Forwards 6-month Exemption from Date of Issuance of Submitting Updated Facility Description & Safety Analysis. Addl Exemptions Will Be Granted Only Upon Review & Approval of Program Plan Containing Schedules or Milestones
ML20204K024
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 04/11/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20204K030 List:
References
LSO5-85-04-015, LSO5-85-4-15, NUDOCS 8504250294
Download: ML20204K024 (4)


Text

April 11, 1985 Docket No. 50-213 LS05-85-04-015 Mr. W. G. Counsil, Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141

Dear Mr. Counsil:

SUBJECT:

EXEMPTION FROM SUBMITTAL DATE FOR UPDATED FACILITY DESCRIPTION AND SAFETY ANALYSIS-(FDSA)

Re:

Haddam Neck Plant The Commission has issued the enclosed Exemption from certain requirements of Section 50.71(e) of 10 CFR Part 50 in response to your letter of February 4, 1985. This Exemption permits a 6 month exenption from the date of issuance from submitting the updated FDSA for Haddam Neck Plant. Any additional exemptions from compliance with 10 CFR 50.71 will be granted by the Director of Licensing, ONRR only upon the review and approval of a program plan containing schedules or milestones for the submittal of an updated FDSA for the Haddam Neck Plant.

I expect a serious commitment be made by your company to ensure that this issue is resolved and would anticipate results in the near term which reflect our concern regarding the lack of an adequate FDSA.

An Environmental Assessment and Finding of No Significant Impact for this action was published in the Federal Register on April 4, 1985 (50 FR 13433).

This Exemption is being forwarded to the Office of the Federal Register for publication.

Sincerely,

\\

e(,0

(

D enoms emme er Joim A. Zwolinski, Chief gf" Operating Reactors Branch #5 Division of Licensing

Enclosure:

DISTRIBUTION Exemption Docket File HThompson OELD CGrimes NRC PDR ORAR EJordan TBarnhart(4) cc w/ enclosure:

Local PDR CJamerson BGrimes ACRS(10)

See next page ORB #5 Reading FAkstulewicz CMiles, OPA SECY DL:DIPl RDiggs

  • SEE PREVIOUS PAGE FOR CONCURRENCE

.gThomsb/n 7, / (( /85 DL:0RBf5*

DL:0RB#5*

OELD*

DL:0RR#5*

DL:SEPB*

DL:AD/SA

  • CJamerson:Jb FAkstulewicz JZwolinski CGrimes DCrutchfield 03/20/85 03/20/85 03/25/85 03/25/85 03/25/85 03/28/85 8504250294 850411 PDR ADOCK 05000213 fP fM M

Docket No. 50-213 LS05 Mr. W. G. Counsil, Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141

Dear Mr. Counsil:

SUBJECT:

EXEMPTION FROM SUBMITTAL DATE FOR UPDATED FAC.ILITY DESCRIPTION AND SAFETY ANALYSIS (FDSA)

Re:

Haddan Neck Plant The Commission has issued the enclosed Exemptio'n from certain requirements of Section 50.71(e) of 10 CFR Part 50 in response to your letter of February 4, 1985. This Exemption permits an exemptionfrom the date of compliance for submitting the updated FDSA for Haddam Nepk Plant to allow the FDSA update to reflect more accurately the design of the unit.

An Environmental Assessment and Findip/

g of No Significant Impact for this action was published in the Federal Register on March

, 1985 (50 FP,

-).

/

This Exemption is being forwarded to the Office of the Federal Register for publication.

Sincerely, John Zwolinski, Chief Operating Reactors Branch #5 Division of Licensing

Enclosure:

Exemption cc w/ enclosure:

See next page DISTRIBUTION Docket File HThompson OELD CGrimes RDiggs NRC PLR ORAB EJordan TBarnhart (4)

Local PDR CJamerson BGrimes.

ACRS (10)

ORB #5 Rea ing FAkstulewicz CMiles', OPA SECY h0L:DIR

  • SEE PREVIOUS PAGE FOR CONCURRENCE HThomgn DL:0RR#5*

DL:0RB#5*

OELD*

DL:0RR#5*

DL:SEPB*

DL CJamerson:jb FAkstulewicz JZwolinski r9imes ctg DC fie 03/20/85 03/20/85 03/25/85 03/25/85 03/25/85 g/q85

f Docket No. 50-213

-LS05 Mr. W. G. Counsil, Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141

Dear Mr. Counsil:

SUBJECT:

EXEMPTION FROM SUBMITTAL DATE FOR UPDATED FACILITY DESCRIPTION AND SAFETY ANALYSIS (FDSA)

Re:

Haddam Neck Plant The Commission has issued the enclosed Exemption from certain r uirements of Section 50.71(e) of 10 CFR Part 50 in response to your letter f February 4, 1985. This Exemption permits an exemption from the date of mpliance for submitting the updated FDSA for Haddam Neck Plant to allow e FDSA update to reflect more accurately the design of the unit.

An Environmental Assessment and Finding of No Significa Impact for this action was published in the Federal Register on March

, 1985 (50 FR

).

This Exemption is being forwarded to the Office of tb Federal Register for publication.

Sincerely, l

John Zwol nski, Chief Operatin Reactors Branch #5 l

Divisi of Licensing Enclo:ure:

Exemption

/

cc w/ enclosure:

[

See next page DISTRIBUTION Docket File HThompso OELD CGrimes RDiggs NRC PDR ORAB EJordan TBarnhart(4) local PDR CJam son BGrimes ACRS (10)

ORB #5 Reading FAkstulewicz CMiles, OPA SECY

/

DL:DIR HThoms'pon

/ /85

}

DL:0RB#(jb 'DL:0RB#5 d

OEL DL b#5 DL:SEP DL:AD/SA CJamerson FAkstulew cz O b,

fZwolinski CGrimes DCrutchfield l

-J/JO/85-S/40/85

/J/2f/85 j3/;3/85 bb6/85

/ /85 L:

Mr. H. G. Counsil

-2 April 11, 1985 CC Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant RDF #1 Post Office Box 127E East Hampton, Connecticut 06424 John F. Opeka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141 _..

+

Board of Selectmen E-Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut- 06106 U.S. Environmental Protection Agency

~

~

, Region I Office ATTN: Regional Radiation Representative JFK F.ederal Building Boston, Massa ~chusetts '02203 Resident Inspector

~

Haddam Neck Nuclear Power Station c/o ll.S. NRC

~

East Haddam Post Office East Haddam, Connecticut 06423 Dr. Thomas E. Murley, Regional Administrator Nuclear Regulatory Commission, Region I 631 Park Avenue King of Prussia, Pennsylvania 19406