Submits Statement on Actions Re Recommendations Made by Us Comptroller General in Rept Before Licensing Floating Nuc Pwr Plants,Many Answers Are Needed.Forwards NRC Staff Responses,Related Correspondence & NUREG Repts.W/Encl
ML20204C915
Person / Time
Site: Atlantic Nuclear Power Plant PSEG icon.png
Issue date: 11/24/1978
From: Gossick L
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Dingell J
HOUSE OF REP.
Shared Package
ML19261A261 List:
References
NUDOCS 7812050289
Download: ML20204C915 (23)


Text

,

UNITED STATES hi

[

y" NUCLEAR REGULATORY COMMISSION h

WASHINGTON, D. C. 20585 E

T..w.../

The Honorable John D. Dingell,, Chairman Subcommittee on Energy and Power Committee on Interstate and Foreign Commerce United States House of Representatives Washington, D. C.

20515

Dear Mr. Chairman:

Pursuant to Section 236 of the Legislative Reorganization Act of 1970, the Nuclear Regulatory Commission (NRC) hereby submits d statement on the actions that have, are being, or will be taken with regard to the recommendations made.by the Comptroller General of the United States in a report entitled, "Before Licensing Floating huclear Power Plants, Many Answers Are Needed."

The responses to these recommendations, which are enclosed, were prepared by the NRC' staff with 'no prior review or comment by the Commissioners. This approach to satisfying the requirements of the above-referenced statute'was' deemed appropriate under the

' unusual circumstances present in this matter.

Many of the points raised.in the GA0 report required an NRC response which involved a discussion of issues that are presently being litigated in a contested on-the-record public hearing on the application of the Offshore Power Systems for an NRC manufacturing license for float-ing nuclear power plants.

Because the rulings and decisions on those issues by the presiding Atomic Safety and Licensing Board will very likely come before the Commissioners-for. review in connection with their adjudicatory responsibilities, it would not be appropriate for the Commission to comment on these issues at this time.

Sincerely, glaced) Lee v c,ev Lee V. Gossick Executive Director for Operations

Enclosures:

1.

NRC General Views ce the GA0 Report i

2.

NRC Responses to the GAO Recommendations 3.

Ltr. fm USCG dated 10/13/78 4.

Ltr. fm Baker to Canfield 5.

NUREG-0054 (Suppl. 2), 0056, 0127, 0440, 0058, 0436, 0394 l

6.

39FR2124 cc:

Rep. Clarence J. Brown 7812050ABCl