wait 30 seconds to allow the offsite agencies to get to their radios then repeat the previous transmission. ,

I NOTE f

( After 5 P.M. weekdays, all day Saturday, Sunday or holidays, Maricopa County Sheriff's Office (MCS0) i and Department of Public Safety (DPS) will be the only agencies responding.

3.

Initiate roll stations callnet on the of the offsite government agencies, allowing to respond.

3.1 "5-1-1 Palo Verde to 5-1-1 Maricopa County Sheriff's Office you copy?" Allow response: "5-1-1 MCSO copies." . Do 3.2 "5-1-1 Palo Verde to 5-1-1 Maricopa County Department of Civil Defense & Emergency Services.

Allow response: Do you copy?" (MCDCD&ES) l "5-1-1 Civil Lefense copies."

3.3 l "5-1-1 Palo Verde to 5-1-1 Department of Public Safety Do you copy?" .

Allow response: "5-1-1 DPS copies."

3.4 "5-1-1 Palo Services. Do Verde to 5-1-1 Arir:ona Division of Emergency you copy?"

l l

Allow response: "5-1-1 ADES (State EOC) copies. "

3.5 "5-1-1 Do Palo Verde you Copy?" to 5-1-1 Arizona Radiation Regulatory Agency p Allow response: "5-1-1 ARRA copies."

/

PV296 000A (8 82)

! CONTROLLED DOCUMENT

m. ;, , r ,ga. -

= .

m p- n .x. .

CONT OLLhb.s.co- b.b CUMENT PVNGS EMERGENCY PLAN PROCEDURE N O- $

APPENDIX F D,

O

/ IMPLEMENTING PROCEDURE EPIP-03 Page 2 of 2  ;

NOTIFICATION OF UNUSUAL REVISION EVENT IMPLEMENTING ACTIONS 6 Page 19 of 22 NOTIFICATION ALERT NEL'ORK (NAN) RADIO BACL'UP (CONT'D CHANNEL 8 - KON511 4.

Upon verbatim. completion of roll call, transmit the notification message '

Take an acknowledgement roll call, allowing MCSO to read ,

the messageas clarification, back in its entirety, and provide assistance or needed.

T 5.

Upon completion of the second roll call, announce:

Verde off." This is the required FCC sign-off. "K-0-N 5-1 1 Pao l .

6.

Continue notifications per Step 1.8 of Appendix E.

s b

V -

(

%?

x l

l l

l Pv216 000A i8t82)

CONTROLLED DOCUM.ENT

, , , , - . - , . . . - - - . . . ,. ..-L.---_----- - - - . . , , . - .

-._-..,,,.--,._--_..-,..,..-,.,.?-...,.-- e--,,-

w gre.my w? ~

=: ' ~ L

_ _ _ _ .j . i i.'m:.: '<'-

' 7-

^ ^ ~ ~ ' " '

l .~

.I CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE l b

(~'N N O.

APPENDIX G IMPLEMENTING PROCEDURE EPIP-03 Page 1 of 1 NOTIFICATION OF UNUSUAL REVISION EVENT IMPLEMENTING ACTIONS 6 Page 20 of 22 PROTECTIVE ACTION RECOMMENDATIONS Classification

[

Category Protective Actions t Recommendations Notification of Unusual Event-events are in progress Inform state and county which indicate a potential authorities of NUE status / >

degradation of the level of cause and based on the  ;

safety of the plant; however, situation recommend that no protective action is no releases of radioactive material requiring offsite necessary or to standby response /monit'oring are for an update due to '

expected unless further potential degradation degradation of safety systems of plant safety. .

occur. i

)

. i a

v .

t I

9 b

PV216-000A 18/82)

L_._

CONTROLLED DOCUMENT _

p ,

. . ..y.

~ -.gyp.

. . - .: i;.a.. gy , pg .2:

7-; . ,

f. ; g_ -

-y .-- '

.s,

.- CONTROLLED DOCUMENT

!i A ,

i i

PVNGS EMERGENCY PLAN PROCEDURE

'h

/~N N O.

APPENDIX H IMPLEMENTING PROCEDURE - -

EPIP-03 Page 1 of 2 REVISION NOTIFICATION OF UNUSUAL i EVENT IMPLEMENTING ACTIONS s 6 Page 21 of 22

}i s

CHECKLIST  !

EMERGENCY COORDINATOR j POSITION FILLED BY:

Onshift Organization '

1) Shift Supervisor of the designated unaffected unit
2) Shift Supervisor of the affected enit ,

RESPONSIBILITY:

The individual,onsite with the responsibility and authority to immediately and unilaterally initiate i emergency actions, including providing notification and protective action recommendations to governmental '

authorities responsible for implementing offsite emergency measures. Provide overall direction and I

. control of the ONSHIFT Emergency response. '

t

\ INITIAL RESPONSE TIME / INITIALS 1.

Provide Plant Wide Public Address Announcement or direct the Shift Supervisor to provide same. /

2.

Activate the Satellite STSC per EPIP-11, " Technical Support Center / Satellite TSC Activation." /

3. Commence notification process per Appendie E
/

, -or direct the STSC Communicator to do same.

4.

Notify unaffected unit control rooms of situation.

/

5.

Verify personnel resources are on standby in the OSC.

/

6. Implement EPIPs according to the situation that resulted in the classification. /

SUBSEQUENT RESPONSE 5.

As necessary, direct implementation of EPIP-23, " Fire Fighting" and EPIP-22, " Personnel Injury."

(1) For a fire, dispatch the Fire Team and order the /

Security Director to centact the Bechtel or alternate

] Fire Department for assistance (if required)  !

k.

~,-

A CONTROLLED DOCUMENT ,

w - -- ~

g - -

m.y. .

=:

.- CONTROLLED DOCUMENT ,

l PVNGS EMERGENCY PLAN PROCEDURE

(~N NO. h

\I IMPLEMENTING PROCEDURE - EPIP-03 APPENDIX H page 2 of 2 NOTIFICATION OF UNUSUAL REVISION EVENT IMPLEMENTING ACTIONS 6 Page 22 of 22 i CHECKLIST  :

EMERGENCY COORDINATOR TIME / INITIALS (2)

For personnel injury, contact the First Aid Station ^

and inform them of the situation. Dispatch a First /

Aid Team, if necessary, and coordinate any required offsite assistance.

6.

Determine the need for additional personnel and direct the Security Director to initiate call out. / '

7.

As appropriate, complete Follow-up Emergency Message Form .

i

/ '

8.

Reevaluate the emergency classification ,as conditions  ;

change per EPIP-02, reclassify as necessary. Keep PVNGS Plant Manager informed as to status of event.

k I 9.

Reassess corrective and protective actions. Verify I activities underway. /

Recovery 10.

Consult with the PVNGS Plant Manager prior to f closing out emergency. / 5,

11. I Complete notifications when emergency is closed out. ,

/

12.

Provide termination Supervisor announcement or direct Shift to provide same. /

7 13.

Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of closecut from the NOTIFICATION OF UNUSUAL EVENT classification, provide a written summary to offsite authorities.

/

N i Performed By Date Signature

  • Continuing Activity i >

Pv2t6-000A 18!82)

CONTROLLED DOCUMENT

~

- L~ . . : :~. . . .. . .

CONTROLLED DOCUMENT gm. ,

PVNGS EMERGENCY PLAN

' t ,) gCEDURE -

IMPLEMENTING PROCEDURE EPIP-05 SITE AREA EMERGENCY 3'0" IMPLEMENTING ACTIONS 5 Page 1 of 32 ASSIGhTD COPY.

PVNGS # 8* -

(b l

i i

(

DEPT. HEAD ( f7% '

pc h e /7 -

'd/ DATE / (

PRB/PRG/TRRG REVIEW / /g[////

DATE / [$

APPROVED BY 7/ /, fQ '

v' ,, , ,- .7- ~ DATE C fIS l

( I EFFECTIVE DATE

~

C'btl t'd 3 l

DN-1600A/0787A PV2160 COA (8/82) k CONTROLLED DOCUMENT I

. _ - , , , _ . - . . . - + = = * = " "

CONTROLLsD DOCUMENT

('s PVNGS EMERGENCY PLAN

( IMPLEMENTING PROCEDURE

[ROCEWRE o -

I EPIP-05 SITE AREA EMERGENCY '

IMPLEMENTING ACTIONS 5 Page 2 of 32 REVISION HISTORY Rev. No. Date NY Revised Pages Comments 5 2; I GY _

wSeto c%t adt Ano

~~aa A,, ,,

m in --

NJYnd/Y. W)rn M&f/

&&2lvmM cynnam v

+

i PV216 000A IS/82)

CONTROLLED DOCUMENT

v.y- .

~ M.w ' .%

. ~ m u- 3  ::c CONTROLLED DOCUMENT (N g PVNGS EMERGENCY PLAN (

V IMPLEMENTING PROCEDURE

[ROCEDURE EPIP-os SITE AREA EMERGENCY IMPLEMEhTING ACTIONS 5 Page 3 of 32 TABLE OF CONTENTS SECTION PAGE NUMBER 1.0 OBJECTIVE 4

2.0 REFERENCES

4 3.0 LIMITATIONS AND PRECAUTIONS 5

4.0 DETAILED PROCEDURE 5

4.1 Personnel Indoctrination / Responsibilities 4.2 Prerequisites 5 4.3 Instructions 5 6

D (C

APPENDICES Appendix A - Emergency Notification Call List - Emergency Coordinator /STSC Communicator 10 Appendix B - Emergency _ Notification Call List - PVNGS Security 11 Appendix C - Initial Emergency Message Form 12 Appendix D - Follow-up Emergency Message Form 13 Appendix E - Instructions For Completing Appendix C or D 16 Appendix F - Notification Alert Network (NAN) Radio Backup 19 Appendix G - Protective Action Recommendations 21 Appendix H - Emergency Coordinator Checklist 22 N

)

Pv216@OA (8 82)

CONTROLLED DOCUMENT

..g

~ ,.; , . ,

. ; c_ . . . ..

e '

~

CONTROLLED DOCUMENT 3 PVNGS EMERGENCY PLAN [ROCEWRE [

IMPLEMENTING PROCEDURE EPIP-05 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 4 of 32 1.0 OBJECTIVE _ .

1.1 This procedure provides a series of implementing actions to be taken upon declaration of a SITE AREA EMERGENCY.

2.0 REFERENCES

2.1 Implementing References 2.1.1 EPIP-02, " Emergency Classification" 2.1.2 EPIP-11, " Technical Support Center / Satellite TSC Activation" 2.1.3 EPIP-12, " Operations Support Center Activation" 2.1.4 EPIP-13, " Emergency Operations Facility Activation" O 2.1.5 EPIP-14A, " Release Rate Determination" 2.1.6 EPIP-14B, " Initial Dose Assessment" 2.1.7 EPIP-15, " Protective Action Guidelines" 2.1.8 EPIP-16, "Inplant Surveys and Sampling" 2.1.9 EPIP-17, "Onsite/Offsite Surveys and Sampling" 2.1.10 EPIP-18, " Emergency Exposure Guidelines" l

2.1.11 EPIP-19, "Onsite Evacuation" 2.1.12 EPIP-20, " Personnel Assembly and Accountability" l

2.1.13 EPIP-21, " Search and Rescue"

  • 2.1.14 EPIP-22, " Personnel Injury" I 2.1.15 EPIP-23, " Fire Fighting" l

2.1.16 EPIP-24, " Security" 2.1.17 EPIP-25, " Reentry for Recovery Operations" l 2.1.18 EPIP-26, " Potassium Iodide (KI) Administration" l k

2.1.19 EPIP-31, " Recovery" 1

CONTROLLED DOCUMENT

hl.!!EL

.5 ' . . ,

? : -'" '

'M '

CONTROLLED DOCUMENT

,q (

-Q PVNGS EMERGENCY PLAN [cens IMPLEMENTING PROCEDURE EPIP-05 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 5 of 32 3

2.1.20 EPIP-33, "Offsite Assistance" 2.1.21 71AC-9ZZ01, " Event Related Reporting" 2.1.22 78AC-0ZZ06, " Documentation and Record Turnover Control" 2.2 Developmental References l 2.2.1 NUREG-0654, Rev. 1, " Criteria for Preparation and Evaluation '

of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" 2.2.2 PVNGS Emergency Plan, Rev. 5 r

3.0 LIMITATIONS AND PRECAUTIONS 3.1 c n\ Continued surveillance and assessment of plant conditions are

[h necessary to ensure that the emergency classification is appropriately revised as conditions change or more definitive information is obtained.

4.0 DETAILED PROCEDURE 4.1 Personnel Indoctrination / Responsibilities 4[1.1 In a SITE AREA EMERGENCY, substantial releases of radioactive material may occur. Any releases are not expected to exceed EPA Protective Action Guideline exposure levels beyond the site boundary. Consideration of appropriate protective actions, based on actual or projected data, is warranted.

All onsite and offsite emergency centers are activated.

! Onsite evacuation will be initiated if appropriate. The .

station shall provide updated radiological / meteorological information to offsite emergency management organizations.

The SITE AREA EMERGENCY status shall be maintained until the event is terminated or recla.ssification takes place.

4.1.2 The Shift Supervisor or Emergency Coordinator shall be responsible actions forprocedure.

of this initiating and completing the implementing 4.2 Prerequisites 4.2.1

((~ N The emergency has been classified per EPIP-02, " Emergency Classification."

PY216 000A (8 82)

CONTROLLED DOCUMENT

w.

. = _ .

~

~CONTRDLLED DdCONiENT i i

k v) PVNGS EMERGENCY PLAN IMPLEMENTING PROCEDURE

[ROCEME EPIP-05 i

SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 6 of 32 I i

4.3 Instructions  !

I 4.3.1 i, The affected unit Shift Supervisor shall perform the following: I NOTE '

i Designated Unaffected Unit Shift Supervisor to assume the role of the Emergency L

, Organizationinare:

Coordinator the _Onshift Emergency i

Affected Unit Unit 1 Unaffected Unit Shift Supervisor Unit 2 Unit 2 f Unit 3 Unit 1 I Unit 2 i Entire Site Unit 1 I

/'] 4.3.1.1 l.V,1 Notify the Shift unaffected unit Supervisor of the designated (or Shift Supervisor of an unaffected  ;

unit) to report to the Control Room of the affected unit and assume the duties of the Emergency Coordinator.

(

I NOTE '

Initial notifications shall be made from the satellite TSC by the Satellite f TSC Communicator until activation of the EOF.

At that time all subsequent initial and follow up notifications ,

shall be made by the Government Liaison '

Engineer in the EOF.

E0_g Protective Action recommendations i (Appendix G) are based on plant and f containment conditions and these recommendations are made to offsite officials even when no release is in progress.

4.3.1.2

  • Direct the Satellite TSC Communicator to fill out

{ i Appendix C, " Initial Emergency Message Form", in accordance with instructions provided in Appendix E.

Pv216-000A (8-82) L CONTROLLED DOCUMENT

CONTROLLED DOCUMENT g ~.

PVNGS EMERGENCY PLAN PROCEDURE (V) IMPLEMENTING PROCEDURE NO.

EPIP-05 SITE AREA E!!ERGENCY IMPLEMENTING ACTIONS 5 Page 7 of 32 4.3.1.3 5' Sound the accountability signal for approximately one minute.

4.3.1.4 Silence the signal and provide the following announcemeit over the plant wide telephone page (phone no the site warning siren /public address system: and ,

" Attention all plar.t Personnel, an emergency Area situation classified as a Site Emergency exists in Unit .

Assembly and accountability are now in progress.

All affected Unit Emergency Response Personnel and alternates report to ycur emergency location. All other personnel area". report to your assigned assembly (Provide instructions on routes or areas to avoid as appropriate).

p 4.3.1.5 Resound the accountability signal and repeat the (V) announcement.

4.3.1.6 Notify the Control Rooms of the unaffected units .

4.3.1.7 Ensure that actions of the appropriate recovery procedures have been implemented.

4.3.2 The Emergency Coordinator shall perform the following:

4.3.2.1 Ensure activation of the satellite TSC in accordance EPIP-11, " Technical Support Center / Satellite TSC Activation."

4.3.2.2 Following accountability, and if conditions warrant Y initiate EPIP-19, "Onsite Evacuation". ,

4.3.2.3 Implement additional Emergency Plan Implementing Procedures according to the situation that resulted in ,

the emergency being classified as a SITE AREA EMERGENCY.

4.3.2.4 Direct the Security Director to call in Onsite and Offsite Emergency Organization personnel by utilizing the appropriate computer call-out listing.

4.3.2.5 Direct the STSC Communicator to prepare Appendix D,

" Follow-up Emergency Message Form" in accordance with instructions provided in Appendix E.

8'v296 000A 18-62 m CONTROLLED DOCUMENT

~ ~

1 CONTROLLED DOCUMENT

-m f s PVNGS EMERGENCY PLAN PROCEDURE 3

(v) IMPLEMENTING PROCEDURE NO.

EPIP-oS SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 8 of 32 4.3.2.6 Determine the need for offsite assistance. If assistance is necessary, direct the STSC Communicator (onshift) or the Administrative and Logistics Coordinator to contact the required agency per EPIP-33, "Offsite Assistance" .

4.3.2.7 Reevaluate the emergency classification and perform '

licensee actions procedure EPIP-02.as conditions change by implementing 4.3.2.8 When the situation warrants downgrading / upgrading the SITE AREA EMERGENCY, proceed to appropriate implementing and notification procedures and direct the Shift Supervisor to announce the reclassification over the public address system and inform the other Control Rooms.

4.3.2.9 The Emergency Appendix H. Coordinator shall complete checklist, O 4.3.3 PVNGS Security, after being notified by the Emergency Coordinator or STSC Communicator that a Site Area Emergency

" Emergency Notification Call Listis in progress or has occurred,

- PVNGS Security," and notify these individuals or departments of the situation.

4.3.4 Operations Support Center (OSC) Activation 4.3.4.1 The OSCCenter Support Coordinator shall implement EPIP-12, " Operations Activation".

4.3.5 Emergency Operations Facility (EOF) Activation 4.3.5.1 The Emergency Operations Director shall implement EPIP-13, " Emergency Operations Facility Activation".

