ML20205A088
| ML20205A088 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 10/18/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Deddens J GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20205A092 | List: |
| References | |
| NUDOCS 8810250385 | |
| Download: ML20205A088 (2) | |
See also: IR 05000458/1988019
Text
F
.-
,
,
,
.
OCT I 81988
In Reply Refer To:
Docket: 50-458/88-19
Gulf States Utilities
ATTN: Mr. James C. Deddens
Senior Vice President (RBNG)
Nuclear Licensing
P.O. Box 220
St. Francisville, Louisiana 70775
Gentleren:
This refers to the inspection conducted by Messrs. E. J. Ford and W. B. Jones
of this office during the period August 1 thr6Jgh September 17, 1988, of
activities authorized by NRC Operating License NPF-47 for River Bend Station,
and to the discussion of our findings with you and other members of your staff
at the conclusion of the inspection.
Areas examined during the inspectic' included surveillance observation,
maintenance observation, safety system walkdown, operational safety
verification, radiological protection observation and security. Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspectors.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rul o of 'ractice," Part 2, fitle 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The responses directed by this letter and the accompanying Notices are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
/
V-
C
C.
D:D
in table
LJC
n
p/#4/88
ones
For
lk
/I 88
IO/ ! 88
g / g/88
8810250385 891018
ADOCK 05000458
O
(.
.
.
.
..
,
,.
Gulf States Utilities
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
'
Sincerely,
IDrlglnal Signed By
/L B. Beacli
L. J. Callan, Director
-
Division of Reactor Projects
Enclotures:
1.
Appendix A - Notie of Vic'ation
.
2.
Appendix B - NRC-
pection Report
50-458/88-19
cc s/enclosuras:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
River Bend Oversight
1
P.O. Box 2951
Beaumont, Texas 77704
'
Gulf States Utilities
ATTN: Les England, Director
Nuclear Licensing - RBNG
,
P.O. Box 220
.
St. Francisville, Louisiana 70775
Louisiana State University,
Government Documents Department
4
Louisiana Radiation Control Program Director
bectoDMB(IE01)
i
bec distrib. by RIV:
'
- DRP
- Resident Inspector
<
R. D. Martin, RA
- SectionChief(DRP/C)
- Lisa Shea, RM/ALF
- MIS System
)
RPSB-DRSS
- RSTS Operator
- Project Engineer, DRP/C
- RIV File
- W. Paulson, NRR Project Manager
- DRS
s
A. B. Beach
- w/766
!
. - -
-
-
-
-
-
-