Final Deficiency Rept Re Dowel Counterbore in Link Rod in Standby Diesel Engine.Initially Reported on 801008.Link Rod Inspected.Deficiency Determined Not Reportable Per 10CFR50.55(e)
ML20067D851
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/10/1982
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, RDC-20(80), NUDOCS 8212210370
Download: ML20067D851 (1)


Text

T H E C L iil/ E L A N D E L E C T R I C I L L U M I N A T ! N G C O M P A :: V P.o. Box 5000 - CLEVELAND, oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN December 10, 1982 WCE BES10ENT NUCMAR Mr. James G. Keppler Rrgional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Standby Diesel Generators, Potential Link Rod Deficiency

[RDC 20(80)]

Drar Mr. Keppler:

This letter serves as the Final Report pursuant to 10CFR50.55(e) concerning the potential deficiency involving dowel counterbore in the link rod in the Transamerica Delaval Incor-porated (TDI) standby diesel engine. The Cleveland Electric Illuminating Company originally reported this item to Mr. James Konklin of your of fice on October 8,1980.

Sub sequent correspondence included our interim report dated November 3, 1980, and letters dated November 25, 1981, and May 5, 1982. This letter provides the results of our evaluation.

Evaluation of Deficiency Upon receipt of notification from TDI that a 10CFR21 report on this condition had been filed on September 19, 1980, the decision was made to conduct the mr.,cfacturer's recom-mended inspection concurrent with appropriate diesel engine installat; on activities. The condition was therefore reperted as a potential significant deficiency pursuant to 10CFR50.55(e) pending completion of our evaluation.

To complete our evaluation an inspection has been performed under the supervision of a TDI service representative in accordance with the TDI recommendation dated April 20, 1982.

The results ata that the link rod deficiency does not exist at the Perry Nuclear Power Plant; therefore, the condition is not reportable under 10CFR50.55(e).

Very truly yours, 82122 O

PDR A P

Murray R. Edelman S

Vice President Nucle. Group MRE:pab cc:

Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch DEC 15 E82 Washington, D.C.

20555 Z[A7