OPERATING DATA REPORT f
DOCKETNO. _50-369 REVISED COPY #2 DATE _02-15-8T COMPLETED BY la naavis TELEPHCVE 7nd-173-7567 OPER 4 TING STATUS
- 1. Unit Name:
Mecuirr 1 Notes
- Nameplate Rating
- 2. Reporting Period: January 1. 1985-January 31, 1985 (Gross MWe) calculated as
- 3. Licensed Thermal Power (MWt):
3411 1450.000 MVA x.90 power
- 4. Nameplate Rating (Gross MWe):
1305 factor per Page lii,
- 5. Design Electrical Rating (Net MWe):
1180 NUREG-0020.
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1190 E. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7)Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted. If Any (Net MWe).
None
- 10. Reasons For Restrictions.If Any:
This Month Yr. to Date Cumulative II. Hours In Reporting Period 744.0 744.0 27 792.0-
- 12. Number Of Hours Reactor Was Critical 707.2 707.2 18 870.8 i
- 13. Reactor Reserve Shutdewn Hours
- 14. Hours Generator On Line 703.2 703.2 18 665.7
'15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 2 356 943 2 356 943 49 161 243 _
- 17. Gross Electrical Energy Generated (MWH) n>n Ant n9n sol 17 049 828
- 18. Net Electrical Energy Generated (MWH)
'90 780 790 780 16 166 035
- 19. Unit Service Factor 94.5 94.5 67.2
- 20. Unit Availability Factor 94.5 94.5 67.2
- 21. Unit Capacity Factor (Using MDC Ne4 90.1 90.1 49.3
- 22. Unit Capacity Factor (Using DER Net) 90.1 90.1 49.3 t
t
- 23. Unit Forced Outage Rate 5.5 5.5 15.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:
- 25. If Shut Down At End Of Report Period. Est! mated Date of Startup:
- 26. Units in Test Status iPrior to Commercial Operationi:
i Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
\\
i
$h7h
^
i8504250042 850415 PDR ADOCK 05000369 R
l OPERATING DATA REPORT l
DOCKET NO.
50-370 REVISED COPY #2 DATE 02-15-85 i
CO31PLETED BY J. A. Reavis TELEPHONE 7na_,71-7567 OPERATING STATUS
- 1. Unit Name:
McGuire 2 Notes
- Nameplate Rating
- 2. Reporting Period:
3=nnary 1. 1985-January 31. 1985 (Gross MWe) calculated as
- 3. Licensed Thermal Power (31Wt):
3411 1450.000 MVA x.90 power
- 4. Nameplate Rating (Gross SIWE):
1305*
ct e Page lii,
- 5. Design Electrical Ratir.g (Net SIWE):
1180
- 6. Maximum Dependable Cahcity (Gross.%IWe):
- 7. Maximum Dependable Capacity (Net SIWE):
1180
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None i
- 9. Power Level To Which Restricted. If Any (Net 31We):
None
- 10. Reasons For Restrictions. If Any:
This.\\lonth Yr to Date Cumulative II. Hours In Reporting Period
_ 744.0 744.0 8 088.0 12.' Number Of Hours Reactor Was Critical 595.0 595.0 6 733.1
- 13. Reactor Resette Shutdown Hours
- 14. Hours Generator On Line scA o 594.9 6 686.0
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (SIWH) 1 948 246 1 948 246 21 318 917
- 17. Gross' Electrical Energy Generated (31WH) 699 053 699 053 7 536 776
- 18. Net Electrical Energy Generated (.\\lWH) 671 521 671 521 7 229 321 l
- 19. Unit Service Factor 80.0 80.0 82.7
- 20. Unit Availability Factor 80.0 An 0 82.7
- 21. Unit Capacity Factor (Using SIDC Net) 76.5 76.5 75.8
- 22. Unit Capacity Factor (Using DER Net) 76.5 76.5 75.8 l
- 23. Unit Forced Outage Rate 0.0 0.0 14.9
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type. Date,and Duration of Each):
l l
- 25. If Shut Down At Fnd Of Report Perind. Estimated Date of Startup:
- 26. Units in Test Status Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY Coil.\\lERCIAL OPERATION i
I (0/77)
~..
- -...