Final Deficiency Rept 55(e)-84-06 Re Welds W/Inadequate Surface Preparation for Liquid Penetrant Exam on Main Steam Safety & Relief Valve,Vents & Drains Sys Piping.Initially Reported on 840210.Repair of 151 Welds Complete
ML20204H878
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/17/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
55(E)-84-06, 55(E)-84-6, NMP2L-0205, NMP2L-205, NUDOCS 8411120402
Download: ML20204H878 (2)


Text

7x a

.x-M Y NIAGARA RUMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE, N Y.13202/ TELEPHONE (315) 474-1511 October 17, 1984 (NMP2L 0205)

Mr. R..W.

Starostecki, Director U. S. Nuclear Regulatory Commission Region I' Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is a final report - in accordance with 10CFR50.55(e) for the problem concerning liquid penetrant examination of wel ds performed by ITT Grinnell.

This. problem was reported via tel-con to S. Collins of your staff on February 10, 1984 An interim report was submitted via our letter dated March 8,1984 Very truly yours, C. Y. Manga Vice President Nuclear Engineering and Licensing CVM/GG/pbd xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gram, NRC Resident Inspector Project File (2) 8411120402 841017 1

PDR ADOCK 05000410 tJ S

PDR li? A ]

=

- ~..

.t Ao-NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT - UNIT 2

' DOCKET NO. 50-410 Final Report for a Problem Concerning Liquid Penetrant Examination

.(55(e) 06)

Description of the Problem The problem pertains to liquid penetrant examination of certain welds performed by ITT Grinnell.

During the - Nuclear Regulatory Commission Construction Appraisal Team Inspection, it was observed that some welds in the main. steam. safety and relief valve, vents, and drains system piping had

- inadequate surface preparation _ for the liquid penetrant examination.

Reexamination had also revealed some rejectable linear indications.

The reexamination by ITT Grinnell of previously examined accessible welds in the main steam and. relief valve, vents, and drains system has found that of i

- 188 welds inspected,151 were found to have discrepancies and or unacceptable surface conditions.

The 151 welds have since been reworked or repaired as required to an acceptable condition.

This reexamination is documented by Stone and Webster Type C Inspection Report No. QP4G0006.

In addition to the above, a reexamination was performed on other previously t

examined accessible welds to provide additional assurance of the ITT Grinnell liquid penetrant examination program.. The results of this examination were stated in our letter dated. May 4,1984 to Violation B, Example 5 of the Construction Appraisal Team Inspection..

Analysis of Safety Implications A detailed investigation of the welds that were repaired or rewelded was not l

performed to determine the effect of inadequate surface preparation - on the safety of operations of the plant because the corrective action detailed above has been taken.

However, since these welds are sa fety-related, a remote possibility existed that had this condition remained uncorrected, the safety of operations of the plant could have been adversely affected.

- Corrective Action 1.

Corrective action has been taken as indicated above.

2..

Other corrective and preventive actions were outlined in our letter dated May 4, 1984, to the Nuclear Regulatory Commission in response to the Construction Appraisal Team Inspection.

t t

.e w

l

>g*t--L-f

-1r-,r v

-at f =' meQ+-

e we ag.e egiev ey--m-m-*

w-gg.--ar.

er-t p*.se_-Ta.me er,pwery Wwp 9 up--www-g

_tve s. es.trumus-a-oWa-ii++wegy-e 7 - e eere 4-=r a ww y r 91--y#g'T-==

gr +w M CF