ML20204J340

From kanterella
Jump to navigation Jump to search
Forwards Order Imposing Civil Penalty in Amount of $75,000. Corrective Actions Will Be Reviewed During Subsequent Insp. Util Did Not Provide Sufficient Basis for Withdrawal of Violation a
ML20204J340
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/20/1988
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20204J345 List:
References
NUDOCS 8810250099
Download: ML20204J340 (2)


Text

.... _... _ _

4

[' >R Riog#'o, UNITEO STATES E"

NUCLEAR REGULATORY COMMISSION

(

g WASHINGTON, D. C. 20555 g?

,p

%'....f OCT 2 01998 Illinois Power Company ATTN: Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, Illinois 62525 Gentlemen:

SUBJECT:

ORDER INP0 SING CIVIL MONETARY PENALTY This refers to your !atter dated June 29, 1988, in response to the Notice of Violation and Proposed Imposition of Civil Penalty sent to you by our letter dated June 1, 1988. Our letter and Notice describe three violations identified by the NRC.

To emphasize the importance of adequate engineering control of installation instructions to ensure qualification of electrical equipment important to safety, a civil penalty of Seventy-Five Thousand Dollars ($75,000) was prop'ased.

In your response, you admitted Violation 8 occurred as stated in the' Notice of Violation, but denied Violations A and C.

In addition, you requested remission of the proposed civil penalty.

Af ter consideration of your response, we have concluded, fnr the reasons given in the Appendix attached to the encloted Order Imposing Civil Monetary Penalty, that you did not provide sufficient basis for withdrawal of Violation A or for remission of the proposed civil penaltv. However, the NRC staff reconsidered its position on Violation C.

Although ycu did not conform with the EQ recuirements, the NRC staff has determined that Violation C is most appropriately classified at Severity Level IV.

Further, because there has been extensive discussion on this violation and corrected actions have been taken for it, a revised Notice will not be issued. Accordingly, we hereby serve the enclosed Order on Illinc.s Power Company imposing a civil penalty in the amount of Seventy-Five Thousand Dollars ($75,000).

We will review the effectiveness of your corrective actionc l

during a subsequent inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2 Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Room.

Sincerely,

[

~

80

. W&

. Tay)Ir, Deputy Executive Director O.8 ar s gg for Regional Operations M

Enclosure:

Order Imposing Civil gg Monetary Penalty with Appendix ws cc w/ enclosure:

See Next Page Ioco a.o CERTIFIED MAIL KLiUHN KLLLIFI REQUESTED fl

J Illinois Power Company -

cc w/ enclosure:.

D. P. Hall, Vice President R. D. Freeman, Manager, Nuclear Station Engineering Department Licensing Fee Management Branch Resident Inspector, RIII Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance Division, Sargent & Lundy Engineers David Rosenblatt, Governor's Office of Consumer Services Sheldon Zabel, Esquire, Schiff, Hardin, & Waite L. Larson, Project Manager, General Electric Company Chairman of DeWitt County Illinois Department of Nuclear Safety D. Schopfer, Project Manager, Sargent & Lundy Engineers 4

I I

1 a

i

-