4.3.6 Emergency Situation Terminated 4.3.6.1 The Shift Supervisor (or Emergency Coordinator) shall I sound the "All Clear" signal for approximately (1) minute, silence the signal, and provide the following ann '" cement over the plant wide telephone page (phone no.

and the site warning siren /public address system:

" Attention all personnel. The emergency

  • A situation declared in Unit has l 4 now been terminated". (Provide special 'i Q1 instructions as necessary.)

~ " " ~ 4.3.6.2 Repeat signal and announcement once i CONTROLLED DOCU' MENT

, _.,; .. . _ .g,,3 .

u 2: ,

' ~ '

'~

16ATRO[ LED D6CUMENT PVNGS EMERGENCY PLAN pceouse d- IMPLEMENTING PROCEDURE EPIP-05 f

SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 9 of 31 4.3.6.3 Vithin 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of closecut from a Site Area Emergency -

classification, provide a written summary to offsite authorities in accordance with 71AC-9ZZ01, " Event Related Reporting".

4.3.7 Record Retention '

4.3.7.1 Appendices A, B, C, D and H shall be turned over to the Emergency Planning and Preparedness Dept., Mail Station 6010, to ensure they are forwarded to DDC for proper ,

storage in accordance with 78AC-0ZZ06, " Document and ,

Record Turnover Control".

i O

~

O i

~ ~ ^ ~

CONTROLLED DOCUMENT i

___ - s_. -- .-. . - . . . .-

l I 1' > ll , il

, i' . i:  ;,1 ' I

. 1 .

  • V HMQ - T Fw4

$<Zb*m3m mo 2 )l TI Omg 2m )

. ZO .

TImgmzt- ZO T O g e9y >: > _

mm 1es a t*

L yD H Om t

n HM e D )

> 29

![m v.O

" I u~O _

_ ~Zda'"dH$ > ~ _

m yoO Wo Om tN 4 g

g (A

gj _

j y _ a / f / / / / ' / ,

- [

4 Q f_ _

g M [

_ O I

I A _

_. S I CI L N u

L m L l

_ A o C C N C S

04 I 54 A /

. C H 4 D I

fl A l N _

. 0 I

._ N D R

Y O _

C O N C _

I

- C Y t

f C l i h l M

E E

G R

t A _

E _

M E _

g _

W 8

g _

p

. n a

m f t r _

( o A ad f pn r y

p n t

ny os eas e e D e m

t e

g y me oc e n nc l

yc e ec s y a g t .

oe yss n _

! t ti t e e v y a c ,

0 r y nf seg sr tnv S ner o . _

N at uf A i e uf e g t M p t, _

I R_ Da pe oo d ef C ay ivS oeS CD y n iru n t

s r s Hr Dy ig c u

_ Q h o a n e o

_ a ap 'f c alc a e l o r i

d _

y nc at an pa n P S P _

Q, us of cs ne ot ne og ove it c t

a e

- N L eu tl ru s r re ah t a ig re tr e e r ra ca g iCr af m r p S S u G G e o N V

N V

a, a

p s

C JA AP MS AR At P P n moi C 0 oi .

_  ? 8? E b rZH I

!I! I OOZdN f O F

[-

b CONTROLLED DOCUMENT i  !

PVNGS EMERGENCY PLAN PROCEDURE

'g I IMPLEMENTING PROCEDURE l

sp1p.os he e1 SITE AREA E.MERGENCY REVISION i

1, IMPLE.MENTING ACTIONS 5 Page 11 of 32 i

i i

l l

5 - l d l Oi n'

l 5s 4s s s i ll a

4

(

E5 G

!h 3 En i Si 5.

$ E 3

I w

s' s

J

[ E E $

?

E i

= e r

  1. $ t, 3 f abe  : 83 , a C 3  :: , t 9 x 5$$555E i* h5 5 gi 3 5
  • 23  :=*4 s0 I: -v :

d

  • at a a *. 13 :

$ $ !! $ t t2 5i j

  • 3 33 J i is 28 .

I PV2'6 OCOA la 82 CONTROLLED DOCUMENT

~r n u ... = =

~

mm. M -

.: ~ + 1 CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE

( i IMPLEMENTING PROCEDURE N O.

APPENDIX C 3

EPIP-05 Page 1 of 1 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 12 of 32 INITIAL EMERGENCY MESSAGE FORM NOTIFICATION OF UNUSUAL EVENT, ALERT, SITE AREA EMERGENCY, OR GENERAL EMERGENCY 1.

Verbatim text of Message:

THIS IS (IS NOT) A DRILL!! (Circle'One) THIS IS PALO (ALERT) VERDE (SITE NUCLEAR (GENERAL AREA EMERGENCY) GENERATING EMERGENCY) STATION *

(cross out notifications above not applicable) ^

declared at - fk (time) - Wind is from _ degrees - At mph. I':

(date)

(speed)

PALO VERDE AUTHENTICATOR

[

(authenticator letters)

2. This is Station (name/ title) ~, at the Palo Verde Nuclear Generating .
  • ~
3. (Circle One) i NO (a) ,

[j,T

\ There isactions protective @, repeat are re.@, radioactive commended at thisrelease time. taking place and no f_ spe OR ,

(b) , , #

There is @, repeat @, radioactive release in excess of allowable ' '

operating limits and @ pro +.ective OR action recommendations at this tim (c) -%

There is @, repeat @, radioactive release taking place.

followingSectors protective actions are recommended at this time. However, th [O '-

. P'- .,

Distance (Miles) };

OR (d)

A radioactive release I_S, repeat IS, taking place. <

We recommend that people inSectors affected sectors remain indoors with windows and doors closed. t (.

Dist.ance (Miles) hy OR 1-(e)

A radioactive release IS, repeat IS, taking place. k.

We recommend that i evacuation of affected sectors be considered.

Sectors ,

Distance (Miles) 4.

THIS IS (IS NOT) A DRILL!! (Circle One)

{', Approved

i U (SS/EC/EOD) Date Time PV216 0CDA q$ 82)

CONTROLLED DOCUMENT

hi. 4  ::: J:. .-. . " P ' ~ *NW I

i

'r Cg PVNGS EMERGENCY PLAN PROCEDURE (j IMPLEMENTING PROCEDURE N O.

EPIP-05 APPENDIX D Page 1 of 3 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 13 of 32 FOLLOW-UP EMERGENCY MESSAGE FORM 1.

Verbatim text of Message: THIS IS (IS NOT) A DRILL!! i (Circle One) '

THIS IS A PALO VERDE NUCLEAR GENERATING STATION follow-up information message concerning the (NOTIFICATION OF UNUSUAL EVENT) (ALERT) (SITE AREA EMERGENCY) (GENERAL EMERGENCY) '

(cross out notifications above not applicable) ~

declared at -

(time) (date) '

2. This is

, at Palo Verde Nuclear Generating Station.

(name/ title)

3. Meteorological Data  !
a. Wind direction from _

(degrees) - at miles per hour (direction) (speed)

f. from to (sector) (sector) ,
b. Stability Class: ABCDEFG (Circle One) i-
c. Precipitation Yes I No (Circle One)
4. Radiological Data
a. Radioactivity (check one)

( ) Has been released

( ) Has not been released V

~ ~ ^ " '

CONTROLLED DOCUMENT

.. . ._ . _=- - -- - . _. . _

, m .m.,

G ..

e, G.

~ ,

-: - we

~

4 CONTROLLED DOCUMENT (G PVNGS EMERGENCY PLAN PROCEDURE NO. .

i i

IMPLEMENTING PROCEDURE APPENDIX D EPIP-05 Page 2 of 3 1 SITE AREA EMERGENCY REVISION lt IMPLEMENTING ACTIONS  ;

5 Page 14 of 32 i

!I

4. b. b Release Time i

+

5

c. Reactor Trip Time
d. Location / Source of Release  !,

5.

Current Release Rates

a. I-131 Equivalent I
b. Noble Gas Ci/second
c. Particulates Ci/second {'

)

Ci/second 6.

Two-hour plume centerline projected dose at:

)

Distance Sector Whole Body Child Thyroid i Dose (REM) Dose Commitment  !

O (REM)

U i s

Site s 1 Boundary i -

i

' i i

2 miles 5 miles .

i 10 miles I

7.

Plume arrival time offsite:

l 2 mi 5 mi 10 mi Ruth Fisher School Arlington School i V 8.

Estimated duration of release minutes Pv216-000A (8~82)

CONTROLLED DOCUMENT -

> +

w u._ . x ~ .

.u._.-......~

. .= w . -

CONTROLLED DOCUMENT m

PVNGS EMERGENCY PLAN PROCEDURE N O.

IMPLEMENTING PROCEDURE APPENDIX D EPIP-05 Page 3 of 3 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 15 of 32

9. .

The Following Emergency Measures Including Protective Actions are Recommended:

10. The Following Emergency Reponse Actions are Underway:

i i

11. We Request the Following Onsite Support and Assistance from Offsite Sources:

i

12. Our Prognosis of the Emergency is that Conditions: 5 Are Under Control Can Be Expected to Terminate Within _ hours Are Wntsening
13. Other In:?ormation:
14. THIS IS (IS NOT) A DRILL!! (Circle One) d I Pv216-000A 18:82)

CONTROLLED DOCUMENT

~ : __ , _ . _ . -- - - - - " - ~

CONTROLLED DOCUMENT

,m 3 PVNGS EMERGENCY PLAN PROCEDURE

( ) N O. -

[ i IMPLEMENTING PROCEDURE EPIP-05 APPENDIX E Page 1 of 3 SITE AREA EMERGENCY REVISION IMPLEMENTING ACTIONS 5 Page 16 of 32 INSTPI'CTIONS FOR COMPLETING APPENDIX C OR D 1.0 INITIAL EMERGENCY MESSAGE FORM (APPENDIX C) 1.1 Emergency Message Form". Fill in data required by steps 1 and 2 of Obtain authenticator from the confidential envelope marked on the outside with the appropriati month and drill sequence number (if it is a drill).

1.2 Obtain from the Radiation Protection Monitor (onshift) or Radiological Assessment Coordint cor (if EOF is activated) data required to complete step 3 of Appendix C.

1.3 Circle appropriate wording of step 4 of Appendix C.

E '

When the NAN ring button is pushed and it fm .

appears that all the receiving stations are on

( ) line,'or, the ring has stopped, the PVNGS C/ originating station shall initiate a roll call in the order listed below. (Consider the time of day.)

i NOTE If the NAN dedicated telephone fails, refer to Appendix F, " Notification Alert Network (NAN) l Radio Backup", for instructions on using -

l channel 8, KON-511, for notifications.

1.4 By means of a single call on the Notification and Alert Net j dedicated listed in Appendixtelephone, A. contact the following State / County agencies Duty Hours (8:00 a.m. to 5:00 p.m. Monday-Friday)

Maricopa County Sheriff's Office l Maricopa County Department of Civil' Defense and Emergency Services l Arizona Department of Public Safety Arizona Division of Emergency Services Arizona Radiation Regulatory Agency Off-Duty Hours (5:00 p.m. to 8:00 a.m.,

Monday-Friday, all day

. Saturday, Sunday and Holidays) 9 Maricopa County Sheriff's Office Department of Public Safety PY216-000A 18%)

CONTROLLED DOCUMENT ,

, z., ,

, ...~:-. --~" '

l

/-. 3 PVNGS EMERGENCY PLAN PROCEWRE

(

%./

)

IMPLEMENTING PROCEDURE N O.

APPENDIX E

[.

EPIP-05 Page 2 of 3

- ~ ~ - -

SITE AREA EMERGENCY  !

IMPLEMENTING ACTIONS 5 Page 17 of 32 l

1.5 When contact is made, the caller shall identify himself and Emergency Message Form. request that the individuals obtain a copy of t 1.6 When each individual has obtained a copy, read the completed Emergency verbatim. Message Form verbatim and request MCSO to read ba k Perform warning point roll call. c

~

1.7 Offer to repeat information and reiterate as necessary ,

1.8 Notify additional personnel as listed in Appendix A as sary neces and inform them of the situation.

for the Group Paging System Notification and Callout: Provide the follow "This is PVNGS, Unit Please Respond approp _riately.", Classification Two, once). (Repeat message 1.9 p If an individual requests information not contained in the l

l D') give the information only after all initial notificatio been made.

1.10 Contact the hTC via the Emergency Notification System (ENS) dedicated telephone within 60 minutes of declaringency. an emerg If the ENSline.

alternate fails, use commercial phone or HPN phone as an 1.11 When contact is made, the caller = hall identify himselfead and r .

the completed Emergency Message Form verbatim (omit e Palo th Verde Authenticator). l 1.12 Offer to repeat information and reiterate as necessary .

l

< i ,

PV216 000A (8.82) l CONTROLLED DOCUMENT

._Se

7, u -

, 7--,,,.- _y x.,

"- ~

CONTROLLED DOCUMENT

(/')

L/

PVNGS EMERGENCY PLAN PROCEDURE N O.

APPENDIX E f

IMPLEMENTING PROCEDURE EPIP-05 Page 3 of 3 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 18 of 32 2.0 FOLLOW-UP EMERGENCY MESSAGE IORM (APPENDIX D) 2.1 Fill in dataMessage Emergency requiredForm".

by st(eps 1 and 2 of Appendix D, " Follow-up 2.2 Obtain from the Radiation Protection Monitor or the Radiological Assessment complete steps Coordinator 3-9. (if EOF is activated) data required to ~

2.3 Obtain from the Emergency Coordinator or the Technical Analysis Coordinator 10-13. (if EOF is activated) data required to complete steps 2.4 Circle appropriate wording in step 14.

2.5 Dispense information when asked by offsite agencies (NRC or ARRA).

P O

/

\

O

~~^"'

CONTROLLED DOCUMENT

mg. _

_o-CONTROLLED DOCUMENT

)

\

s  !

( 'l PVNGS EMERGENCY PLAN PROCEDURE g

'(j NO. APPENDIX F IMPLEMENTING PROCEDURE EPIP-05 Page 1 of 2 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 19 of 32 NOTIFICATION ALERT NEIVORK (NAN) RADIO BACKUP CHANNEL 8 - KON511 In esse of failure of the NAN ringdown telephone, the NAN backup is Channel 8 on the PVNGS radio. FCC regulations require the Palo Verde designetor 'KON511' be used to precede and conclude all outgoing ^

communications.

1. Take control of the radio channel by saying: "All stations this net," (Repeat) "All stations this net, this is K-0-N 5-1-1 Palo Verde. 5-1-1 Palo Verde to all 5-1-1 stations, stand by for warning point roll' call."
2. Wait 30 s'econds to allow the offsite agencies to get to their radios, i then repeat the previous transmission. I NOTE i s

( After 5 P.M. weekdays, all day Saturday, Sunday or holidays, Maricopa County Sheriff's Office (MCS0) i and Department of Public Safety (DPS) will be the only agencies responding.

i

3. Initiate roll call of the offsite government agencies, allowing stations on the net to respond.

3.1 "5-1-1 Palo Verde to 5-1-1 Maricopa County Sheriff's Office. Do you copy?"

Allow response: "5-1-1 MCSO copies."

3.2 "5-1-1 Palo Verde to 5-1-1 Maricopa County Department of Civil Defense & Emergency Services. Do you copy? (MCDCD&ES)

Allow response: "5-1-1 Civil Defense copies."

3.3 "5-1-1 Palo Verde to 5-1-1 Department of public Safety. Do you copy?"

Allow response: "5-1-1 DPS copies."

3.4 "5-1-1 Palo Verde to 5-1-1 Arizona Division of Emergency Services. Do you copy?"

Allow response: "5-1-1 ADES (State EOC) copies."

\

v l

~ ~ *

  • CONTROLLED DOCUMENT .

,,z _,- ,

v . .. , . , ..- . -

. ,7 ,

CONTROLLED DOCUMENT C) PVNGS EMERGENCY PLAN IMPLEMENTING PROCEDURE PROCEDURE NO.

EPIP-05 APPENDIX F Page 2 of 2

[

SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 20 of 32 3.5 "5-1-1 Palo Verde to 5-1-1 Arizona Radiation Regulatory Agency.

j Do you copy? ,

Allow Response: "5-1-1 ARRA copies."

4.

Upon completion of roll call, transmit the notification message verbatim.

Take an acknowledgement roll call, allowing MCSO to read the message back in its entirety, and provide assistance or clarification, as needed.

