Forwards Insp Repts 50-348/86-13 & 50-364/86-13 on 860611- 0710 & Notice of Violation
ML20204J628
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/25/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20204J631 List:
References
NUDOCS 8608110153
Download: ML20204J628 (2)


See also: IR 05000348/1986013

Text

.

,

h

.

~

a d,

i

g 2 5 BBS

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

AlabamaPowerpmpany

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC. INSPECTION REPORT NOS. 50-348/86-13 AND 50-364/86-13)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. H. Bradford on June 11 - July 10,1986. The inspection included a review of

activities authorized for your Farley Nuclear facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff identi-

fied in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities appeared to violate NRC

requirements. The violation, references to pertinent requirements, and elements

to be included in your response are described in the enclosed Notice of Viola-

tion.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

l Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

f M 1.D O

e608110193

PDR 860725ADOCK

PDR 05000348

0 Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls: (See page 2)

If } a-

m\

&

'

.

4

Alabama Power Company 2

g25 W

cc w/encis:

C 0. Whitt, Executive Vice President

kl. Woodard, General Manager - -

Nuclear Plant

D G. Hairston, III, General Manager -

Nuclear Support

& W. McGowan, Manager-Safety Audit

and Engineering Review

k1C Osterholtz, Supervisor-Safety

Audit and Engineering Review

bec w/encls:

Resident Inspector

. Reeves, Project Manager, NRR

'Decument Control Desk

) (State of Alabama

1

!

,

I

l

l

RI RII RII RII

Modenos:cdg

bl\

HDalce DVerelli

h-

LReyes

07/,j/86

2

07/f/86 07/g/86 07/f/86

_. ,

. . _ _ . _ _ - , . _ . _ . . = _ ,_. . _ - _- -