Text
.
1.s OPERATING DATA REPORT REVISED COPY #1 DOCKET NO.
50-369 DATE 03-15-85 COMPLETED BY
.T A _ Reavis TELEPHONE vnA_271-7567 OPERATING STATUS
- 1. Unit Name:
McGuire 1 Notes
- 2. Reporting Period: Fahrunrv 1_ 14R bFahrunrv 28. 1985
' 3. Licensed Thermal Power (MWt):
3411
~
- 4. Nameplate Rating (Gross MWe):
1305*
S. Design Electrical Rating (Net MWe): 1180
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1190
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
t
. This Month Yr to Date Cumulative
!!. Hours in Reporting Period 672.0 1 416.0 28 464.0
- 12. Number Of Hours Reactor Was Critical 630.9 1 338.0 19 501.6
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line 628.9 1 332.1 19 294.6
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 2 088 791 4 445 734 51 250 034
- 17. Gross Electrical Energy Generated (MWH) 724 415 1 545 018 17 774 243 18.' Net Electrical Energy Generated (MWH) 698 584 1 489 364 16 864 619
- 19. Unit Service Factor 41 A 94.1 67.8
- 20. Unit Availability Factor 93.6 94.1 67.8
- 21. Unit Capacity Factor (Using MDC Net)
R8.1 89.1 50.2
- 22. Unit Capacity Factor (Using DER Net) 88.1 89.1 50.2
- 23. Unit Forced Outage Rate 6.4 5.9 15.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
' 26.- Units In Test Status IPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I
(9/77) 8504250031 850415 PDR ADOCK 05000369 R
PDR o
-%.~v
-w--
.-m,.-.--..---,
y w---,%w-,,,-y,mm-,,
www-,--ey-w---e,-
--.--,..r,---
,m m _ m % # s. www w y_-v-..em
OPERATING DATA REPORT REVISED COPY #1 DOCKET NO.
50-370 DATE 03-15-85 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS
- 1. Unit Name:
'Mecuire 2 Notes
- 2. Reporting Period: February 1 1985-Fahrunrv 28. 1985
- 3. Licensed Thermal Power (MWt):. J 411
- 4. Nameplate Rating (Gross MWe):
1305*
- 5. Design Electrical Rating (Net MWe).
1180
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1180 E
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr to-Date Cumulative II. Hours In Reporting Period 672.0 1 416.0 8 760.0
- 12. Number Of Hours Reactor Was Critical 0.0 595.0 6 731.1
- 13. Reactor Reserve Shutdown Hours 14.' Hours Generator On-Line 0.0 595.0 6 686.0
- s
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1 948 246 21 318 917
- 17. Gross Electrical Energy Generated (MWH) 124 699 177 7 536 900
- 18. Net Electrical Energy Generated (MWH)
-3 811 667 710 7 225 510
- 19. Unit' Service Factor 0.0 42.0 76.3 20.. Unit Availability Factor 0.0 42.0 76.3 i
! 21. Unit Capacity Factor (Using MDC Net).
0.0 40.0 69.9 i
- 22. Unit Capacity Factor (Using DER Net) 0.0 40.0 69.9 j~
- 23. Unit Forced Outage Rate 0.0 0.0 14.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY i
INITIAL ELECTRICITY
(
COMMERCIAL OPERATION i