5. Upon completion of the second roll call, announce: "K-0-N 5-1-1 Palo Verde off." This is the required FCC sign-off.
6. Continue notification per Step 1 8 Appendix E.

~~~ **

CONTROLLED DOCUMENT

m. . m w . t.

~

~ - -

~

CONTROLLED DOCUMi!NT j PVNGS EMERGENCY PLAN d IMPLEMENTING PROCEDURE PROCEDURE N O.

APPENDIX G fh '

EPIP-05 Page 1 of 1  ;

SITE AREA EMERGENCY REVISION 1

IMPLEMEhTING ACTIONS j 5 Page 21 of 32

{

ii PROTECTIVE ACTION RECOMMENDATIONS Classification I Category Protective Actions Recommendations Site Area Emergency- i any releases are not expected Inform state and county ,

to exceed EPA / PAG exposures authorities of Site Area levels beyond the site boundary Emergency status /cause and -

unless further degradation recommend seeking shelter i of safety systems occur. within a 2 mile radius of the plant and within 10 miles in affected sectors as warranted based on plant / containment conditions and projected and/or j actual releases.

i 1

t c

l I

PV24000418.82)

CONTROLLED DOCUMENT

p;;; c . . , ,. x . -

x A':.: t l4 s

-- ~ - _. - _ - -- . . - . . . ~ . - - -

['N' PVNGS EMERGENCY PLAN

( ,) IMPLEMENTING PROCEDURE PROCEDURE NO. .

APPENDIX H

[

EPIP-05 Page 1 of 11 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 22 of 32 CHECKLIST EMERGENCY COORDINATOR S,TSC ACTIVATED POSITION FILLED BY:

1) PVNGS Plant Manager '
2) Manager, Technical Support
3) Shift Supervisor .

RESPONSIBILITY:

The individual onsite with the responsibility and authority to immediately and unilaterally initiate emergency actions, including providing notification and protective action recommendations to Governmental

  • authorities responsible for implementing offsite emergency measures. Provide for the control and coordination of onsite emergency response.

NOTE Refer to the following pages per appropriate facility activation 1

Facility Activated Appendix H Page STSC 1-4 TSC 5-8 TSC/ EOF 9-11 r

INITIAL RESPONSE TIME / INITIALS i .

1.

Receive notification from the Shift Supervisor and report /

to the Control Room of affected unit.

2.

Review plant status, initiating event, corrective actions /

and emergency classification with the Shift Supervisor.

3.

Assume the position of onshift Emergency Coordinator.

/

1 I

~""^*"'

CONTROLLED DOCUMENT .

L  %. _ _ _ _ . _ _ _ _ _ _

--- - --~ ~ ~--~" ~ ~ ~

CONTROLLED DOCUMENT c

/ .s PVNGS EMERGENCY PLAN PROCEDURE

\v ) NO.

APPENDIX H _

[

IMPLEMENTING PROCEDURE EPIP-05 Page 2 of 11 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 23 of 32 t

CHECKLIST EMERGENCY COORDINATOR STSC ACTIVATED INITIAL RESPONSE TIME /INITIAI.S ,

4.

Activate the Satellite TSC per EPIP-11, " Technical Support Center / Satellite TSC Activation." /

5.

Commence notification process per Appendix E or the direct STSC Communicator to do so. /

(1) Direct the Security Director to call in the PVNGS s

/

onsite and _offsite Emergency Organization Personnel.

[ 6.

Verify personnel resources are on standby in the OSC.

t

(.)'

/

7.

Reevalute the emergency classification as conditions change per EPIP-02, reclassify as necessary. /

8.

As necessary, direct implementation of EPIP-23, " Fire Fighting" and EPIP-22, " Personnel Injury." /

(1) For a fire, dispatch Fire Team and order the Secur-ity Director to contact the Bechtel or alternate /

offsite fire department for assistance (if required).

(2) For personnel injury, contact the' First Aid Station .

and inform them of the situation. Dispatch a First /

Aid Team, if necessary, and coordinate any required offsite assistance. i 9.

Determine any additional protective action recommendations /

to be provided to state and county response agencies per EPIP-15, " Protective Action Guidelines." ,

10.

As appropriate, complete Follow-up Emergency Message Form.

/

11.

Determine the need for offsite support and direct the STSC Communicator to call location (s in EPIP-33, "Offsite /

Assistance" and arrange access w)ith the Security Director per EPIP-24, " Security."

k > 3 l

PV216 000A 18'82)

CONTROLLED DOCU MENT l

q- 7- _, y_ . .

, .y; q.= , -

zu _-

.u .

CONTROLLED DOCUMENT

,/- PVNGS EMERGENCY PLAN PROCEDURE ,1 Q} IMPLEMENTING PROCEDURE NO.

EPIP-05 APPENDIX H Page 3 of 11 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 24 of 32 CHECKLIST '

EMERGENCY COORDINATOR STSC ACTIVATED SUBSEQUENT RESPONSE TIME / INITIALS Personnel Assembly and Accountability 12.

Within 30 minutes of the accountability signol, receive a report on accountability in the protected t ea from /

the Security Director.

13.

Receive a report on site accountability later.

/

14.

Be prepared to implement EPIP-21, " Search and Rescue",

by providing necessary data to the OSC Coordinator.

/

~

Emergency Exposures and KI j 15.

U Per EPIP-18, " Emergency Exposure Guidelin necessary, authorize emergency exposures.es," and as /

16.

As necessary, authorize administration of KI per EPIP-26, /

" Potassium Iodine (KI) Administration" to emergency workers desiring to use it.

, Protection Monitor. Consult with the Radiation TSC Activation and Transfer of Authority 17.

When relieved by onsite Emergency Coordinator, provide a briefing and transfer responsibilities. /

OSC Activation 18.

If a release is occurring, consult EPIP-12, " Operations /

Support Center of the primary OSC. Activation," to determine habitability 19.

If uninhabitable, direct the OSC Coordinator to relocate /

staff and equipment / supplies to the alternate OSC (Service Building).

If this is also unihabitable, direct the OSC Coordinator STSC, TSC or to relocate to a protected area (Control Room /

EOF).

)

d l

~~""

CONTROLLED DOCUMENT -

-- 7 . ._ .. - m ,

7M@ lad DdCOMENT~

- - ~~

, l l

/m 3 PVNGS EMERGENCY PLAN PROCEDURE

(\,/  ! NO. .

IMPLEMENTING PROCEDURE APPENDIX H EPIP-05 Page 4 of 11 SITE AREA EMERGENCY IMPLEMENTING ACTIONS

1. 5 Page 25 of 32 T'

CHECl: LIST ,

EMERGENCY COORDINATOR

STSC ACTIVATED i

TIME /INITIAM ,

20. ~ s As necessary, implement EPIP-24, " Security," and order .

the Security Director to limit access to the station ,

/

contact Maricopa County Sheriff's Office for assistance in controlling site access, and arrange access for necessary personnel not on the Emergency Personnel Accesa List and/or card-key not' having access to the protected area via system.

21. t i Ensure the Security Director is appraised of oftsite  !

assistance request to arrange access. / ,

Corrective Actions

( ) 22.  ;

6

\d Determine needs, consult with staff, authorize reentry per EPIP-25, " Reentry for Emergency Operations." ./

Assessment Actions

23. '

Ensure that the Radiation Protection Monitor is obtaining /

I needed data using EPIP-14A, " Release Rate' Determination,"  !

EPIP-14B, Surveys and "SamInitial Dose Assesment," EPIP-16, "Inplant ,

l and Sampling." pling" and EPIP-17, "Onsite/Offsite Surveys ',

Protective Actions 24.

Continue to evaluate the need for providing Protective Action recommendations. /

25.

Determine need for early dismissal / evacuation of non-essentials per EPIP-19, "Onsite Evacuation." /

26.

l Establish evacuation order, offsite reassembly area, evacuation route and inform the Security Director. /

27.

Order evacuation signal when the Security Director reports that preparations are complete. /

O Performed By Date Signature PY216EA 18382)

CONTROLLED DO.CUMENT -

a ]

w .w '

..u----

- c ,

w= .

j

~

CONTROLLED DOCUMENT g O) PVNGS EMERGENCY PLAN PROCEDURE NO. f s

v/ IMPLEMENTING PROCEDURE EPIP-05 APPENDIX H Page 5 of 11 -

SITE AREA EMERGENCY REVISION IMPLEMENTING ACTIONS 5 Page 26 of 32  ;

i e

CHECKLIST EMERGENCY COORDINATOR TSC ACTIVATED INITIAL RESPONSE TIME / INITIALS f

1.

Receive notification from the onshift Emergency Coordi-4

/

nator and report to the TSC. Upon arrival, sign in on the TSC staffing Board.

2.

Receive a briefing from the_onshift Emergency Coordinator and assume resp'onsibilities. /

3.

Brief TSC and staff and evaIuate adequacy of TSC activation. / I

4. t Declare the TSC operational and inform the STSC, Control /

[] Rooms, EOF, ANPP Site Construction Office, Bech'tel Emergency '

Control Center and PVNGS Security. ,

5.

As necessary, continue with or commence notification /

process per Appendix E o_r direct the STSC Communicator to do so. -

6. Verify personnel resources in standby in the OSC. i

/

SUBSEQUENT RESPONSE 7.

Reevaluate the emergency classification as conditions /

change per EPIP-02 " Emergency Classification,"

reclassify as necessary.

8.

As necessary, direcxt implementation of EPIP-23, " Fire /

Fighting" and EPIP-22, " Personnel Injury."

(1), For a fire, dispatch Fire Team and order the Secur- /

ity Director to contact the Bechtel or alternate offsite fire department for assistance (if required).

(2) For personnel injury, contact the First Aid Station l /

l and inform them of the situation. Dispatch a First Aid Team, if necessary, and coordinate any required offsite assistance.

l l

O u a t

E PV216-0 COA 18782)

! CONTROLLED DOCUMENT .

== mms -

v.- .' .

_ _ - . . - - - - ~

1 7N PVNGS EMERGENCY PLAN PROCEDURE

( j N O. -

APPENDIX H u- IMPLEMENTING PROCEDURE EPIP-05 Page 6 of 11 SITE AREA EMERGENCY IMPIIMENTING ACTIONS 5 Page 27 of 32 t CHECKLIST EMERGENCY COORDINATOR

  • TSC ACTIVATED TIME / INITIALS 9.

Determine additional protective action recommendations to

/

be provided to state and county response agencies per EPIP-15, " Protective Action Guidelines."

10.

As appropriate, complete Follow-up Emergency Message Form. /

11.

Determine the need'for offsite support and direct a '

/

Communicator to call location (s) in EPIP-33, "Offsite Assistance," arrange access with the Security  ;

Director per EPIP-24, " Security". .

I Personnel Assembly and Accountability {

12. l f~N Within 30 minutes of the acccountability signal, receive /

( ) a report on accountability in the protected area from the Security Director.

Rj

  • 13.

Receive a report on site accountability later. /

14. I Be prepared to implement EPIP-21, " Search and Rescue," /

by providing necessary data to the OSC Coordinator (via .

Emergency Maintenance Coordinator).  !

Emergency Exposures and KI i

15. l Per EPIP-18, " Emergency Exposure Guidelines," and as i

/

necessary, authorize emergency exposures. ,

16.

As necessary, authorize administration of KI per EPIP-26 to emergency workers desiring to use it. /

Consult with the Radiological Protection Coordinator.

OSC Activation 17.

If a release is occurring, consult EPIP-12, /

" Operations Support Center Activation," to determine habitability of the primary OSC.

18.

If uninhabitable, direct the OSC Coordinator to relocate staff and equipment / supplies to the alternate OSC /

(Service Building). If this is also uninhabitable, i j ) direct the OSC Coordinator to relocate to protected area (control room /STSC, TSC or EOF).

PV24 000A 16:82)

CONTROLLED DOCUMENT  ;

n. . .

.__ ~ . . - - -- _

CONTROLLED DOCUMENT

/~'N

'x.)j l

PVNGS EMERGENCY PLAN PROCEDURE NO-APPENDIX H , [

IMPLEMENTING PROCEDURE EPIP-05 Page 7 of 11 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 28 of 32 CHECKLIST SITE AREA EMERGENCY TSC ACTIVATED TIME / INITIALS EOF Activation ~

19.

Per EPIP-13, " Emergency Operations Facility Activation,"

brief the Emergency Operations Director and transfer the /

responsibilities for notifications and protective action recommendations.

Security 20 As necessary, implement EPIP-24, " Security," and order the Security Director to limit access to the station ,

/

f. contact Maricopa County Sheriff's Office for assistance In controlling site access, and arrange access for

( ')

',. j necessary personnel not on the Emergency Personnel Access List and/or card-key not having access to the protected area via system.

21.

Ensure the Security Director is appraised of offsite assistance requests to arrange access. /

_ Corrective Actions 22.

Determine needs, consult with staff, authorize reentry per EPIP-25, " Reentry for Emergency Operations." /

Assessment Actions 23.

l Ensure that the Radiological Protection Coordinator is obtaining needed data using EPIP-14A, " Release Rate /

Determination," EPIP-14B, " Initial Dose Assessment", EPIP-16, "Inplant Surveys and Sampling" and EPIP-17 , "Onsite/

Offsite Surveys and Sampling."

Protective Actions f 24.

Continue to evaluate the need for providing any additional protective action recommendations. _ /

25.

Determine the need for early dismissal / evacuation of 9 non-essentials per EPIP-19, "Onsite Evacuation.n /

r 1

PV216-000A 18 82)

CONTROLLED DOCUMENT

-. e 1

gw:=p;.. -

.= 4

~ ~ _ _._ . - -- - - - - -

- ~ ~ ^ ^ ~ ~ ~ ~~

CONTROLLED DOCUMENT .

c

(~Nj ,

g PVNGS EMERGENCY PLAN PROCEDURE V NO. -

6 IMPLEMENTING PROCEDURE EPIP-05 APPENDIX H '

Page 8 of 11 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 29 of 32 l 1

CHECKLIST i I

SITE AREA EMERGENCY TSC ACTIVATED

26. TIME / INITIALS Establish evacuation order, offsite reassembly area, ' i evacuation route and inform the Security Director. _

/ i

27. ,

Order that evacuation preparations signal are when the Security Director reports complete.

1

/ '

i Yecovery i !

28. . ,

After the EOF is activated, consult with the Emergency {

"Operations Recovery." director concerning implementing EPIP-31

/

{$

[

O)

(

N /

Performed By .

Date _ 'i Signature _

! i

l t
I.

1

< i I,

PY216 0004 (8.82) i CONTROLLED DOCUMENT

x m;m c - =:;r+::

. . . . . .- r >- m_ .

.7 .

~

CONTROLLED DOCUMENT

~

m r PVNGS EMERGENCY PLAN PROCEDURE 6

Q} IMPLEMENTING PROCEDURE NO.

EPIP-05 APPEhTIX H Page 9 of 11 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 30 of 32 CHECKLIST EMERGENCY COORDINATOR TSC and EOF ACTIVATED INITIAL RESPONSE TIME / INITIALS

~

1.

Receive notification from the onshift Emergency Coordi- /

nator and report to TSC. Upon arrival, sign in on the TSC Staffing Board. -

2. t Receive a briefing from the onshift Emergency Coordinator and assume responsibilities. /

3.

Brief TSC staff and evaluate adequacy of TSC activation. /

4.

Declare the TSC operational and inform the STSC, Control /

Rooms, EOF, ANPP Site Construction Office, Bechtel Emer-  ;

gency Control Center and PVNGS Security.

P)

\v 5.

Per EPIP-13, " Emergency Operations Facility Activation,"

/

brief the Emergency Operations Director and transfer the responsibilities for notifications and protective action recommendations.

6.

Verify personnel resources are on standby in the OSC. /

SUBSEQUENT RESPONSE '

7.

Reevaluate the emergency as conditions change per EPIP-02 /

" Emergency Classification," reclassify as necessary.

8.

As necessary, direct implementation of EPIP-23, " Fire Fighting" and EPIP-22, " Personnel Injury."

(1) For a fire, dispatch Fire Team and order the Security /

Director to contact the Bechtel or alternate offsite fire department for assistance (if required).

(2) For personnel injury, contact the First Aid Station /

cnd inform them of the situation. Dispatch a First Aid Team, if necessary, and coordinate any required offsite assistance.

O)

(m

~~ "'

CONTROLLED DOCUMENT

. ~ ,

,g: '

-- ~ ~ ~ ~~ -

~ CONTROLLED DDCUMENT

/

PVNGS EMERGENCY PLAN PROCEDURE (j IMPLEMENTING PROCEDURE NO.

APPENDIX H EPIP-05 Page 10 of 11 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 31 of 32 CHECKLIST EMERGENCY COORDINATOR TSC and EOF ACTIVATED TIME / INITIALS 9.

Determine the need for offsite support and direct the STSC Communicator to call location _

/

Assistance" and arrange access (s) in EPIP-33, "Offsite with the Security Director per EPIP-24, " Security," and coordinate with the Administrative and Logistics Coordinator at the EOF.

Personnel Assembly and Accountability 10.

Within 30 minutes of the accountability signal, receive a report the on accountability Security Director. in the protected area from /

[ 11. ,

\ Receive a report on site accountability later.

/

12.

Be prepared to implement EPIP-21, " Search and Rescue,"

/

by providing necessary data to the OSC Coordinator (via Emergency Maintenance Coordinator).

Emergency Exposures and'KI 13.

Per EPIP-18, " Emergency Exposure Guidelin necessary, authorize emergency exposures.es," and as /

14.

As necessary, authorize administration of KI per EPIP-26 to emergency workers desiring to use it. Consult _ /

with the Radiological Protection Coordinator.

0SC Activation 15.

If a release is occurring, consult EPIP-12,

" Operations Support Center Activation," to determine _

/

habitability of the primary OSC.

16.

If uninhabitable, direct the OSC Coordinator to relocate

/

staff and equipment / supplies to the alternate OSC (Service Building).

If this is also uninhabitable, direct the OSC Coordinator STSC, TSC or to relocate to a protected area (Control Room /

EOF).

p 1

.j CONTROLLED DOCUMENT

v . .

m w.w:,; - , . -

= = , w

~ . . * :.- . . . . .

- > ~ . ' .

CONTROLLED DOCUMENT 4

O i j PVNGS EMERGENCY PLAN PROCEDURE .

V IMPLEMENTING PROCEDURE -

NO.

EPIP-05 APPENDIX H Page 11 of 11 SITE AREA EMERGENCY IMPLEMENTING ACTIONS 5 Page 32 of 32 s

CHECKLIST EMERGENCY COORDINATOR TSC and EOF ACTIVATED  ;

Security TIME / INITIALS f 17.

As necessary, implement EPIP-24, " Security," and order

/

the Security Director to limit access to the station, contact Maricopa County Sheriff's Office for assistance '

in controlling site access, and arrange access for neces-sary personnel not on the Emergency Personnel Access list -

and/or not having access to the protected area via card-key system.

18.

Ensure the Security Director is appraised of offsite  !

assistance requests to arrange access, _ /

Corrective Actions i

\ f 19.

Determine needs, consult with staff, authorize reentry '

per EPIP-25, " Reentry for Emergency Operations." /

Assessment Actions

20. i Ensure that the Radiological Protection Coordinator is obtaining needed data using EPIP-14A, " Release Rate /

I Determination," EPIP-14B, " Initial Dose assessment," EPIP-16, -

"Inplant Surveys and Sampling" and EPIP-17, "Onsite/  ;

Offsite Surveys and Sampling."

Protective Actions 21.

Determine the need for early dismissal / evacuation of non-essentials per EPIF 19, "Onsite Eavcuation." / ~

22.

Establish evacuation order, offsite reassembly area, evacuation route and inform the Security Director. /

23.

Order evacuation signal when the Security Director reports that preparations are complete. /

Recovery

24.  !

g Consult with the Emergency Operations Director concerning implementing EPIP-31, " Recovery." /

.(i Performed By 9,t, micao4 waa Signature CONTROLLED DOCUMENT

.y... . . . .

'[ .

CONTROLLED DOCUMENT i

(,m) PVNGS EMERGENCY PLAN -

t

" Qcaouse IMPLEMENTING PROCEDURE EPIP-06 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 1 of 34 l

' ASSIGNED COP.Yi+ .

. .l y A - qw

~

P_VNGS t

I V

1 i

PRB/PRG/TRRG REVIEW ,/ ///,/M/#// DATE $

APPROVED BY o

c, ,% ./,,87/

DATE EFFECTIVE DA 09. II tV7 DN-1601A/0787A

~~^*"'

CONTROLLED DOCUMENT

p -

e -

~CONTROliEEFDOCUMENT fS Q .

PVNGS EMERGENCY PLAN IMPLEMENTING PROCEDURE -

[ROCEDURE EPIP-06 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 2 of 34 REVISION HISTORY Rev. No. Date f));ltpRevisedPages 5

M Al'th Comments *

._2 e5 ^ _

All b Total Revision: Revi.ses procedures and appendices.

Included Emergency Coord.

_ checklist.

o _

~

~

(_)

avrw coom wa2i CONTROLLED DOCUMENT

, y p g g.;.. .~ ; . -- n

+ .

~. ~

CONTROH.E6 DOCUMENT ~~ ~~'~ ~

\ PVNGS EMERGENCY PLAN

[ROCEDURE o' [

IMPLEMENTING PROCEDURE EPIP-06 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS S Page 3 of 34 TABLE OF CONTEhTS

_SECTION PAGE NUMBER 1.0 OBJECTIVE 4

2.0 REFERENCES

4 3.0 LIMITATIONS AND PRECAUTIONS 5

4.0 DETAILED PROCEDURE 5 i 4.1 4

4.2 Personnel Indoctrination / Responsibilities Prerequisites  !

5 4.3 Instructions .

6

+

5 '

v APPENDICES ,

Appendix A - Emergency Notification Call List - Emergency Coordinator /STSC Communicator .

10 Appendix B - Emergency Notification Call List - PVNGS Security 11 Appendix C - Initial Emergency Message Form 12 Appendix D - Follow-up Emergency Message Form 13 Appendix E - Instructions For Completing Appendix C or D 16 Appendix F - Notification Alert Network (NAN) Radio Backup 19 Arpendix G - Protective Action Recommendations 21 Appendix H - Emergency Coordinator Checklist 23 V

J

~~^*"' I, CONTROLLED DOCUMENT

- , , . , ~ p;r  ;;y = c '. '

_ _ . . ~ .

_.3:?

'..'  :  :... . ~ . - . . . - - - -

_.CONTRdLLE6DDtUMENT PVNGS EMERGENCY PLAN b IMPLEMENTING PROCEDURE

[ROCEDURE EPIP-06 f

REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS S Page 4 of 34 1.0 OBJECTIVE 1.1 This procedure provides a series of implementing actions to be taken upon declaration of a GENERAL EMERGENCY.

2.0

,~ .

REFERENCES 2.1 Implementing References 2.1.1 EPIP-02, " Emergency Classification" 2.1.2 EPIP-11, " Technical Support Center / Satellite TSC Activation" 2.1.3 EPIP-12, " Operations Support Center Activation" 2.1.4 EPIP-13, " Emergency Operations Facility Activation" -

( 2.1.5 EPIP-14A, " Release Rate Determination" 2.1.6 EPIP-14B, " Initial Dose Assessment" 2.1.7 EPIP-15, " Protective Action Guidelines" 2.1.8 EPIP-16, "Inplant Surveys and Sampling" ,

2.1.9 EPIP-17, "Onsite/Offsite Surveys and Sampling" 2.1.10 EPIP-18, " Emergency Exposure Guidelines" 2.1.11 EPIP-19, "Onsite Evacuation" 2.1.12 F. PIP-20, " Personnel Assembly and Accountability" 2.1.13 EPIP-21, " Search and Rescue" 2.1.14 EPIP-22, " Personnel Injury" 2.1.15 EPIP-23, " Fire Fighting" 2.1.16 EPIP-24, " Security" 2.1.17 EPIP-25, " Reentry for Recovery Operations" 2.1.18 EPIP-26, " Potassium Iodide (KI) Administration" N

~ ~ "'

CONTROLLED DOCUMENT .

yw -

___ _ .m. -

CONTROLLED DOCUMENT ,

m i PVNGS EMERGENCY PLAN (j IMPLEMENTING PROCEDURE

[ROCEDURE ,

EPIP-06 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 5 of 34 2.1.19 EPIP-31, " Recovery" 2.1.20 EPIP-33, "Offsite Assistance" 2.1.21 71AC-9ZZ01, " Event Related Reporting" 2.1.22 '

