Forwards 6-month Exemption from Date of Issuance for Submittal of Updated Fsar,Per 10CFR50.71(e).Addl Exemptions Will Be Granted Only Upon Review & Approval of Program Plan Continuing Schedules or Milestones
ML20204J795
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/11/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20204J801 List:
References
LSO5-85-04-016, LSO5-85-4-16, NUDOCS 8504250144
Download: ML20204J795 (4)


Text

-

April 11, 1985 Docket No. 50-245 LS05-85-04-016 Mr. W. G. Counsil, Vice President Nuclear Fngineering and Operations Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141

Dear Mr. Counsil:

SUBJECT:

EXEMPTION FROM SURMITTAL DATE FOR UPDATED FINAL SAFETY ANALYSIS REPORT (FSAR)

Re:

Millstone Nuclear Power Station, Unit No.1 The Commission has issued the enclosed Exemption from certain requirements of Section 50.71(e) of 10 CFR 50 in response to your letter of February 4, 1985. This Exemption permits a 6 month exemption from the date of issuance from submitting the updated FSAR for Millstone Unit 1.

Any additional exemptions from compliance with 10 CFR 50.71 will be granted by the Director of Licensing, ONRR only upon the review and approval of a program plan containing schedules or milestones for the submittal of an updated FSAR for Millstone Unit 1.

I expect that a serious commitment be made by your company to ensure that this issue is resolved and would anticipate results in the near term which reflect our concern regarding the lack of an adequate FSAR.

An Environmental Assessment and Finding of No Significant Impact for this action was published in the Federal Register on April 4, 1985 (50 FR 13434).

This Exemption is being forwarded to the Office of the Federal Register for publication.

Sincerely,

\\

.mm asw er 8504250144 h o245 John A. Zwolinski, Chief p

PDR ADOCK PDR Operating Reactors Branch #5 0

P Division of Licensing g

v DISTRIBUTION

Enclosure:

Docket File HThompson OELD CGrimes Exemption NRC PDR ORAB EJordan TBarnhart(4) local PDR CJamerson BGrimes ACRS (10) cc w/ enclosure:

ORB #5 Reading FAkstulewicz CMiles, OPA SECY See next page RDiggs DL:AD/SA*

DL:DIR g DCrutchfield H1homspah

  • SEE PREVIOUS PAGE FOR CONCURRENCE 03/28/85 4-/g /85 DL:0RB#5*

DL:0RB#5*

DL:0RB#5*

OELD*

DL:0RS#5*

DL:SEPB*

CJamerson:jb FAkstulewicz JShea JZwolinski CGrimes 03/19/85 03/19/85 03/20/85 03/21/85 03/25/85 03/25/85

B Docket No. 50-246 LS05 Mr. W. G. Counsil, Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141

Dear Mr. Counsil:

SUBJECT:

EXEMPTION FROM SUBMITTAL DATE FOR UPDATED FINAL SAFETY ANALYSIS REPORT (FSAR)

Re:

Millstone Nuclear Power Station, Unit No.1 The Commission has issued the enclosed Exemption from certain requirements of Section 50.71(e) of 10 CFR 50 in response to your letterjof February 4, 1985. This Exemption pemits an exemption from the date f compliance for submitting the updated FSAR for Millstone Unit 1, to all the FSAR update to reflect more accurately the design of the unit.

An Environmental Assessment and Finding of No Signif cant Impact.for this action was published in the Federal Register on Ma. h

, 1985 (50 FR

).

This Exemption is being forwarded to the Office f the Federal Register for publication.

Sincerely [

John wolinski, Chief Ope 'ating Reactors Branch #5 Di ision of Licensing.

Enclosure:

Exemption cc w/ enclosure:

See next page

. DISTRIBUTION l

Docket File HThomp n OELD CGrimes RDiggs NRC PDR ORAB EJordan TBarnhart(4)

Local PDR CJam son BGrimes ACRS (10)

ORB #5 Reading FA tulewicz CMiles, OPA SECY

[

DL:DI hfield pson

  • SEE PREVIOUS PAGE FOR CONCURRENCE HThop/85

//

/85 DL:0RB#5*

DL:0RB#5*

DL:0RB#5*

OELD*

DL:0RB#5*

DL:SEPB*

CJamerson:jb FAkstulewicz JShea JZwolinski CGrimes 03 25/85

/

03 25/85

/

03/19/85 03/19/85

, 03/20/85

'03/21/85

y Docket No. 50-245 LS05,

l

-Mr. W. G. Counsil, Vice President

/

Nuclear Engineering and Operations

/

Northeast Nuclear Energy Company

/

Post Office Box 270 Hartford, Connecticut- 06141

Dear Mr. Counsil:

SUBJECT:

EXEMPTION FROM SUBMITTAL DATE FOR UPDATED FINAL SAFETY ANALYSIS REPORT (FSAR)

Re:

Millstone Nuclear Power Station, Unit No.1 The Commission has issued the enclosed Exemption fro certain requirements of Section 50.71.(e) of 10 CFR 50 in response to you letter of February 4, 1985. This Exemption permits an exemption from th ate of compliance for submitting the updated FSAR for Millstone Unit 1, allow the FSAR update to reflect more accurately the design of the uni.

An Environmental Assessment and Finding of No S gnificant Impact for this action was published in the Federal Register on March

,1985(50FR

).

This Exemption is being forwarded to the Of a/

ce of the Federal Register for publication.

Since ely, John Zwolinski, Chief

/ perating Reactors Branch #5 O

l Division of Licensing l

Enclosure:

Exemption cc:

/

.See next page f

i DISTRIBUTION

/

l Docket File

.HThompson -

0 ELD CGrimes RDiggs NRC PDR

,' ORAB EJordan TBarnhart(4) local PDR t CJamerson BGrimes ACRS (10)

ORB #5 Reading

/

FAkstulewicz CMiles, OPA SECY

!DL:DIR DL:AD/SA DCrutchfield [HThomspon

/- /85,

/ /85 DL:SEPB h DL:0RBf5 DL:0RB#5 M DL:0 9#5 L.

DL RB#5 linski CGrimes

\\t0Zwo//85'4y436/85 CJamerson, b-FAkstulewTcz JShea S g /85 J/f//85 %)/

3/A/85i

$/A/85.

/

Mr. W. G. Counsil April 11, 1985 CC Gerald Garfield, Esouire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environnental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 John F. Opeka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, -Connecticut 06141 State of Connecticut

_.0ffice of Policy and Management

~ ~ ~

ATTH: Under Secretary Energy -

Division 80 Wachington Street

~ __

Hartford, Connecticut 06106 ~

U.S. Environmental Protection Agency Region I Office ATTN: Pegional Radiation Pepresentiative JFK Federal Building Boston, Massachusetts 02203 Dr. Thomas E. Purley, Regional Administrator Nuclear Regulatory Commission, Region I 631 Park Avenue 19406 V,ing of Prussia, Pennsylvania

~

NortheastNdclearEnergyConpany ATTN: Superintendent Millstone Plant P. 0. Box 128-Waterford, Connecticut 06358

~

~~

Resident Inspector c/o U.S. NRC Millstone Plant P. O. Box 811 Niantic, Cornecticut 06357 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385