7
. - - - -
.
~ '
-
.
OCT 191988
Docket No. 50-346
Toledo Edison Company
ATTN: Mr. Donald Shelton
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. Dennis Kubicki
and Joseph Ulie of the NRC on September 12-16 and October 11, 1988, of the fire
protection program at the Davis-Besse Nuclear Power Station authorized by NRC
Operating 1.icense No. NPF-3, and to the discussion of our findings with yourself
and other menbers of your staff at the conclusion of the insp*ction. This
inspection involved a limited scope fire protection program m iew including
a followup review of actions taken by your staff to resolve previously
identified NRC findings.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, you identified that certain of your fire watch program
activities appeared to be in violation of NRC requirements, as described in the
enclosed Notice.
You also identified that your contractor implementing fire
watch requirements was falsifying records and you terminated that contract. With
respect to this item, the inspection showed that actions had been taken to
correct the root cause of the identified examples of the violation and to
prevent recurrence. Our understanding of your corrective actions are described
in Paragraph 3 of the enclosed inspection report. Consequently, no reply to
this violation is required and we have no further questions regarding this
matter at this time. We generally do not cite licensee identified violations
meeting certain criteria; however, because of the nature and scope of these
deficienc'es, we are fonnally documenting this violation. The NRC will
continue to monitor your oversight of the fire watch program since this
program, in part, was one of the compensatory measures previously required
to permit plant restart for interim operation untti the Davis-Besse Plant's
confonnance to the requirements of 10 CFR 50, Appendix R have been fully
accomplished.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this
letter and the enclosures will be placed in the NRC Public Document Room.
l
'
- d M U $ w-
4 60/
-
_
__ ____ -_____ ____ _ _ _ .
_ __ __ ___ _______ -_______ _________ _ _____ ________ _____ ___ -__-________-_ ________ ______-__________
.
.
.
-
,
Toledo Edison Company
2
OCT 191933
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980 PL 96-511.
We will gladly discuss any questions you hav.? concerning this inspection.
.
Sincerely,
gggmAL ?!GNED By IdBERT J. f'lLLE2
~
a
Hubert J. Miller, Director
Division of Reactor Safety
Enclosures:
1.
2.
Inspection Report
.
No.50-346/88028(ORS)
cc w/ enclosures:
!
L. Storz, Plant lunager
i
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
i
Harold W. Kohn, Ohio E M
James W. Harris, State of Ohio
,
,
Robert M. Q41111n, Ohio
l
Departmera of Health
l
State of Ohio, Public
Utilities Conmission
.,
i
A. Datta, NL/S
C. McCracken, NRR/ECEB
j
A. Krasepoulos, Rl/DRS
G. Wiseman. Rll/DRS
.i
"
A. Singh, FIV/DRS
l
C. Ranisey, RV/DRC
I
bec:
J. Liebenan, OE
'
'
E. Pawlik, 01: Rill
.
i
J
av, v.-sw2 m uu<+r
i
- "" Mnyts v4.N uWWWd
Na m e htr g
kIII
Rlll
RI
RI
RIII
P.III
R I
I
W
M )
W
f
'
'
1
w ie/ims
K ic
Gardner
D ayette /
eil
e
arrison
iiler
i
- * , WB
s.H\\n
,pg
(o a)m
- h
sc/nl(t' wlpff&
-
-
-
-