78AC-0ZZ06, " Document and Record Turnover Control" ,

2.2 Developmental References 2.2.1 NUREG-0654, Rev.

1, " Criteria for Preparation and Evaluation of' Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants".

2.2.2 PVNGS Emergency Plan, Rev. 5 $

t 3.0  !

/; _ LIMITATIONS AND PRECAUTIONS ,

()

3.1 ,

Continued surveillance and assessment of plant conditions are i necessary to ensure that the emergency classification is ,

appropriately revised as conditions change or more definitive information is obtained.

4 10 I DETAILED PROCEDURE i 4.1 ,

Personnel Indoctrination 4.1.1 1

In a GENERAL EMERGENCY, events are in progress or have occurred which involve actual or imminent substantial core degradation or melting with potential for loss of containment integrity. Radioactive releases which may occur can be reasonably expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.

There is prompt notification of NRC and appropriate state and county authorities of the General E..argency status.

4.1.2 Accordingly, prompt consideratien of appropriate protective actions, based on actual or projected data, is warranted.

Consideration of predetermined protective action recommendations (in the event of potential loss of fission product barriers) may also be warranted.

Onsite and offsite emergency centers are activated. Onsite evacuation shall be 9 initiated if appropriate.

The station shall provide updated radiological / meteorological information to offsite emergency management organizations as necessary.

l status shall be maintained until the eventThe reclassification takes place.

GENERAL is terminated or EMERGEN CONTROLLED DOCUMENT t

,y -

CONTROLLED DOCUMENT p  !

1 PVNGS EMERGENCY PLAN PROCEDURE (d

NO. [

IMPLEMENTING PROCEDURE EPIP-06 REVISION '

GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 6 of 34 r

4.1.3 The Shift Supervisor or the Emergency Coordinator shall be actions of this procedure. responsible for initiating and completing I 4.2 Prerequisites .

4.2.1 ,_

The emergency has been classified per EPIP-02, " Emergency Classification".

4.3 Instructions 4.3.1 The affected unit Shift Supervisor shall perform the following:

r NOTE  ?

I Designated Unaffected Unit Shift Supervisor ,

l to assume the role of the Emergency .'

l Coordinator in the ons.hift Emergency 1

Organization are:

Affected Unit Unaffected Unit Shift Supervisor i

Unit 1 Unit 2 Unit 2 i Unit 3 Unit 1 l i

Entire Site Unit 2 Unit 1 4.3.1.1 Notify unit the Shift Supervisor of the designated unaffected (or Shift Supervisor of an unaffected unit) to report to the Control Room of the affected unit and assume the duties of the Emergency Coordinator.

I O)

\m <

PV216 CODA 18 82) {

CONTROLLED DOCUMENT

1. ~

CONTROLLED DOCUMENT 4

PVNGS EMERGENCY PLAN PROCEDURE .

[

N O.

IMPLEMENTING PROCEDURE EPIP-06 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS S Page 7 of 34 ele Initial notifications shall be made from the Satellite TSC by the Satellite TSC Communicator until activation of the EOF. At that time ~

all subsequent initial and follow up ,

notifications shall be made by the Government Liaison Engineer in the EOF.

. NOTE F

Protective action recommennations (Appendix G) are based on plant and containment conditions and these recommendations are made to offsite officials even when no release is in progress.

( 4.3.1.2 Direct the Satellite TSC Communicator to fill out Appendix C, " Initial Emergency Message Form", in

. accordance with instructions provided in Appendix E.

4.3.1.3 Sound the accountability signal for approximately one minute.

4.3.1.4 Silence the signal and provide the following announcement over the plant wide telephone page (phone no and the site warning siren /public system:

" Attention all plant personnel, an emergency situation classified as a General Emergency exists in Unit _ _ . Assembly and accountability are now in progress. All affected Unit Emergency Response Personnel and alternates report to your emergency location. All other personnel report to your assigned assembly area".

(Provide instructions on routes or areas to avoid as appropriate).

4.3.1.5 Resound the accountability signal and repeat the announcement.

4.3.1.6 Notify the Control Rooms of the unaffected units.

,O 4.3.1.7 Ensure that actions of the appropriate recovery or casualty procedures have been implemented.

~ ^ '""

CONTROLLED DOCUMENT

~ ~~ ~

CONTROLLED DOCUMENT f

PVNGS EMERGENCY PLAN (S) IMPLEMENTING PROCEDURE

[a ceouse EPIP-06 I

REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 8 of 34 4.3.2 The Emergency Coordinator shall perform the following:

4.3.2.1 Ensure activation of the satellite TSC in accordance with EPIP-ll, " Technical Support Center / Satellite TSC Activation."

N 4.3.2.2 Following accountability, and if conditions warrant, initiate EPIP-19, "Onsite Evacuation".

4.3.2.3 Implement additional Emergency Plan Implementing Procedures according to the situation that resulted in the emergency being classified as a GENERAL EMERGENCY .

4.3.2.4 Direct the Security Director to call in Onsite and Offsite Emergency Organization personnel by utilizing the appropriate computer call-out listing.

4.3.2.5

,/ T (j Direct the STSC Communicator to prepare Appe instructions provided in Appendix E.

4.3.2.6 Determine the need for offsite assistance. If assistance is necessary, direct the STSC Communicator (onshift) or Administrative and Logistics Coordinator to contact the required agency per EPIP-33, "Offsite Assistance".

4.3.2.7 Reevaluate the emergency classification and perform licensee actions procedure EPIP-02.as conditions change by implementing 4.3.2.8 When the situation warrants downgrading from a GENERAL EMERGENCY, proceed to appropriate implementing and notification procedures and direct the Shift Supervisor to announce the downgrading over the public address system and inform the other Control Rooms.

4.3.2.9 The Emergency Appendix H. Coordinator shall complete checklist, 4.3.3 PVNGS Security, after being notified by the Emergency Coordinator or STSC Communicator that a Ceneral Smergency is in progress or has occurred, shall complete Appendix B,

" Emergency Notification Call List - PVNGS Security " and ,

notify these individuals or departments of the situation.

O \

~~'""  !

CONTROLLED DOCUMENT

I CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE N O. [

IMPLEMENTING PROCEDURE EPIP-06 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS S Page 9 of 34 4.3.4 Operations Support Center (OSC) Activation 4.3.4.1 The OSC Coordinator shall i=plement EPIP-12, " Operations i Support Center Activation".

f 4.3.5 Emerge'ncy Operations Facility (EOF) Activation '

l 4.3.5.1 The Emergency Operations Director shall implement procedure EPIP-13 " Emergency Operations Facility 4

Activation".

f4 4.3.6 Eme'rgency Situation Terminated 4.3.6.1 The Shift Supervisor (or E=ergency Coordinator) shall sound the "All Clear" signal for approximately (1) minute, silence the signal, and provide the followf announcements over the plant wide page (phone no.

and the site warning siren /public address system:

"Attentien all personnel. The emergency situation declared in Unit has now been terminated. (Provide special instructions as necessary.)

4.3.6.2 Repeat signal and announcement once.

4.3.6.3 Within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of closecut from a General Emergency classification, provide a written summarv to offsite authorities, in accordance with 'Even t Related Reporting .

4.3.7 Record Retention 4.3.7.1 Appendices A, B, C, D, and H shall be turned over to the Emergency Planning and Preparedness Dept., mail station 6010 to ensure they are forwarded to DDC for proper storage in accordance with Document and Record Turnover Control".

O\

V

~ ~ "'

CONTROLLED DOCUMENT

. _ _ _ _ _ _ I* '

PVNGS EMERGENCY PLAN PROCEDURE , k

^

IMPLEMENTING PROCEDURE EPIP-06 ag f1 k REVISION f

GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 10 of 34 f S

d

[ $

y. .

A l gs s s s s ys s s s s E

l l .

i g i d

5 $

-q

  • 2 2

'E ,

t Oc ,

!S '

ca >

52 ,

S zi <

?5= E s

t> 1 is 5 53 D 5

5 5

s d

I, 1

I s t 3, s- at 6

2. 1 ti 52 5

y 2;t.S..

=

. bli a > 5 8:

? :D it 27 "  :: !!: , I

  • 2 E

j j' 8a ..* ' po 2*& Sa*

.-c5;  :*  ;

2 8

6 2?

3 d to it 2: !! i:2 * * '  ; "

V 2: 2: 23 RE 3Gr i 0 0 1**

G :.s x .2 .:.: .I.I 1

<. x m..i o2 f" f" a oW m s xo, e u, l

CONTROLLED DOCUMENT

> m .. 1.

{1 { ' ' l '- - . t I I .

b zH O C mZi-T<29 mE9R20 F2

)

1yog 3m A ZO L "EmIm Zi2 T8mC 2 ,~ f-5 Xto _

m**~m'OG ,~ O ~

D m5Z

,n ce Wt4 mx E Q a 2 r H .d p w _

, e n L m~ H ?s m&

M M

A c

Y T

_ I

_ Rl Mt.

_ i I

_ C I

/ / I / , /

/

S'I L I

$ A C D N

V P

I S

l t.

L L

A C

N M O N l #

l

_ A t

C I

LI A

IF M T R O f N i t

_ Y A C

N

_ E G

R t

M E

m N

tI.

Y

_ t

_ la l

m a .

P s

r u

o h

g n

i

_ y k

_ r it o r w u n n g I. a o o n A e u

e y S it 's t i i r

n a n c u t

y i o t

t r o ur y d l r i s it t c

n y o u t i a s er l m c c n c n ge n J e ur i o rt o

T/

S t d m in C u

en me tM t e s n

A m et IC le m b M a o r o i s t

n op r Ce a C S teo ta c e tr t A ei l P r ht a

_ r r tf c P cn v '

r. o if u N eo A

_ p C SO N A A BC

  • m4S? I 1

QOZ m FZ T

Ce f

)

.n ,

y :n 7

-- ~-

CONTROLLED DOCUMENT I ,)\

PVNGS EMERGENCY PLAN PROCEDURE N O.

6 APPENDIX C IMPLEMENTING PROCEDURE EPIP-06 Page 1 of 1 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 12 of 34 INITIAL EMERGENCY MESSAGE FORM NOTIFTCATION OF UNUSUAL EVENT, ALERT, SITE AREA EMERGENCY, OR GENERAL EMERGENCY 1.

Verbatim text of Message: THIS IS (I'S NOT) A DRILL!! (Circle One)

THIS IS PALO VERDE NUCLEAR GENERATING STATION (NOTIFICATION OF UNUSUAL EVENT) (ALERT) (SITE AREA EMERGENCY) (GENERAL EMERGENCY)

(cross out notifications above not applicable) "

declared at -

- Wind is from degrees - At mph.

(time) (date) (speed)

PALO VERDE AUTHEhTICATOR

2. This is (authenticator letters)

, at the Palo Verde Nuclear Generating ,

Station (name/ title)

3. (Circle One)

(a) There is M , repeat M , radioactive release taking place and no .

' special protective actions are recommended at this time.

[O OR i

' (b) There is NO, repeat M , radioactive release in excess of allowable operating limits and M protective action j recormendations at this time.

OR (c) There is NO, repeat NO, radioactive release taking place, however, the following protective actions are recommended at this time.

Sectors Distance (Miles) i l

OR (d) A radioactive release M , repeat M , taking place. We recommend that people in affected sectors remain indoors with windows and

doors closed.

i l Sectors Distance (Miles)

(

l OR (e) A radioactive release M , repeat M , taking place. We recommend that evacuation of affected sectors be considered.

Sectors Distance (Miles)

A v h l

l 4 THIS IS (I'S NOT) A DRILLI! (Circle One)

~ ~^'"" Approved _ _ _ _ _ _

_....a .

1 CONTROL 1.ED DU5 UmtsNi me

m a.,, _: ,r . . - '" '

" ^

" ~ ~~ ~

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN [ROCEDURE N/ APPENDIX D IMPLEMENTING PROCEDURE EPIP-06 Page 1 of 3 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 13 of 34 FOLLOW-UP EMERGENCY MESSAGE FORM

1. Verbatim text of Message: THIS IS (IS NOT) A DRILL!! (Circle One) .

THIS IS A PALO VERDE NUCLEAR GENERATING STATION follow-up information I message concerning the (NOTIFICATION OF UNUSUAL EVENT) (ALERT) (SITE AREA EMERGENCY) (GENERAL EMERGENCY)

(cross out notifications above not applicable) "

declared at -

(time) (date) e

2. This is , at Palo Verde Nuclear Generating Station.

(name/ title)

{,

3. Meteorological Data '

t a. Wind direction from (degrees) - at miles per I

hour (direction) (speed) from to (sector) (sector)

b. Stability Class: ABCDEFG (Circle One)
c. Precipitation Yes No (Circle One)
4. Radiological Data
a. Radioactvity (check one) l

( ) Has been released

( ) Has not been released l

O

~ ~ ^ ~

CONTROLLED DOCUMENT

._ . ~ ~

~ CONTROLLED DOCUMENT ^

-m s

PVNGS EMERGENCY PLAN (j,

IMPLEMENTING PROCEDURE PROCEDURE N O.

ATPENDIX D EPIP-06 Page 2 of 3 REVISION

  • GENERAL EMERGENCY IMPLEMENTING ACTIONS S Page 14 of 34
4. b. Release Time
c. Reactor Trip Time i d.

Location / Source of Release .

5. Current Release Rates O
a. I-131 Equivalent
b. Noble Gas Ci/second
c. Particulates Ci/second Ci/second 6.

Two-hour plume centerline projected dose at:

Distance Sector Whole Body Child Thyroid '

Dose (REM) Dose Commitment (REM)

/m \

k I Site Boundary l

l 2 miles I

5 miles 10 miles

7.  !

Plume arrival time offsite:

2 mi 5 mi

. 10 mi Ruth Fisher School Arlington School -

8.

Estimated duration of release minutes PV216 00DA (8:82)  !

CONTROLLED DOCUMENT .

' ~

~;;

~

~2gme! JD: [ ~ _ __ ; . ._ L . .

'~~9;[ ~- .- . -.

CONTROLLED DOCUMENT

( PVNGS EMERGENCY PLAN PROCEDURE q' NO.

-[

APPENDIX D IMPLEMENTING PROCEDURE EPIP-06 Page 3 of 3 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 15 of 34

9. The Following Emergency Measures Including Protective Actions are -

Recommended: '

10. The Following Emergency Reponse Actions are Underway:

k

,C'\ 11. We Request the Following Onsite Support and Assistance from Offsite

( / Sources:

12. Our Prognosis of the Emergency is that Conditions:

Are Under Control Can Be Expected to Terminate Within hours Are Worsening

13. Other Information:
14. THIS IS (IS NOT) A DRILLI1 (Circle One)

CONTROLLED DOCUMENT

.; g ,- + ., .

~

CONTROLLED DOCUMENT

[O PVNGS EMERGENCY PLAN PROCEDURE C IMPLEMENTING PROCEDURE N O.

APPENDIX E h

EPIP-06 Page 1 of 3 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 16 of 34 INSTRUCTIONS FOR COMPLETING APPENDIX C OR D 1.0 INITIAL EMERGENCY MESSAGE FORM (APPENDIX C) 1.1 Fill in dataMessage Emergency required by steps Form". 1 and 2 of Appendix C, " Initial Obtain authenticator from the confidential envelope marked on the outside with the appropriate ,

month and drill sequence number (if it is a drill).

1.2 Obtain from the Radiation Protection Monitor (onshift) or Radiological Assessment Coordinator (if EOF is activated) data required to complete step 3 of Appendix C.

1.3 Circle appropriate wording of step 4 of Appendix A.

NOTE When the NAN ring button is pushed and it appears that all the receiving stations are on b() line, or, the ring has stopped, the PVNGS originating station shall initiate a roll call in the order listed below. (Consider the time of day.)

NOTE If the NAN dedicated telephone fails, refer to Appendix F, " Notification Alert Network (NAN)

Radio Backup", for instructions on using channel 8, KON-Sil, for notification.

1.4 By means of a single call on the Notification and Alert Net dedicated telephone, listed in Appendix A. contact the following State / County agencies Duty Hours (8:00 a.m. to 5:00 p.m. Monday-Friday)

Maricopa County Sheriff's Office Maricopa County Department of Civil Defense and Emergency Services Arizona Department of Public Safety Arizona Division of Emergency Services Arizona Radiation Regulatory Agency

(

V)

CONTROLLED DOCUMENT -

i

)

1

., sy ms .-

~~ ~

i ONTRdLLED Da~CUMENT~ '

l m'

PVNGS EMERGENCY PLAN PROCEDURE N O. $

'~

IMPLEMENTING PROCEDURE EPIP-06 APPENDIX E Page 2 of 3 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS S Page 17 of 34 Off-Duty Hours (5:00 p.m. to 8:00 a.m., Monday-Friday, all day Saturday, Sunday and holidays)

Maricopa County Sheriff's Office Department of Public Safety 1.5 When contact is made, the caller shall identify himself and '

Emergency Message Form. request that the individuals obtain a copy of th 1.6 When each individual has obtained a copy, read the completed Emergency Message Form verbatim and request MCSO to read back verbatim. Perform warning point roll call.

1.7 Offer to repeat information and reiterate as necessary.

1.8 Notify additional personnel as listed in Appendix A as necessary and inform them of the situation.

for the Group Paging System Notification and Callout: Provide the followin

( ) "This is PVNGS, Unit _ , Classification Two, Please respond appropriately." (Repeat message once).

1.9 If an individual requests information not contained in the Emergency Message Form, make reasonable efforts to obtain and give the information only after all _ initial notification have been made.

1.10 Contact the NRC via the Emergency Notification System (ENS) dedicated telephone within 60 minutes of declaring an emergency.

If the ENS fails, use commercial phone or HPN phone as an alternate line.

1.11 When contact is made, the caller shall identify himself and read the completed Emergency Message Form verbatim (omit the Palo Verde Authenticator).

1.12 Offer to repeat information and reiterate as necessary.

,/

I $

J i

~"*""^

CONTROLLED DOCUMENT

~CONTR~O~LLED~DOCOMENT c

/s PVNGS EMERGENCY PLAN v) PROCEDURE s

s N O.

APPENDIX E

  • f IMPLEMENTING PROCEDURE EPIP-06 Page 3 of 3 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 18 of 34 2.0 FOLLO"_-UP EMERGENCY MESSAGE FORM (APPENDIX D) 2.1 Emergency Message Form". Fill in data required by steps 1 and 2 o 2.2 Assessment complete steps 3-9.

Coordinator (If EOF is activated) data ,

2.3 Obtain from the Emergency Coordinator or the Technical Analysis Coordinator 10-13. .

(If EOF is activated) data required to complete steps 2.4 Circle appropriate wording in step 14, 2.5 Dispense information when asked by offsite agencies (NRC or ARRA) n V

l l

1 e l 1NJ; l Pv2*6 0c0A to sa CONTROLLED DO.CUMENT

- _ ____ m

,~ ,  ; ~, .

~

. ~ ^ ^ ^

CONTRdf.LE[iddCOMENT O

i i PVNGS EMERGENCY PLAN PROCEDURE V

i NO.

APPEhTIX F IMPLEMENTING PROCEDURE EPIP-06 Page 1 of 2 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS S Page 19 of 34 NOTIFICATION ALERT NE'IVORK (NAN) RADIO BAChTP Channel 8 - KON511 .

In case of failure of the NAN ringdown telephone, the NAN backup is Channel 8 on the PVNGS radio. FCC regulations require the Palo Verde Designator 'KON511' be used to precede and conclude all outgoing communications.

1. Take control of the radio channel by saying: "All stations this net,"

(Repeat) "All stations this net, this is K-0-N 3-1-1 Palo Verde.

5-1-1 Palo Verde to all 5-1-1 stations, stand by for Warning Point roll call."

2.

Wait thirty seconds to allow the offsite agencies to get to their radios, then repeat the previous transmission.

j NOTE t i

p)

(

V After 5 P.M. weekdays, all day Saturday, Sunday or holidays, Maricopa County Sheriff's Office (MCS0) and Department of Public Safety (DPS) will be the only agencies responding.

3.

Initiate roll call of the offsite government agencies, allowing stations on the net to respond.

3.1 "5-1-1 Palo Verde to 5-1-1 Maricopa County Sheriff's Office.

Do you copy?"

Allow Response: "5-1-1 MCSO copies."

3.2 "5-1-1 Palo Verde to 5-1-1 Maricopa County Department of Civil Defense f Emergency Services. Do you copy?" (MCDCD&ES)

Allow response: "5-1-1 Civil Defense copies."

3.3 "5-1-1 Palo Verde to 5-1-1 Department of Public Safety.

copy?" Do you Allow response: "5-1-1 DPS copies."

3.4

- "5-1-1 Palo Verde to 5-1-1 Arizona Division of Emergency Services. Do you copy?"

Allow response: "5-1-1 ADES (State EOC) copies."

3.5 "5-1-1 Palo Verde to 5-1-1 Arizona Psdiation Regulatory Agency. Do you copy?"

Allow response: "5-11 .'ahA copies." .

! O)

V l

l

~'~""

CONTROLLED DOCUMENT

y -

, y

~_ _ _3. ,_. . .

~,

, wi; 33 ;g ., y . m y,;;w

\ PVNGS EMERGENCY PLAN CENRE

[R APPENDIX F IMPLEMENTING PROCEDURE EPIP-06 Page 1 of 2 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 20 of 34

4. Upon completion of roll call, transmit the notification message verbatum. Take acknowledgement roll call, allowing MCSO to read the message back in its entirety, and provide assistance or clarification, as needed.
5. Upon completion of the second roll call, announce: "K-0-N 5-1-1 Palo Verde off." This is the required FCC sign-off. '
6. Continue notification per Step 1.8 Appendix E.

r O

~'""'""

CONTROLLED DOCUMENT

y4 u ,

.c.- . , .. ,

u,. >q4 - 7 ..

CONTROLLED DOCUMENT ~

m .

n 1/ \ PVNGS EMERGENCY PLAN PROCEDURE I

V IMPLEMENTING PROCEDURE N O.

EPIP-06 APPENDIX G Page 1 of 2 REVISION GEN 5RAL EMERGENCY IMPLEE NTING ACTIONS S Page 21 of 34  ;

-PROTECTIVE ACTION RECOMMENDATIONS Classification Protective Actions Category Recommendations

-4

1. A General Emergency has been declared if:

i (imminent / actual loss of physical Consider a 2 mile '

. control of the plant) precautionary evacuation.,

2. A General Emergency has been declared and large amounts of fission products are in In addition to considering a 2 mile' evacuation, consider the containment atmosphere. The projected a 5 mile downwind evacuation '

dose using containment area monitor readings of potentially affected is calculated to be: sectors.*

a) whole body > 5 rem b) thyroid > 25 rem

3. A General Emergency has been declared and

' containment failure leading to a direct In addition to considering a '

_ atmospheric release is likely in the 2 mile 360' precautionary >

h sequen'ce but not imminent and large evacuation, consider a precau-tionary 360* evacuation to 5 amounts of fission products in addition '

to noble gases are in the containment miles and a downwind evacuation atmosphere. The projected dose using to 10 miles of potentially af-containment area monitor readings is fected sectors. *  ;

calculated to be:

a) whole body > 5 rem b) thyroid > 25 rem 4

A General Emergency has been declared and large amounts of fission products other In addition to considering a than noble gases in the containment 2 mile 360* precautionary s

atmosphere and containment failure is evacuation consider a precau-tionary 360' evacuation to 5 '

