Submits Statement on Actions Re Recommendations Made by Us Comptroller General in Rept Before Licensing Floating Nuc Pwr Plants,Many Answere Are Needed. Forwards NRC Staff Responses,Related Correspondence & NUREG Repts.W/Encl
ML20204C928
Person / Time
Site: Atlantic Nuclear Power Plant PSEG icon.png
Issue date: 11/24/1978
From: Gossick L
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Udall M
HOUSE OF REP.
Shared Package
ML19261A261 List:
References
NUDOCS 7812050293
Download: ML20204C928 (23)


Text

. ._ _ . . _ - _ .

b UNITED STATES p ;>k n  !

h gp[ ocnq ,

g NUCLEAR REGULATORY COMMISSION wASNiNoroN, D. C.20585 S y***** f  ;

+

The Honorable Morris K..Udall, Chairman Subcommittee on Energy and the Environment Committse on. Interior and Insular Affairs <

United States' House of Representatives Washington, D. C. 20515 t

Dear Mr. Chairman:

Pursuant ~to Section 236 of the Legislative Reorganization Act of 1970, the Nuclear Regulatory Commission (NRC) hereby submits -

a statement on the actions that have, are being, or will be taken with regard to the recommendations.made by.the Comptroller General - .

of the United States in a report entitled, "Before Liceasing

- f Floating Nuclear Power Plants, .Many Answers Are Needed."

The responses to these recommendations, which are ermDsed,- were -

prepared by the NRC staff with no prior review'or comment by the Commissioners. .This approach to satisfying the requirements of the above-referenced statute was' deemed appropriate under the unusual circumstances present in this matter. . Many.of,the points.

raised.in the.GA0. report requiredan NRC response which involved a discussion of' issues that are. presently 'oeing litigated in a contested on-the-record'public hearing on the. application of the Offshore Power Systems for an NRC manufacturing license for float-ing nuclear power plants. Because the rulings and decisions on those ' issues by the presiding Atomic Safety and Licensing Board will very likely come before the Commissioners for review in connection with their adjudicatory responsibilities, it would not.

be appropriate for the Commission to comment on these issues at this time. t Sincerely, E

-(stgoed) Lee V Gowief e

Lee V. Gossick ,

Executive Director for Operations 1

Enclosures:

l '. NRC Gen.eral Views on the'GA0 Report

2. NRC Responses to the GA0 Recommendations '
3. Ltr. fm USCG' dated 10/13/78
4. Ltr. fm Baker to Canfield
5. NUREG-0054-(Suppl. 2), 0056, 0127, 0440, 00E8, 0436, 0394'
6. 39FR2124 cc: Rep. Robert Bauman ,