Forwards Insp Repts 50-277/88-36 & 50-278/88-36 on 880926-28.No Violations Noted
ML20204H820
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/17/1988
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20204H823 List:
References
NUDOCS 8810240482
Download: ML20204H820 (2)


See also: IR 05000277/1988036

Text

_

..

..

.

.

OCT 11 19BB

Decket Nos.

50-277

License Nos. DPR-44

50-278

DPR-56

Philadelphia Electric Company

ATTN: Mr. C. A. McNeill

Executive Vice President

Nuclear

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Report Nos. 50-277/88-36 and 50-278/88-36

Mr.pection of your annual emergency preparedness exercise

A routine safet

ins C. Conklin of this office, and other members of an NRC

was conducted b

team, un Septem er 26-28, 1988, at the Peach Bottom Atomic Power Station,

your staff at the conclusion of the inspection.gs were held by Mr. Fox with

Delta, Pennsylvania. Discussions of our findin

Areas examined during this inspection are described in the NRC Region I

inspection report which is enclosed. Within these areas, the inspection

consisted of selective examination of procedures and repre::entative records,

interviews with personnel, observations by the inspectors and follow-up of

findings identified during previous emergency preparedness inspections and

exercises.

Within the scope of this inspection, no violations were identified.

It was

determined that your emergency response actions were adequate to provide

protective measures for the health and safety of the public.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincerely

i

g g7,

.. a a. cdtsmy

Ronald R. Bellamy, Chief

FacilitiesRadiological$afety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure:

NRC Region I Combined Inspectioq Report Nos. 50-277/88-36 and 50-278/88-36

?f~

C . m .... ...; g

ac.

5

.:

,;

0010240482 estogy

!ll

PDR

ADOCK 05000277

l

0

PDC

-

-

.

..

.

Philadelphia Electric Company

2

OCT 171999

John / enc 1:

cc w

S. Kemper, Sr., Senior Vice President - Nuclear

E. C. Kistner, Chairman, Nuclear Review Board

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

Dickinson M Smith, Vice President, Peach Bottom Atomic Power Station

J. W. Gallagher, Vice President, Nuclear Services

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic

Electric

Bryan W. Gorman, Manager, External Affairs

John F. Franz, Plant Manager,(Without Report)

Peach Bottom Atomic Power Station

Troy B. Conner Jr

EugeneJ.Bradley,.,EsquireEsquire, Assistant General Counsel

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette Power Plant Siting, Nuclear Evaluations

W.M.Alden, Director,LicensingSection

Doris Poulsen, Secretary of Harford County Council

Public Document Room PDR)

Local Public Document (Room (LPDR)

i

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room

Management Assistant,(with concurrences)

DRMA

J. Linville,DRP Section Chie(w/o enc 1)

f

T. Johnson

K. Abraham, SRI, Peach Bottom

4

i

, PA0

-

Robert J. Bores, DRSS

R. Martin, NRR

l

B. Clayton, EDO

>

)

!

34

Conklin

La

s

Bellamg8

10/l(/88

10

10/p/

0FFICIAL RECORD COPY

,

i

!

.