judj;ed imminent. The projected dose using miles and a dc,wnwind evacuation containment area monitor readings is calculoted to be: to 10 miles of potentially af-a) whole body > 5 rems fected sectors,* and consider b) thyroid > 25 rems shelter for areas where evacuation cannot be completed before the transport of activity to those areas.

( v) Plume width is equal to 3 sigma y (as a minimum, the downwind sectors and adjacent sectors).

PV216 000A 18 82)

CONTROLLED DOCUMENT -

m>.~. -

_. t_ _ -

M* ~~ ~ , CONTROLLED DOCUMENT (O

'v j PVNGS EMERGENCY PLAN PROCEDURE N O.

APPENDIX G I

IMPLEMENTING PROCEDURE EPIP-06 Page 2 of 2 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS S Page 22 of 34 t

PROTECTIVE ACTION RECOMMENDATIONS (CONT'D) .

Classification Category Protective Actions Recommendations t 5.

An actual release has occured and the Recommend seeking shelter,360*

i projected does t6 individuals in the -

,  ; population is calculated to be: for 2 miles and in a) whole body > 0.5 to < 1 rem affected sectors out to 10 b) thyroid > 1.0 to < 5 rems miles.

i 6.

An actual rele'ase has occured and the projected does to individuals in the Recommend a 360' evacuation for

  • population is calculated to be: 2 miles and in affected sectors
  • out to 10 miles. {

a) whole body > 1 rem to < 5 rems t b) thyroid > 5 rems to < 25 rems Recommend seeking shelter 360' out to 10 miles. f n

I f ) 7. i V An actual release has occured and the projected does to individuals in the Recommend a 360' evacuation for population is calculated to be: 5 miles and in affected i a) whole body > 5 rems sectors

  • out to 10 miles.

b) thyroid > 25 rems Recommend seeking shelter 8

360 out to 10 miles. I Plume width is and adjacent equal to 3 sigma y (as a minimum, the downwind sector (s) sectors).

.s i i V

PV216 000A (8 82) ~

CONTROLLED DOCUMENT .

_ c - . -

s .

CONTROLLED DOCUMENT i

{

PVNGS EMERGENCY PLAN PROCEDURE NO. [

APPENDIX H

  • IMPLEMENTING PROCEDURE EPIP-06 Page 1 of 12 j

REVISION GE!ERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 23 of 34

}

CHECKLIST EMERGENCY COORDINATOR I STSC ACTIVATED POSITION FILLED BY: .

1) PVNGS Plant Manager ~
2) Manager, Technical Support  !
3) Shift Supervisor  ;

RESPONSIBILITY:

The individual onsite with the responsibility and authority i to immediately and unilaterally initiate emergency actions, including providing notification and protective action i recommendations to Governmental authorities responsible for implementing offsite emergency measures. Provide for the control and coordination of onsite emergency response. }

4 NOTE Refer to the following pages per appropriate facility activation Facility Activated Appendix H Page STSC 1-4 TSC 5-8 TSC/ EOF 9 - 12 INITIAL RESPONSE TIME / INITIALS 1.

Receive notification from the Shift Supervisor and report /

to the Control Room of affected unit.

2.

Review plant status, initiating event, corrective actions /

and emergency classification with the Shift Supervisor.

3.

< Assume the position of onshift Emergency Coordinator. /

4. Activate the Satellite TSC per EPIP-11. " Technical Support Center / Satellite TSC Activation." /
5. Commence notification pr:acess per Appendix E or

/

g, direct STSC Communicator to do so. -

(1) Direct the Security Director to call in the PVNGS /

onsite and offsite Emergency Organization personnel.

W216 000A (8'82)

CONTROLLED DOCUMENT

w:mm g W.;a

-- a AA- ~~~--- .

'~*'

..__m..

CONTROLLED DOCUMENT

[^N PVNGS EMERGENCY PLAN PROCEDURE

-( f i

V IMPLEMENTING PROCEDURE NO.

EPIP-06 APPENDIX H Page 2 of 12 ,

REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 24 of 34 I, t

i CHECKLIST EMERGENCY COORDINATOR STSC ACTIVATED i

SUBSEQUENT RESPOSSE TIME / INITIALS 6.

Verify personnel resources are on standby in the OSC.

7.

Reevaluate the emergency classification as conditions

/

change per EPIP,-02, reclassify as necessary. .

8.

As necessary, direct implementation of EPIP-23, " Fire i

Fighting" and EPIP-22, " Personnel Injury."

I (1) For a fire, dispatch Fire Team and order the Secur-  !

e ity Director to contact the Bechtel or alternate /

offsite fir'e dept. for assistance (if required).

(2) For personnel injury, contact the First Aid Station /

and inform them of the situation. Dispatch a First Aid Team, offsite if necessary, and coordinate any req 2 ired assistance, i

j

9. j Determine any additional protective action recommendations t

/

to be provided to state and county response agencies per '3 EPIP-15, " Protective Action Guidelines."  !

10.

As appropriate, complete Follow-up Emergency Message Form. '

/

11.

Determine need for offsite support and direct the STSC ,

Communicator to call location (s in EPIP-33, "Offsite /

Assistance" and arrange access w)ith the Security Director .

per EPIP-24, " Security."

. Personnel Assembly and Accountability 12.

Within 30 minutes of the accountability signal, receive a /

report onDirector.

Security accountability in the protected area from the 13.

Receive a report on site accountability later.

/

14 Be prepared to implement EPIP-21, " Search and Rescue,"

f) by providing necessary data to the OSC Coordinator. /

V PV216-000A (8 82)

CONTROLLED DOCUMENT c _ _ _ _ _ w-_ _ - - - - - - - - - - - - - - - -- --

,,,=-_w-

.7 CONTROLLED DOCUMENT .

p PVNGS EMERGENCY PLAN PROCEDURE V IMPLEMENTING PROCEDURE NO.

EPIP-06 APPENDIX H

{

Page 3 of 12 I REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 25 of 34 '

CHECKLIST EMERGENCY COORDINATOR STSC ACTIVATED Emergency Exposures and KI TIME / INITIALS 15.

Per EPIP-18, " Emergency Exposure Guidelin  !

necessary, authorize emergency exposures.es," and as /

16.

As necessary, authorize administration of KI per EPIP-26, /

" Potassium workers Iodfdeto(KI) desiring useAdministration" it. to emergency Protection Monitor. Consult with the Radiation j

I TSC Activation and Transfer of Authority i

17. .

I

[cs]/

\

When relieved by the onsite Emergency Coordinator provide a briefing and transfer responsibilities. /

'O OSC Activation 18.

If a release is occurring, consult EPIP-12, i

" Operations Support Center Activation," to determine _

/

habitability of primary OSC.

19. I If uninhabitable, direct the OSC Coordinator to relocate

/

staff and equipment / supplies to the alternate OSC (Service Building).

If this is also uninhabitable, direct the OSC STSC, TSC or to Coordinator relocate to a protected area (Control Room / 1 EOF).

Security 20.

As necessary, implement EPIP-24, " Security," and order the Security Director to limit access to the station, /

contact Maricopa County Sheriff's Office for assistance g in controlling site access, and arrange access for neces-sary personnel not on the Emergency Personnel Access List and/or not having access to the protected area via card-key system.

21.

Ensure the Security Director is appraised of offsite assistance requests to arrange access. /

( '3 y,

('j 22.

Determine needs, consult with staff, authorize reentry per EPIP-25, " Reentry for Emergency Operations." /

Pv216-000A (8;82)

CONTROLLED DOCUMENT

.yy gy . ; y 3 _a = -

m -,

~

.. . CONTROLLED DOCUMENT r

/

r PVNGS EMERGENCY PLAN PROCEDURE

( IMPLEMENTING PROCEDURE N O.

EPIP-06 APPENDIX H Page 4 of 12 j

REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 26 of 34 CHECKLIST EMERGENCY COORDINATOR i

STSC ACTIVATED '

Assessment Actions TIME / INITIALS l 23.

Ensure that the Radiation Protection Monitor or is /

obtaining needed data using EPIP-14A, " Release Rate Determination," EPIP 14B, " Initial Dose Assessment," '

EPIP-16, "Inplant Surveys and Sampling" and EPIP-17, '

"Onsite/Offsite Surveys and Sampling."

Protective Actions i 1

24.  !

Continue to evaluate the need for providing any additional protective action recommendations. '

/

) 25.

(,,/ Determine need for early dismissal / evacuation of non-essentials per EPIP-19, "Onsite Evacuation." / I 26.

Establish evacuation order, offsite reassembly area, evacuation route and inform the Security Director. /

27.

Order evacuation signal when the Security Director i reports that preparations are complete. /

i Performed By Date Signature O c PV216-000A (8/82)

CONTROLLED DOCUMENT

. n g ,; , g . 4 ,, , p .. . r ..

_ _a__. -- . .-

. l- ~~"****'""" ~ #

~ '

CONTROLLED DOCUMENT

~

f PVNGS EMERGENCY PLAN PROCEDURE [

N O.

b APPENDIX H IMPLEMENTING PROCEDURE '

EPIP-06 Page 5 of 12 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 27 of 34 CHECKLIST EMERGENCY COORDINATOR TSC ACTIVATED -

TIME / INITIALS ,

INITIAL RESPONSE '

1. Receive notification from the onshift Emergency Coordi- /

nator and report to the TSC. Upon arrival, sign in on '

the TSC Staffing Board

2. Receive a briefing from the onshift Emergency Coordi- /

nator and assume responsibilities. .

3. Brief TSC staff and evaluate adequacy of TSC activation. /

l

4. Declare the TSC operational and inform the STSC, Control CN Rooms, EOF, ANPP Site Construction Office, Bechtel

/

Emergency Control Center and PVNGS Security.

5. As necessary continue with or commence notification /

process per Appendix E or direct the STSC Communicator to do so.

6. Verify personnel resources are on standby in the OSC. /

SUBSEQUEh"I' RESPONSE

7. Reevaluate the emergency classification as conditions /

change per EPIP-02 " Emergency Classification," reclassify as necessary.

8. As necessary, direct implementation of EPIP-23, " Fire /

Fighting" and EPIP-22, " Personnel Injury."

e v

PV216-ODOA (6/82)

CONTROLLED DOCUM.ENT

. , n. a: m.-- +.

- ' ~

CONTROLLED DOCUMENT i i

fl m PVNGS EMERGENCY PLAN PROCEDURE

/x IMPLEMENTING PROCEDURE N O.

APPENDIX H EPIP-06 Page 6 of 12 REVISION '

GENERAL EMERGENCY IMPLEMENTING ACTIONS !l 5 Page 28 of 34 '

i, il CHECKLIST i EMERGENCY COORDINATOR TSC ACTIVATED  !'

h TIME / INITIALS -

(1) For a fire, dispatch Fire Team and order the Security

/

Director to contact the Bechtel or alternate offsite ,

fire department for assistance (if required). ,

(2) For personnel injury, contact the First Aid Station /

and infort:i them of the situation. Dispatch a First Aid Team, if necessary, and coordinate any required offsite assistance. p 1

9.

Determine any additional protective action recommendations /

I to be provided to state and county response agencies por 7 EPIP-15, " Protective Action Guidelines."

l f\

sj 10.

(

As appropriate, complete Follow-up Emergency Message Form. /

l 11.

! Determine the need for offsite support and direct the STSC /

Communicator to call location (s) in EPIP-33, "Offsite  ;

Assistance," arrange access with the Security Director i per EPIP-24, " Security". i Personnel Assembly and Accountability i

12. i Within 30 minutes of the accountability signal, receive /

a report on accountability in the protected area from the Security Director.

13. Receive a report on site accountability later.

/

14.

Be prepared to implement EPIP-21, " Search and Rescue," /

by providing necessary data to the OSC Coordinator (via Emergency Maintenance Coordinator).

Emergency Exposures and KI 15.

Per EPIP-18, " Emergency Exposure Guidelines," and as

/

necessary, authorize emergency exposures.

t l PV216 000A 18r82) m.

CONTROLLED DOCUMENT

y ..

c. _ 7w u :w_ - -

, ,, c_

CONTROLLED DOCUMENT i

~. s c ,

r ,

PVNGS EMERGENCY PLAN PROCEDURE

) _ IMPLEMENTING PROCEDURE NO.

APPENDIX H EPIP-06 Page 7 of 12 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 29 of 34 CHECKLIST

~ .IMERGENCY COORDINATOR TSC ACTIVATED 1

16. TIME / INITIALS '

As necessary, authorize administration of KI per EPIP-26 to emergency workers desiring to use it. /

the Radiological Protection Coordinator. Consult with ,

OSC A_ctivation 17.

If a release is occurring, consult EPIP-12,

" Operations Support Center Activation," to determine / i habitability of the primary OSC.  !

i

18. ,

If uninhabitable, direct the OSC Coordinator to relocate t

/ "N staff and equipment / supplies to the alternate OSC (t.ervice Building).

/

[

'd

) If this is also unihabitable, direct the OSC STSC, TSC or EOF). Coordinator to relocate to a protected area (control roo .

i EOF Activation .

' l.

.19.  :

Per EPIP-13, " Emergency Operations Facility Activation," i brief the Emergency Operations Director and transfer the /

}

responsibilities for notifications and protective action recommendations. ,

Security 20.

As necessary, implement EPIP-24, " Security," and order the Security Director to limit access to the station ,

/

contact Maricopa County Sheriff's Office for assistance in controlling site access, and arrange access for necessary personnel not on the Emergency Personnel Access List and/or card-key not having access to the protected area via system. ,

21.

Ensure the Security Director is appraised of offsite I assistance requests to arrange access. /

Corrective Actions

  • 22.

9 Determine needs, consult with staff, authorize reentry per EPIP-25, " Reentry for Emergency Operations." / '

me ooos is sa CONTROLLED DOCUMENT

m ,zy w ms ,

- _ - . -~ , _ , . __ ~~. -

.. . CONTROLLED DOCUMENT ,

I t

r_ s PVNGS EMERGENCY PLAN T

('# )

PROCEDURE N O.

APPENDIX H I

IMPLEMENTING PROCEDURE EPIP-06 Page 8 of 12 REVISION 5

GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 30 of 34 i, i

i CHECKLIST EMERGENCY COORDINATOR TSC ACTIVATED i TIME / INITIALS

_ Assessment Actions 23.

Ensure that the Radiological Protection Coordinator is '

obtaining needed data using EPIP-14A, " Release Rate /

Determination," EPIP-14B, " Initial Dose Assessment,"

EPIP-16, "Inplant Surveys and Sampling" and EPIP-17, "Onsite/Offsite Surveys and Sampling."

1 Protective Actions 24.

Continue to evaluate the need for providing any additional t 7 protective action recommendations. / '

(' 25.

Determine the need for early dismissal / evacuation of non-essentials per EPIP-19, "Onsite Evacuation." /

26.

Establish evacuation order, offsite reassembly area, evacuation route and inform the Security Director. /

27 Order evacuation signal when the Security Director reports t that preparations are complete. /

Recovery 28.

After the EOF is activated, consult with the Emergency /

Operations

" Recovery." Director concerning implementing EPIP-31, Performed By Date '

Signature 9

O PV216 000A (8<82)

CONTROLLED DOCUM.ENT I

,m ., ,

I ~, ._ - . - . - . - . -- ^

- - - -- '~~

~ ~

.. . CONTROLLED DOCUMENT 1 PVNGS EMERGENCY PLAN m esouns i

) W.

APPENDIX H T!

N. s IMPLEMENTING PROCEDURE EPIP-06 Page 9 of 12 REVISION ,

GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 31 of 34 i

CHECKLIST ,

EMERGENCY COORDINATOR TSC and EOF ACTIVATED INITIAL RESPONSE 1.

Receive nator andnotification form the onshift Emergency Coordi-report to TSC. /

TSC Staffing Board. Upon arrival, sign in on the 2.

Receive a briefing frcm the onshift Emergency Coordinator .

and assume responsibilities. /

t 3.

Brief TSC staff and evaluate adequacy of TSC activation. i'

/

4.

.~

Declare the TSC operational and inform the STSC, Control

/ k Rooms, EOF, ANPP Site Construction Office, Bechtel Emergency '

[' ] Control Center and PVNGS Security.

5.

Per EPIP-13, " Emergency Operations Facility Activation," /

brief the Emergency Operations Director and transfer the responsibilities for notifications and protective action recommendations.

6.

Verify personnel resources are on standby in the OSC.

/

SUBSEQUENT RESPONSE 7.

Reevaluate the emergency as conditions change per EPIP-02, /

" Emergency Classification," reclassify as necessary.

8.

As necessary, direct implementation of EPIP-23, " Fire Fighting" and EPIP-22, " Personnel Injury." /

(1) For a fire, dispatch Fire Team and order the Secur-ity Director to contact the Bechtel or alternate _

/

l offsite fire department for assistance (if required).

(2) For personnel injury, contact the First Aid Station /

and inform them of the situation. Dispatch a First Aid Team, if necessary, and coordinate any required offiste assistance.

  • O r Pv216@0A (8.82)

CONTROLLED DOCUMENT

ws ;m --

.~ gg,m;w T'~f.. CONTRdLLE6 DbCUhisNT~~

[N PVNGS EMERGENCY PLAN PROCEDURE .

h

( IMPLEMENTING PROCEDURE NO.

EPIP-06 APPENDIX H Page 10 of 12 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 32 of 34 CHECKLIST EMERGENCY COORDINATOR TSC and EOF ACTIVATED '

TIME / INITIALS

9. Determine the need for offsite support and direct the STSC /

Communicator to call location (s) in EPIP-33, "Offsite Assistance," arrange access with the Security Director per EPIP-24, " Security," and coordinate with the Administrative and Logistics Coordinator at the E0'I.

Personnel Assembly and Accountability

10. Within 30 minutes of the accountabilty signal, /

receive a report on accountability in the protected area from the Security Director.

11.

(J)

Receive a report on site accountability later. /

12.

Be prepared to implemen: EPIP-21, " Search and Rescue," /

by providing necessary data to the OSC Coordinator (via l Emergency Maintenance Coordinator).

Emergency Exposures and KI

13. Per EPIP-18, " Emergency Exposure Guidelines," and as /

necessary, authorize emergency exposures.

! 14. As necessary, authorize administration of KI per EPIP-26 /

to emergency workers desiring to us it. Consult with the Radiological Protection Coordinator.

OSC Activation

15. If a release is occuring, consult EPIP-12, /

" Operations Support Center Activation," to determine habitability of primary OSC.

16. If uninhabitable, direct the OSC Coordinator to relocate /

staff and equipment / supplies to the alternate OSC (Service Building). If this is also uninhabitabic, direct the OSC Coordinator to relocate to a protectied

,. area (Control Room /STSC, TSC or EOF).

\

Pv216-000A (6%

CONTROLLED DOCUMENT

.g4 . . , -- --- ,

, = , - wc s CONTROLLED DOCUMENT

,Oi PVNGS EMERGENCY PLAN PROCEDURE V IMPLEMENTING PROCEDURE NO.

EPIP-06 APPENDIX H Page 11 of 12 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS 5 Page 33 of 34 CHECKLIST i'

EMERGENCY COORDINATOR TSC and EOF ACTIVATED Security TIME / INITIALS 17.

As necessary, implement EPIP-24, " Security," and order /

the Security Director to limit access to the station, contact Maricopa County Sheriff's Office for assistance in controlling site access, and arrange access for neces-sary personnel not on the Emergency Personnel Access List and/or not having access to the protected area via card-key system.

18. Ensure the Security Director is appraised of offsite ~

/

assistance requests to arrange access.  ;

.m T

[G 19.

~

Corrective Actions i Determine needs, consult with staff, authorize reentry /

per EPIP-25, " Reentry for Emergency Operations."

Assessment Actions

20. Ensure that the Radiological Protection Coordinator is /

obtaining needed data using EPIP-14A, " Release Rate Determination," EPIP-14B, " Initial Dose Assessment,"

EPIP-16, "Inplant Surveys and Sampling" and EPIP-17, "Onsite/Offsite Surveys and Sampling."

Protective Actions

21. Determine the need for early dismissal / evacuation of /

non-essentials per EPIP-19, "Onsite Evacuation."

22.

Establish eavcuation order, offsite reassembly area, /

evacuation route and inform the Security Director.

23.

Order evacuation signal when the Security Director report that preparations are complete. /

\

PV216 000A (8 82)

CONTROLLED DOCUMENT

, , , . i w.

3.;_,, , , ;,, ;8, , 7.- ,

., 9 ,

. a:-.

~

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN

.O PROCEDURE .

N O.

IMPLEMENTING PROCEDURE APPEhTIX H EPIP-06 Page 12 of 12 REVISION GENERAL EMERGENCY IMPLEMENTING ACTIONS S Page 34 of 34 '

CHECKLIST EMERGENCY COORDINATOR TSC and EOF ACTIVATED Recovery 24.

i Consult with the Emergency Operations Director concerning implementing EPIP-31, " Recovery." /

Performed By Date Signature l

C B

C a PV216 000A (8:82)

CONTROLLED DOCUMENT -

! CONTROLLED DOCUMENT .

PVNGS EMERGENCY PLAN Qccouns IMPLEMENTING PROCEDURE fPIP-38

\ EMERGENCY EQUIPMENT AND EM ON SUPPLY INVENTORY 5 Page 1 of 35  :

o U

l ASSIGNED COPY 11VNGS . . . A8-% n 5

DEPT. HEAD k)M1) >-

!Oe 4F DATE [ $1 3 i l

PRB/PRG/TRRG REVIEW DATE 3 [

APPROVED BY M-u DATE 8

EFFECTIVE DATE D9 Al-96 "

t' DN-1670A/0196A -

PV216 000A (8/82)

CONTROLLED DOCUMENT O

5 CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN o

[ROCEDURE IMPLEMENTING PROCEDURE .

EPIP-38 EMERGENCY EQUIPMENT AND SUPPLY INVENTORY 5 Page 2 of 35 REVISION HISTORY Rev. No. Date Revised Pages Comments

/GOfb 5 7.DJ.2i farespner a few #c/

l ifC;22..RQR$ w du. 't, Cp < ,.prin g,, ,

// Mal $f.e dMWif he unu .--n, cua,,,

"'N v

i l

l l l l

{

I i

PY216 000A 18t82:

CONTROLLED DOCUMENT

6 CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN QCEME IMPLEMENTING PROCEDURE iPIP-38

[ t V EMERGENCY EQUIPMENT AND "

SUPPLY INVENTORY 5 '

Page 3 of 35 TABII 0F CONTENTS

_SECTION 1 l

4 PAGE NUMBER 1.0 OBJECTIVE de 5

2.0 REFERENCES

5 3.0 LIMITATIONS AND PRECAUTIONS t 5 \

4.0 DETAILED PROCEDURE 6

4.1 4.2 Personnel Indoctrination / Responsibilities Prerequisites 6 4.3 Instructions 6 6

V)

APPENDICES Appendix A - Emergency Storage at Unit One CR/STSC 9

Appendix B - Emergency Storage at Unit One OSC 11 Appendix C - Emergency Storage at Service Building 14

( Appendix D - Emergency Sto' rage at TSC 17

{ Appendix E - Emergency Storage at EOF 19 Appendix F - Emergency Vehicle Supply Inventory 21 Appendix G - Maryvale Samaritan Hospital Emergency Kit 24

}

Appendix H - Good Samaritan Hospital Emergency Kit 25 Appendix I - PVNGS Ambulance Emergency Kit 26 l

Appendix J - Offsite Ambulance Emergency Kit 27 Appendix K - Offsite Survey Team Emergency Kit A

  • 28 j

i i >

l

~~^*"'

l CONTROLLED DOCUMENT .

. I

CONTROLLED DOCUMENT l PVNGS EMERGENCY PLAN @ camne l IMPLEMENTING PROCEDURE $ PIP-38 EMERGENCY EQUIPMENT AND SUPPLY INVENTORY '

5 Page 4 of 35 APPENDICES (Cont'd)

PAGE NUMBER Appendix L - Offsite Survey Team Emergency Kit B 30

~

4 Appendix M - Emergency Onsite Evacuation Decontamination Kit 32 Appendix N - Offsite Decontamination Kit 33 Appendix 0 - Emergency Equipment and Supplies Inventory Schedule g 35 O

J

