Revised Final Deficiency Rept Re Incomplete Fill Detected in Biological Shield Wall Concrete of Reactor Bldgs.Due to Const Scheduling,Unit 1 & 2 Repairs Will Be Completed by 830831 & 1231,respectively
ML20204F881
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/19/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, RDC-42(81), NUDOCS 8305020308
Download: ML20204F881 (1)


Text

l P.O. Box 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLOG. - 55 PUBLICSOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN April 19, 1983 VICE PRESIDENT PRINCIPAL STAFF e NUCLEAR VSA j m_,- ifJF {

Mr. James G. Keppler 0/RA :5CS _f Regional Administrator, Region III . A/j3L i3AO -

Office of Inspection and Enforcement / v?RP ljjA ! i U.S. Nuclear Regulatory Commission 21 RC l t 799 Roosevelt Road SfP

)

i Glen Ellyn, Illinois 60137 tl i 1 J

O' I I LEl I Il Perry Nuclear Power Plant RE:

Docket Nos. 50-440; 50-441

' Incomplete Fill Detected in Biological Shield Wall Concrete, Units 1 and 2 [RDC 42(81)]

Dear Mr. Keppler:

Our final report dated June 14, 1982, and letter dated December 10, 1982, concerning incomplete fill of the biological shield walls of both reactor buildirgs stated that repairs to the Unit 1 bioshield walls were to be com-pleted by May 1,1983, a.2d Unit 2 by July 1,1983. Due to construction scheduling, it is now anticipated that Unit I repairs will be completed by August 31, 1983, and Unit 2 repairs by December 31, 1983.

Please call if there are any questions.

Sincerely, 777. -pc Murray R. Edelman Vice President Nuclear Group MRE:pab cc: Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 Z Eel J 8305020309 830419 t.PR 2 2 1983 PDR ADOCK 05000440 S PDR