ML20204J407
| ML20204J407 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/25/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wilgus W FLORIDA POWER CORP. |
| References | |
| NUDOCS 8608110080 | |
| Download: ML20204J407 (1) | |
Text
,
- di 1sP July 25, 1986 Florida (PowerCorporation ATTN:
- r. W. S. Wilgus Vice President Nuclear Operations P. O. Box 14042, M.A.C. H-2 St. Petersburg, FL 33733 Gentlemen:
SUBJECT:
CRYSTAL RIVER QUALITY ASSURANCE (QA) PROGRAM The refers to your letter dated May 30,1986, (3F0586-26) which provided a j
proposed change to the Crystal River. Unit 3 Docket 50-302 Quality Program Description (FSAR Section 1.7).
Your submittal, as presented, does not contain sufficient information for reasonable review.
Unless additional information is provided, your request is denied.
We appre::iate your timely submittal of information required by 10 CFR 50.54(a).
Please contact G. A. Belisle at 404-331-5596 if you have questions regarding our review of your submittal.
Sincerely, (original signed by)
Roger D. Walker, Director Division of Reactor Projects l
c w/ encl l
F. McKee, Director, Nuclear Plant Operations
!.. C. Videll, Manager Nuclear Operations Licensing and Fuel Management bcc w/ encl:
Resident Inspector ument Control Desk ate of Florida l
,n/
W{[f6 RII RII RI RII RII w
r-Ag1.dn DVer elli MRunyan:ma GBelisle C u ian 2p 7/If/86 7/>J/86 7/f/86 7/zf86 7/7 86 8608110080 860725 PDR ADOCK 0500 2
P ok i
34tLJ