~~~'**  !

CONTROLLED DOCUMENT -

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN

@CEWRE IMPLEMENTING PROCEDURE $ PIP-38 EMERGENCY EQUIPMENT AND SUPPLY INVENTORY 5 Page 5 of 35 1.0 OBJECTIVE 1.1 To provide a means of assuring the operational readiness and availability PVNGS of equipment Emergency Plan. required for implementation of the

2.0 REFERENCES

2.1 Implementing References 2.1.1 78AC-0ZZ06, " Document and Record Turnover Control" 2.1.2 75PR-0ZZ01, " Radiation Protection Program" 2.1.3 75PR-0ZZO2, " Respiratory Protection Program" 2.1.4 75RP-9XC04, " Control of Radiation Protection Instrumentation"

{] 2.2 Developmental References 2.2.1 NUREG 0654, Rev. 1, " Criteria for Preparation and Evaluation of Radiological Support Emergency of Nuclear Response Plans and Preparedness in Power Plants" 2.2.2 Response Facilities"NUREG 0696, Feb. 1981, " Functional Criteria fo 2.2.3 PVNGS Emergency Plan, Rev. 5.

3.0 LIMITATIONS AND PRECAUTIONS 3.1 First-Aid equipment direction of the SafetyandDirector.

supplies shall be maintained under the 3.2 Equipment u and supplies utilized on a daily basis but which may be  !

used d' ringprocedures.

surveillance an emergency shall be maintained through existing O I Pv216-000A (8/82)

- CONTROLLED DOCUNjENT x

4 CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO. ,

/'~N IMPLEMENTING PROCEDURE EPIP-38 EMERGENCYEQUIPMENTEND "

SUPPLY INVENTORY 5 Page 6 of 35 4.0 DETAILED PROCEDURE 4.1 Personnel Indoctrination / Responsibilities 4.1.1 In order to insure the availability of equipment which may b,e required during the course of an emergency at PVNGS, the Site Emergency Planning Supervisor or his designee shall be responsible for conducting a quarterly inventory of emergency equipment and supplies. In addition, an inventory shall be conducted within five (5) working days after any drill using emergency equipment and/or supplies. Only those kits utilized during the drill shall be subject to the post-drill inventory.

4.2 Prerequisites NONE 4.3 Instructions 4.3.1 Dedicated emergency equipment and supplies located in the emergency lockers shall be inventoried quarterly and after each drill. Emergency lockers / kits are maintained at the following locations:

(1) Control Room /STSC of each unit (2) Operations Support Center (OSC) of each unit (3) Service Building (alternate OSC)

(4) TSC (5) EOF (Command Center)

(6) Emergency Vehicle (7) Maryvale Samaritan Hospital (8) Security Building (9) Annex Building, Security Desk (10)PVNGS Ambulance (11) Good Samaritan Hospital 4.3.2 6 Quarterly inventories shall be conducted as designated by the schedule in Appendix 0.

4.3.3 Inventory is accomplished by the Onsite Emergency Planning Group utilizing App'endices A through N. Each appendix contains the designated equipment for a specified emergency storage location.

v

~ ~ ^ ~

CONTROLLED DOCUMENT -

4 CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN Q cewne IMPLEMENTING PROCEDURE ~

EPIP-38 (mV) EMERGENCY EQUIPMENT AND REVISION SUPPLY INVENTORY

  • 5 Page 7 of 35 4.3.3.1 All blanks shall be filled on each appendix when inventoried. ,

4.3.3.2 If the shelf life of the battery as indicated by the manufacturer has expired, replace the battery. ,

4.3.3.3 If no shelf life is indicated, obtain a battery tester from the Group Radiation and test the Protection battery. IfInstrument Calibration the battery output falls in the red band of the tester, discard it and replace with a new battery.

4.3.4 Instruments and communications equipment stored in the emergency lockers shall be tested quarterly and after each use. Calibration of radiation survey instruments shall be conducted by the Radiation Protection Section and at intervals established by the Radiation Protection Section.

4.3.5

[3 b;

Respirators and respiratory protection equipment shall be maintained by the Radiation Protection Support Group, Repair, replacement, change-out shall be performed at intervals established per 75PR-0ZZ01, " Radiation Protection .

Program", and/or 75PR-0ZZO2, " Respiratory Protection Program."

4.3.6 Onsite Emergency Planning Group shall coordinate with Radiation Protection to ensure that in each emergency kit each type of personal dosimetry (i.e., 0-200 mR pocket dosimeters, 0-lR pocket dosimeters, Alarming dosimeters) should have the same calibration due date.

4.3.7 All instruments shall be reviewed as to their calibration due dates each quarterly inventory. Any instrument found to have a calibration due date in the three (3) months following the inventory shall be pulled from service. A,ny instrument pulled from service, out of calibration, or otherwise i inoperable shall be handled in accordance with 75RP-9XC04,

". Control of Radiation Protection Instrumentation", and a request shall be made to the Radiation Protection Support -

Group to provide an operable instrument as a replacement within a maximum of five (5) working days.

N PV216-000A (8.82)

CONTROLLED DOCUMENT

. CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN gesouns gs IMPLEMENTING PROCEDURE E" PIP-38

\

REVISION EMERGENCY EQUIPMEhT AND SUPPLY INVENTORY 5 Page 8 of 35 4.3.8 Materials and supplies, other than radiac instruments, found to be deficient or missing shall be replaced in a timely manner (Generally within 5 working days). Materials / supplies that must be purchased (i.e., Purchase Request, R.O.S., etc.)

shall be noted in the comments section of the appropriate appendix. The specific P.R. or R.O.S. should be tracked via' normal purchasing group / warehouse methods.

4.3.9 Records of the inventory and checks of emergency equipment shall be transmitted to DDC by the Supervisor, Site Emergency Planning as per 78AC-0ZZ06, " Document and Record Turnover Control", with e copy forwarded to the Manager, Emergency Planning and Preparedness.

4.3.10 Calibration records of radiation survey instruments shall be maintained by the Radiation Protection Section.

I U

~

( .

Pv216 000A (8'82)

CONTROLLED DOCUMENT

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

fm APPENDIX A IMPLEMENTING PROCEDURE $ PIP-38 Page 1 of 2 k .

'd REVISION EMERGENCY EQUIPMENT AND SUPPLIES INVEhTORY 5 Page 9 of 35

. EMERGENCY STORAGE AT UNIT ONE CR/STSC BATI'ERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 1 Frisker w/ probe /

1 Portable Ion Chamber Survey Meter /

1 Portable air samplers /

1 100' extension cord /

2 A/S Heads /

1 Particulate A/S filters (box) /

15 AgX cartridges /

25 Charcoal A/S cartridges /

10 Respirators w/ filters /

10 Respirator filters (char.) /

12 SCBAs

/

, , 1 Aspirator bulbs l [,l 2 Alarming dosimeters /

/

5 Noble gas collection chamber (Marinelli beakers) /

1 Check source /

10 Full sets of P.C.'s /

1 Smears (box with folders) /

10 Signs with inserts

/

100' Barrier rope /

2 Clipboards /

1 Paper, yellow, lined (pkg) /

l 5 Pens / pencils

/

1 Log book

/

l 10 RAM labels /

2 Tape, Duct /

50 Plastic bags (various sizes) ,

/

1 Scissors /

2 9V transistor batteries /

1 First aid kit /

1 Set controlled copy of EPIPs /

3 One liter bottles /

l I

~~^*"'

CONTROLLED DOCU(MENT

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE N O.

<-~ APPENDIX A IMPLEMENTING PROCEDURE EPIP-38 Page 2 of 2 k' '

REVISION EMERGENCY EQUIPMENT AND SUPPLIES IhVENTORY 5 Page 10 of 35

. EMERGENCY STORAGE AT UNIT ONE CR/STSC (CONT'D)

BA'ITERY SERIAL CALIBRATION NUMBER RECHARGE /

DATE/ INITIALS DUE DATE REPLACEMENT 10 0-200 mR dosimeters '

/

10 0-1 R dosimeters /

10 0-100 R dosimeters /

15 Individual accountability report forms

/

1 Dosimeter charger /

2 'AA' batteries /

50 Dosimetry issue forms /

2 Flashlights 10 'D' cell batteries /

/

1 Knife w/ spare blades

/

5 50cc syringes -

/

1 Noble gas pre-filter

/,, holder /

~\ 1 Tape measure, 6 ft.

) 10 Potassium Iodide, KI,

/

BTL, 14 Tabs /BTL

/

1 Full set, site maps /

1 Tweezers, pr. /

1 Surgeon's gloves, box /

4 Grease pencils

/

Kit Seal No.

Comments:

Performed by:

Signature Date PV216 000A (8.82) i CONTROLLED DOCUMENT t

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO. .

APPENDIX B

(.

V

} IMPLEMENTING PROCEDURE EPIP-38 Page 1 of 3 REVISION EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 11 of 35 EMERGENCY STORAGE AT UNIT ONE OSC BATTERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 6 Hand-held portable radios /

/

/

/

/

/

1 6-Pak radio charger /

6 Radio holsters /

6 Spare batteries /

1 Frisker w/ probe /

1 Portable Ion Chamber Survey Meter /

2 Portable air samplers /

[^'s

/

t

) 1 100' extension cord /

v 4 A/S heads /

1 Particulate A/S filters (box) /

15 AgX cartridges /

25 Charcoal A/S cartridges /

4 Respirators w/ filters /

4 Respirator filters (char.) /

4 SCEAs /

1 Aspirator bulbs /

2 Alcrming dosimeters /

/

15 Noble gas collection chamber (Marinelli beakers) /

1 Check source /

5 Flashlights /

20 'D' size batteries /

1 First aid kit- /

1 Smears (box with folders) /

10 Signs'with inserts /

100' Barrier rope /

2 Clipboards /

1 Paper, yellow, lined (pkg) /

10 Pens / pencils /

fi o

  • l

~ ~ ~ ~

CONTROLLED DOCUMENT

i. -

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

APPENDIX B

(~~')

'wj IMPLEMENTING PROCEDURE EPIP-38 Page 2 of 3 REVISION EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 12 of 35 EMERGENCY STORAGE AT UNIT ONE OSC (CONT'D)

BA'ITERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 1 Log book

/

10 RAM labels /

2 Tape, Duct /

50 Plastic bags (various sizes) /

1 Scissors /

2 9V transistor batteries /

2 Shampoo

/

5 Soap

/

1 Hair clippers

/

2 Shaving cream /

1 Disposable razors (pkg) /

10 Full sets of P.C.'s /

25 Individual accountability

( N, report forms

/

( ) 4 Washcloths U /

4 Towels /

1 Q-Tips (pkg) /

10 0-200 mR dosimeters /

10 0-1 R dosimeters /

10 0-100 R dosimeters /

50 Dosimetry issue forms /

1 Dosimeter charger /

2 'AA' batteries /

1 Noble gas pre-filter holder /

1 Set controlled copy of EPIPs /

5 50cc syringes /

3 One liter bottles /

1 Pair bolt cutters /

1 Regular pliers /

1 Diagonal plie.rs /

1 Hammer, 16 oz. ball peen /

1 Long nose pliers /

1 Common head screwdriver /

1 Phillips head screwdriver /

1 Knife w/ spare blades /

4 Soil / vegetation sample l

e 2 1

10 containers Set Site Maps Tape measure, 6 ft.

Potassium Iodide, KI, BTL,

/

/

/

14 Tabs /BTL /

~~~^**

CONTROLLED DOCUMENT

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO. . APPENDIX B f-~T IMPLEMENTING PROCEDURE EPIP-38 Page 3 of 3 REVISION EMERGENCY EQUIPMEh7 AND SUPPLIES INVENTORY 5 Page 13 of 35 EMERGENCY STORAGE AT UNIT ONE OSC (CONT'D)

BATTERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMEhT ,

10 Set, Body Maps /

1 Tweezers, pair /

1 Surgeon's gloves, box /

1 Folding shovel /

20 Extremity TLD rings /

4 Grease pencils /

1 Calculator /

1 Radio Antenna /

Kit Seal No.

Comments:

Performed by:

, Signature Date l

l l

u f

l

~~"^^~

CONTROLLED DOCUN 3ENT .

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE N O.

APPENDIX C

(~') IMPLEMENTING PROCEDURE iPIP-38 Page 1 of 3

(j REVISION EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY -

5 Page 14 of 35 EMERGENCY STORAGE AT SERVICE BUILDING BATTERY SERIAL CALIBRATION ' RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 2 Friskers w/ probe /

/

2 Portable Ion Chamber /

Survey Meter /

4 Portable air samplers /

/

/

/

2 100' extension cord /

10 A/S heads /

2 Particulate A/S filters (box) /

50 AgX cartridges /

25 Charcoal A/S cartridges

[ml 4 Respirators w/ filters /

/

\vl 4 Respirator filters (char.) /

6 SCBAs

/

2 Aspirator bulbs ,

/

3 Alarming dosimeters /

/

/

15 Noble gas collection chamber (Marinelli beakers) /

1 Check source /

15 Full sets of P.C.s /

300' Barrier Rope /

10 Signs with inserts /

2 Shampoo /

5 Soap /

1 Hair clippers '

/

2 Shaving cream /

1 Disposable ra.zors (pkg) /

4 Washcloths / .

4 Towels /

1 -Q-Tips (pkg) /

1 Smears (box with folders) /

2 Clipboards /

1 Paper, yellow; lined (pkg) /

( i 5 Pens / pencils /

1 Surgeon's gloves, box /

~ ~^*'

CONTROLLED DOCUN)ENT

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE N O.

, s APPENDIX C IMPLEMENTING PROCEDURE iPIP-38 (N '

) Page 2 of 3 v REVISION EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 15 of 35 EMERGENCY STORAGE AT SERVICE BUILDING (CONT'D)

SERIAL BATTERY CALIBRATION RECHARGE /

NUMBER 1 DATE/ INITIALS _DUE DATE_ REPLACEMENT 1 Log book-10 RAM labs 1s /

2 Tape, Duct /

50 Plastic bags (various __ /

sizes) /

1 Knife w/ spare blades 25 /

Individual accountability report forms

/

1 Scissors ~

/

6 SCBA spare bottles 2 /

9V transistor batteries /

1 Calculator

/

1 Dosimeter charger 4 'AA' batteries /

/

1 Set controlled copy of 1

[( j')

1 EPIPs Noble gas pre-filter holder

/

/

3 One liter bottles /

50 Dosimetry issue forms 15 /

0-200 mR dosimeters /

15 0-1 R dosimeters 15 /

0-100 R dosimeters /

2 Soil / vegetation sample containers

/

5 50cc syringes

/

1 Set Site Maps 4 Flashlights /

30 'D' cell batteries /

2 First aid kit /

/

1 Phillips head screwdriver /

1 Common head screwdriver /

1 Pair bolt cutters / i 1 Regular pliers' /

1 Long nose pliers *

/

1 Diagonal pliers /

1 Hammer, 16 oz. ball peen /

1 Tape measure, 6 ft. l

/

10 Potassium Iodide, KI, BTL, 14 Tabs /BTL /

10 Set, Body Maps '

I I I1 Folding shovel /

/

PV25000A 18t82)

CONTROLLED DOCUMENT J  % -

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN [7cemas PPEmIx c

[i IMPLEMENTING PROCEDURE EPIP-38 Page 3 of 3 EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 16 of 35 EMERGENCY STORAGE AT SERVICE BUILDING (CONT'D)

BATTERY SERIAL CALIBRATION RECHARGE / l NUMBER EATE/ INITIALS DUE DATE REPLACEMENT 20 Extremity TLD rings /

1 Tweezers, pair /

4 Grease pencils /

6 Hand-held radios /

1 1

/

/

/

/

/

6 Radio holsters /

6 Spare radio batteries /

1 Radio charger, 6-pak /

Kit Seal No.

Comments:

Performed by:

Signature Date n

(o

~ ~ ^ *

  • CONTROLLED DOCUNjENT

l CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE N O.

o IMPLEMENTING PROCEDURE iPIP-38 APPENDIX D Page 1 of 2 k

REVISION EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 17 of 35 EMERGENCY STORAGE AT TSC BATTERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 1 Frisker w/ probe /

1 Portable Ion Chamber Survey Meter /

1 Portable air sampler AC powered /

1 100' extension cord /

2 A/S Heads /

1 Particulate A/S filters (box) /

10 AgX cartridges /

25 Charcoal A/S cartridges / \

2 Respirators w/ filters -

/

2 Respirator filters (char.) /

2 SCBAs

/

/ ') 1 Aspirator bulbs

(/ 2 Alarming dosimeters

/

/

/

2 Noble gas collection chamber (Marinelli beakers) /

1 Check source /

10 Full sets of P.C.s /

2 Flashlights /

10 'D' size batteries /

1 First aid kit /

1 Smears (box with folders) /

5 Signs with inserts

/

50' Barrier rope /

2 Clipboards /

1 Paper, yellow, lined (pkg) /

5 Pens / pencils /

1 Log book

/

10 RAM labels /

2 Tape, Duct /

50 Plastic bags (various sizes) /

1 Scissors

_/

2 9V transistor batteries ,i 1 Set controlled copy of

/

PV216-000A (8/82)  :

CONTROLLED DOCUMENT .

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE N O.

APPENDIX D rw IMPLEMENTING PROCEDURE EPIP-38 Page 2 of 2 REVISION EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 18 of 35

. EMERGENCY STORAGE AT TSC (CONT'D)

BATTERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 25 Individual accountability '

report forms /

10 0-200 mR dosimeters /

10 0-1 R dosimeters /

10 0-100 R dosimeters /

1 Dosimeter charger /

2 'AA' batteries /

50 Dosimetry issue forms /

1 Knife, w/ spare blades /

3 One liter bottles /

2 Soil / vegetation sample containers /

5 50cc syringes /

1 Noble gas pre-filter

.Oi holder /

10 Potassium Iodide, KI, BTL, 14 Tabs /BTL /

1 Full Set, Site Maps /

1 Tweezers, pr. /

1 Surgeon's gloves, box /

4 Grease pencils /

Kit Seal No.

Comments:

$ Performed by:

~

Signature Date PV216-000A (8182)

CONTROLLED DOCUMENT

r CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

APPENDIX E IMPLEMENTING PROCEDURE

[m

(/ '

$ PIP-38 REVISION Page 1 of 2 EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 19 of 35 EMERGENCY STORAGE AT EOF BATI'ERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 1 Frisker w/ probe /

~

1 Portable Ion Chamber Survey Meter

/

1 Portable air sampler /

1 100' extension cord /

2 A/S Heads /

1 Particulate A/S filters (box) /

10 AgX cartridges /

25 Charcoal A/S cartridges /

2 Respirators w/ filters /

2 Respirator filters (char.) /

2 SCBAs

/

1 Aspirator bulbs p 2 Alarming dosimeters

/

/

\N/ ) /

l 2 Noble gas collection l chamber (Marinelli beakers) /

l 1 Check source /

I 10 Full sets of P.C.s /

2 Flashlights /

l 10 'D' size batteries

/

1 Camera

/

5 Film (rolls) /

1 1

First aid kit (basic) /

l Smears (box with folders) /

l 10 Signs with inserts

/

l 50' Barrier rope /

I 2 Clipboards /

1 Paper, yellow, lined j (pkg) /

l 5 Pens / pencils ~ /

l 1 Log book

/

l 10 RAM labels /

l 2 . Tape, Duct /

l 50 Plastic bags (various sizes) /

1 Scissors /

I 2 9V transistor batteries /

I I l

l PV216@0A (8/82)

CONTROLLED DOCUMENT

r .

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE N O.

APPENDIX E IMPLEMENTING PROCEDURE (n

N.j

\ .

EMERGENCY EQUIPMENT AND

$ PIP-38 REVISION Page 2 of 2 SUPPLIES INTEhTORY 5 Page 20 of 35 EMERGENCY STORAGE AT EOF (CONT'D)

BATI'ERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 1 Set controlled copy of '

EPIPs /

3 One liter bottles /

5 50cc syringes /

1 Noble gas pre-filter holder /

40 0-200 mR dosimeters /

10 0-1 R dosimeters /

10 0-100 R dosimeters /

1 Dosimeter charger /

2 'AA' batteries /

50 Dosimetry issue forms /

1 Knife, w/ spare blades /

10 Potassium Iodide, KI,

/ N BTL ,14 Tabs /BTL /

')

\, 1 Full Set, Site Maps /

1 Tweezers, pr. /

1 Surgeon's. gloves, box /

4 Grease pencils /

Kit Seal No.

Comments:

Performed by:

Signature , Date l l l

~~~

CONTROLLED DOCUN)ENT

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE N O.

APPEhTIX F IMPLEMENTING PROCEDURE iPIP-38 I I Page 1 of 3

\x ,/ EMERGENCY EQUIPMENT AND REVISION SUPPLIES INVENTORY Page 21 of 35 5

EMERGENCY VEHICLE SUPPLY INVENTORY (R.E.R.V)

BATTERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 1 Frisker w/ probe /

1 Portable Ion Chamber Survey Meter

/

4 Portable air samplers /

/

/

~ /

1 100' extension cord /

6 A/S Heads

/

5 Particulate A/S filters (box) /

75 AgX cartridges /

25 Charcoal A/S cartridges /

3 Respirators w/ filters

(]

\

3 1

Respirator filters (char)

Aspirator bulbs

/

/

'vJ /

3 Alarming dosimeters

/ .

/

/

10 Noble gas collection 2

chamber (Marinelli beakers) /

Check source /

10 Full sets of disposable P.C.s

/ if

/

10 Signs with inserts

/

2 Shampoo

/

5 Soap

/

1 Hair clippers /

2 Shaving creem

/

1 Disposable razors (pkg) /

4 Wash cloths /

4 Towels

/

1 Q-Tips (pkg) /

1 Smears (box with folders) /

300' Barrier rope /

2 Clipboards

/

1 Paper, yellow, lined (pkg)

/

5 Pens / pencils

/

1 Log book g l ) 20 RAM labels

/

/

2 Tape, Duct

/

PV216 000A (8/82)

CONTROLLED DOCUMENT i

~ ~ - _- : - --- - - v

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE N O.

APPENDIX F

,, IMPLEMENTING PROCEDURE EPIP-38 Page 2 of 3 i ')

'(.,/ REVISION EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 22 of 35 EMERGENCY VEHICLE SUPPLY INVENTORY (C0hT'D)

(R.E.R.V.)

BAT 1TRY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 50 Plastic bags (various '

sizes) /

1 Knife, w/ spare blades /

1 Scissors /

1 Shovel

/

2 Flashlights

/

10 'D' size batteries /

1 Portable air pump /

2 First aid kit /

1 Bolt cutters /

1 Common head screwdriver /

l 1 Phillips head screwdriver /

) 1 Diagonal pliers /

^

1 Regular pliers /

/ S 1 Long nose pliers

( ) 1 Hammer

/

/

4 Stanchions /

4 9V transistor batteries /

1 Calculator /

1 Set controlled copy of EPIPs

/

3 Five gallon bottle water

/

3 0-200 mR dosimeters /

3 0-1 R dosimeters /

3 0-100 R dosimeters /

1 Dosimetry Charger /

6 'AA' batteries /

l 50 Dosimetry issue forms /

5 One liter bottles /

l 5 50cc syringes /

l 5 Soil / vegetation sample containers /

1 Noble gas pre' filter holder *

/

1 Hi Lift Jack /

1 Spinner Lug Wrench /

1 Jumper cables, set /

1 Tow strap, 10 ft.

/ _

I I .

~

~~~^*"'

CONTROLLED DOCUMENT 9

. CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

IMPLEMENTING PROCEDURE APPENDIX F

$ PIP-38 Page 3 of 3 EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 23 of 35

. EMERGENCY VEHICLE SUPPLY INVENTORY (CONT'D)

(R.E.R.V.)

SERIAL BATTERY CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMEhT 3 Flares '

/

1 Spare fan belts, set 2 Fire Extinguishers /

1 Tape measure, 6 ft. /

10 /

Potassium Iodide, KI, BTL, 14 Tabs /BTL

/

1 Full set maps _

10 /

Set, body maps

/

1 Tweezers, pr.

/

1 Surgeon's gloves, box 4 Grease pencils /

/

1 S.A.M. II Counting Inst. /

lO.

Kit Seal No. '

Comments:

l I Performed by:

Signature Date

~ ~^*'

CO'NTROLLED DOCUMENT -

CONTROLLED DOCUMENT -

PVNGS EMERGENCY PLAN PROCEDURE NO.

j "N IMPLEMENTING PROCEDURE tPIP-38 APPENDIX G Page 1 o['1

('v'j -

EMERGEN::Y EQUIPMENT AND REVISION

\

SUPPLIES INVENTORY '

5 Page 24 of 35 MARYVALE SAMARITAN HOSPITAL EMERGENCY KIT SERIAL BNITERY

_ NUMBER.

CALIBRATION RECHARGE /

DATE/ INITIALS DUE DATE REPLACEMENT 1

Roll Herculite, Green -

54" x 100 Yards 3 Roll Herculite, Yellow - /

54" x 100 Yards ,

1 Roll Herculite, White - /

54" x 100 Yards 1 /

Portable GM Survey Meter 1 /

Portable Ion Chamber Survey Meter 1 /

Frisker w/ Probe '

and Spare Probe 10 '

0 - 1R Dosimeters 10 _

1 0 - 200 mR Dosimeters Dosimeter Charger i w/ Spare Batteries 10 TLD Badges /

10 TLD Rings /

(v'; 1 1 Lead Pig /

/

Decon Table Top 24 Rolls of Yellow Tape, _

/

Pressure Sensitive w/ Radiation Symbols 150' Yellow and Magenta _ /

Barrier Rope 6 Rope Stanchions /

1 Dosimetry Distribution /

and Exposure Forms 12 Barrier Signs w/ Inserts /

1 Low pressure shower head /

50 Step-off pads /

1 Disposable Booties, Case _ /

1 Sample Holder For /

Pancake Probe 30 /

Poly Bottles; Capacity, gals. _ /

Kit Seal No. .

Comments:

. Performed by:

memo 4<se Signature CONTROLLED DOCUMEf4T

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

APPENDIX H g\ IMPLEMENTING PROCEDURE $ PIP Page 1 of 1 (x.s ,) REVISION EMERGENCY EQUIPMENT AND SUPPLIES INVEhTORY 5 Page 25 of 35 GOOD SAMARITAN HOSPITAL EMERGENCY KIT

. BA'ITERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 1 Roll Herculite, Green -

54" x 100 Yards /

3 Roll Herculite, Yellow - ,

54" x 100 Yards /

1 Roll Herculite, White -

54" x 100 Yards /

1 Portable GM Survey Meter /

1 Portable Ion Chamber Survey Meter /

1 Frisker w/ Probe and Spare Probe /

10 0 - 1R Dosimeters /

10 0 - 200 mR Dosimeters /

1 Dosimeter C_e,rger w/ Spare Batteries /

10 TLD Badges

/

, 10 TLD Rings

() 1 1

Lead Pig Decon Table Top

/

/

/

24 Rolls of Yellow Tape, Pressure Sensitive w/ Radiation Symbols /

150' Yellow and Magenta Barrier Rope /

6 Rope Stanchions

/

1 Dosimetry Distribution and Exposure Forms

/

12 Barrier Signs w/ Inserts /

1 Low pressure shower head

/

50 Step-off pads /

1 Disposable Booties, Case /

1 Sample Holder For Pancake Probe /

30 Poly Bottles; Capacity, gals.

/

Kit Seal No.

Comments:

fx v) t Performed by:

P@6 000A (8/8h Si Sture NTROLLED DOCUMEt4T

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

IMPLEMENTING PROCEDURE APPENDIX I iPIP-38 Page 1 of 1 I

EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 26 of 35

{

PVNGS AMBULANCE EMERGENCY KIT SERIAL BATTERY CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 1 Nylon tote bag '

20 Pr, disposable booties /

4 Pr, disposable coveralls /

20 Pr, disposable surgeons /

gloves 2 /

1 5' x 8' Herculite fabric /

Set Body maps

/

('M

'w]

Kit Seal No.

Comments:

i Performed by:

G Signature Date PV216 000A 18i82)

CONTROLLED DOCUMENT .

e CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

IMPLEMENTING PROCEDURE APPENDIX J

'EPIP-38 Page 1 of 1 O )'

\

EMERGENCY EQUIPMENT AND REVISION

. SUPPLIES INVENTORY 5 Page 27 of 35 OFFSITE EMERGENCY ASSISTANCE KIT (Security Bldg.)

SERIAL BATTERY CALIBRATION RECHIRGE/

NUMBER DATE/ INITIALS _DUE DATE REPLACEMENT 1 Nylon tote bag 20 Pr., disposable booties /

4 Pr., disposable coveralls /

20 Pr., disposable gloves /

2 /

5' x 8' Herculite fabric 1 Set, body maps /

/

%/

i l

l Kit Seal No.

Comments: .

Performed by: *

% ,/ Signature Date l mie. coon asis 2 CONTROLLED DOCUMENT

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

APPENDIX K IMPLEMENTING PROCEDURE

(~h E' PIP-38 Page 1 of 2 EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 28 of 35 0FFSITE SURVEY TEAM EMERGENCY KIT A (SERVICE BUILDING)

BAITERY SERIAL CALIBRATION NUMBER RECHARGE /

DATE/ INITIALS DUE DATE REPLACEMENT 1 Frisker w/ probe /

1 Portable Ion Chamber Survey Meter /

1 DC powered air sampler /

2 A/S Heads /

1 Particulate A/S filters (box) /

50 AgX cartridges /

25 Charcoal A/S cartridges /

2 Respirators w/ filters /

2 Respirator filters (char) /

1 Aspirator bulb

/

2 Alarming dosimeters /

O 2 Noble gas collection /

chamber (Marinelli beakers) /

1 NG pre-filter holder

/

2 Full sets of disposable P.C.s /

1 Smears (box with folders) /

1 C11pboards

/

2 Pads paper, yellow, lined /

4 Pens / pencils

/

50 Plastic bags, various sizes /

1 First aid kit /

2 Liter plastic bottles

/

1 Tape, Duct /

1 Knife, w/ spare blades /

1 Tape measure, 6 ft. /

1 50cc syringe /

1 -Potassium Iod,ide, KI, BTL 14 tabs /BTL /

1 Full set, maps /

g 4 Extremity TLD rings 2

/

0-200 mR dosimeters /

2 0-1R dosimeters /

i Handheld trowel /

1 Tweezers, pr.

O 1 Surgeon's gloves, box

/

/

j Q 2 Grease pencils /

l PV216-00DA (8'82)

< CONTROLLED DOCUMENT g_ "

T _ - -- . #

l CONTROLLED DOCUMENT '

l i

PVNGS EMERGENCY PLAN PROCEDURE NO. APPENDIX K p IMPLEMENTING PROCEDURE EPIP-38 Page 2 of 2 EMERGENCY EQUIPMENT AND SUPPLIES IhTEhTORY 5 Page 29 of 35 OFFSITE SURVEY TEAM EMERGENCY KIT A (CON'T)

(SERVICE BUILDING)

BATTERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 1 Check source /

1 Calculator /

1 Radio antenna /

Kit Seal No.

Comments:

/

Performed by:

Signature Date l

l t

O-

~ ~^^"

l CONTROLLED DOCUMENT

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

APPENDIX L IMPLEMENTING PROCEDURE -

EPIP-38

[ '\ Page 1 of 2

("')

EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY REVISION 5 Page 30 of 35 0FFSITE SURVEY TEAM EMERGENCY KIT B (SERVICE BUILDING)

SERIAL BATTERY CALIBRATION RECHARGE /

. NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 1 Frisker w/ probe 1 /

Portable Ion Chamber Survey Heter

/

1 DC powered air sampler /

2 A/S Heads

/

1 Particulate A/S filters (box) /

50 AgX cartridges 25 /

Charcoal A/S cartridges 2 Respirators w/ filters /

2 /

Respirator filters (char) /

1 Aspirator bulbs 2 /

Alarming dosimeters

/

(m) 2 Noble gas collection chamber (Marinelli beakers) j 1 NG pre-filter holder /

2 /

Full sets of disposable P.C.s /

1 1

Smears (box with folders)

Clipboards /

2 /

Pads paper, yellow, lined 4 /

Pens / pencils 50 Plastic bags, various /

sizes 1 /

First aid kit 2 Liter plastic bottles /

1 Tape, Duct /

/

1 Knife, w/ spare blades 1 Tape measure, 6 ft. /

1 50cc syringe /

/

1 Potassium Iodi~de, KI, BTL 14 tabs /BTL 1 Full set, maps /

T 4 Extremity TLD rings /

2 0-200 mR dosimeters

/

2 /

0-1R dosimeters 1 /

Hand-held trowel 1 Tweezer, pr. /

/

1 Surgeon's gloves, box 2 Grease pencils _ /

/

PV266 00DA (8/82)

CONTROLLED DOCUME. NT

. _ _ _ _ _ _ lv

CONTROLLED DOCUMENT -

PVNGS EMERGENCY PLAN PROCEDURE NO-APPENDIX L IMPLEMENTING PROCEDURE iPIP-38 Page s'of 2 EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 31 of 35

. 0FFSITE SURVEY TEAM EMERGENCY KIT B (CON'T)

(SERVICE BUILDING)

BATTERY SERIAL CALIBRATION RECHARGE /

NUM3ER DATE/ INITIALS DUE DATE REPLACEMENT 1 Check source '

/

1 Calculator /

1 Radio antenna /

Kit Seal No.

Comments:

O Performed by:

Signature Date t

O PV216 000A 44/82)

CONTROLLED DOCUMENT

r CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

APPENDIX M IMPLEMENTING PROCEDURE EP.IP-38 Page 1 of 1 V EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 32 of 35 EMERGENCY ONSITE EVACUATION DECONTAMINATION KIT (ANNEX BLDG SECURITY DESK)

SERIAL BATTERY CALIBRATION RECHARGE /

__ NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 1 Frisker w/ probe 1 /

Portable Ion Chamber Survey Meter

~

/

1 Portable G.M.

Survey Meter 2 /

5' x 10' Herculite fabric /

100 Rad-barrier rope, ft /

1 Disposable gloves, box 20 Pr, disposable booties /

/

10 Pr, disposable coveralls /

10 Disposable caps 5 Cotton t.;wels /

/

10 Soap, bar 1 Tape, Duct /

/

1 Box, moist towelettes

(~N 10 Bags, large /

t.,

k'

) 4 Signs w/ inserts /

/

1 Shampoo

/

1 Razor, pk _

1 Shave cream /

1 Q-tips, pack /

1 /

Hand brush 10 /

Potassium Iodide, KI, .b BTL 14 tabs /BTL /

1 Set, body maps

/

! 1 50cc syringe t /

l Kit Seal No.

Comments:

Performed by:

Signature Date PY216 000A (8e82)

CONTROLLED DOCUMENT '

CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE NO.

APPENDIX N IMPLEMENTING PROCEDURE EPIP-38 Page 1 of 2 l i (j' EMERGENCY EQUIPMENT AND REVISION SUPPLIES INVENTORY 5 Page 33 of 35 0FFSITE DECONTAMINATION KIT

. (SERVICE BLDG.)

BATTERY SERIAL CALIBRATION NUMBER RECHARGE /

DATE/ INITIALS DUE DATE REPLACEMENT 1 Herculite, roll

/

2 5 gal bottles, water /

1 Rad rope, roll 4 /

Rope stanchions

/

2 Absorbent toweling, rolls /

6 Surgeons gloves, box /

5 Full sets P.C.'s /

5 Sets plastic coveralls /

50 Plastic disposable booties, pair /

20 Disposable coveralls, pair

/

20 Disposable caps /

12 Cotton towels /

2 Cotton glove liners, tO dozen

( ,) 2 Soap, package

/

/

1 Btl, potassium permanganate

/

2 Tape, rolls

/

2 Moist towelettes, box /

4 Signs w/ inserts

/

10 Bags, plastic, large /

2 Shampoo, bt1

/

12 Razors, disposable /

2 Q-tips, pk /

1 Hair clippers /

4 Shaving cream

/

4 Buckets / basins /

2 4" x 4" gauze, box /

J 4 Brushes, hand

! /

2 Corn meal / Tide, box /

3 Rad tape, roll /

4 Normal saline, liter bt1 /

1 First aid kit

/

2 Portable G.M. /

Survey Meters /

1 Box smears w/ folders /

10 Potassium Iodide, KI, g BTL 14 tabs /BTL /

('~'N 1 Set, body maps

( j 2 Friskers w/ probes /

/

/

PV216 000A (8/82)

CONTROLLED DOCUMENT J

7 CONTROLLED DOCUMENT PVNGS EMERGENCY PLAN PROCEDURE N O.

APPENDIX N IMPLEMENTING PROCEDURE iPIP-38 Page 2 of 2 Ns EMERGENCY EQUIPMENT AND SUPPLIES INVENTORY 5 Page 34 of 35

  • 0FFSITE DEC0hTAMINATION KIT (SERVICE BLDG.)

BATTERY SERIAL CALIBRATION RECHARGE /

NUMBER DATE/ INITIALS DUE DATE REPLACEMENT 2 50cc syringe /

1 Titanium oxide powder, bt1 /

1 ETDA, bt1 /

1 Citric acid powder, bt1 /

1 Sodium bisulfate, bt1 /

1 Carboxymethyl cellulose ether, bt1 /

2 Vaseline hand lotion, bt1 /

2 Clorox bleach, qt. /

1 Waterless hand cleaner, can /

O Kit Seal No.

Comments:

Performed by:

Signature Date O

~ " " " "

CONTROLLED DOCUMENT .

[ CONTROLLED DOCUMENT l PVNGS EMERGENCY PLAN PROCEDURE NO.

IMPLEMENTING PROCEDURE E, PIP-38.

APPENDIX 0

/ Page 1 of 1 (N)

NJ.

EMERGENCY EQUIPMEhT AND REVISION

  • h SUPPLIES INVEhTORY 5 Page 35 of 35 EMERGENCY EQUIPMEhT AND SUPPLIES INVENTORY SCH EMERCENCY EQUIPMENT AND SUPPLIES INVENTORY SCHEDULE EMERGENCY 4AN. FEB MAK APR MAY JUN JUL AUG SEP. OCT. NOV DEC. TOT JNIT ONE CR/STSC X X X X UNIT ONE OSC X X X X SERVICE BUILDING X X X X TECHNICAL SUPPORT CENTER X X X X EMEROENCY OPS. FACILITY X X X

."Ni8!;W #f;Mt " " X X

x X MARYVALE HOSPITAL x

X X X X C000 SAMARITAN HOSPITAL X f X X X EMERGENCY AMBUI.ANCE 1 X {

9 X X 0FFSITE A5SISTANCE X f

X X X OFFSITE SURVEY TEAM 'A' X X X

OFFSITE SURVEY TEAM 'B' X X X

X X EVACUATION DECON. X g X X X 0FFSITE DECON. X X X f

X l

l s

1 i

I l

Pvit6 000A 48.82

[

nummm===

CONTROLLED DOCUN@NT  ;